Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹28.7 L
EMD Value
₹28,700
Closing Date
27 Nov 2026, 6:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Chief Officer Kadi nagarpalika
PROVIDING AND LAYING OF DRAINAGE PIPE LINE FROM GOPALNAGAR TO ZADPUMATA TEMPLE & FROM RAJIVNAGAR TO HANUMANJI TEMPLE, THOL ROAD FOR KADI NAGARPALIKA AT KADI. DIST. MAHESANA UNDER 15TH FINANCE COMMISSION 2025-26 GRANT.
364215
1313/3/2026-27
Open
Civil Works - Others
Works
Mehsana
12 documents required · 12 mandatory
₹1,770
Chief Officer Kadi nagarpalika
₹28,700
7 Nov 2026
7 Nov 2026
7 Nov 2026
27 Nov 2026
7 Nov 2026
120 days
NAME OF WORK : PROVIDING AND LAYING OF DRAINAGE PIPE LINE FROM GOPALNAGAR TO ZADPUMATA
TEMPLE & FROM RAJIVNAGAR TO HANUMANJI TEMPLE, THOL ROAD FOR KADI
NAGARPALIKA AT KADI. DIST. MAHESANA UNDER 15TH FINANCE COMMISSION 2025-26
Schedule No Name of work Amount
Construction of Drainage Line from Gopalnagar to Zadpumata Temple, Thol Road,
Kadi Nagarpalika area, Kadi
Construction of Drainage Line from Rajivnagar to Hanumanji Temple, Thol Road,
Kadi Nagarpalika area, Kadi
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing
charges, after deducting the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted
from contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all
2) conditions, site moisture weather etc.
In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the
difference in consumption of cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender.
However no extra payment shall be made for use of additional Quantity of cement as per actual concrete mix design. Concrete mix
design shall be done in GERI laboratory only.
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details
4) of work and amount involved at site without any payment as directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be
5) paid by the CHIEF OFFICER and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills
of the works. (As per G.R. (R&B) Deptt., No. TNC/1085/4/C dtd. 20.12.91.
6) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of
7) the Gujarat Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation
of equipments and conditions of service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
The contractor is solely responsible to bare all applicable taxes excluding GST and department will not entertain any contractor
representation to reimburse any financial burden due to applicable taxes.
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
KADI NAGARPALIKA
NAME OF WORK : Construction of Drainage Line from Gopalnagar to Zadpumata Temple, Thol Road, Kadi Nagarpalika area, Kadi
SCHEDULE - "B-1"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
1 378.00 Excavation for pipeline trenches 102.35 Rupees One Hundred Two and Cum
Excavation for pipe line trenches for water supply, Thirty Five Paise
sewerage line, manhole etc. all with shoring and
struting if required as per required gradient and line
including safely provisions using the site rails and
stacking excavated stuff including up to all required
lead cleaning the site etc. complete for all lifts and
strata as specified up to 1.50 mt. depth
In all sorts of soil and soft murrum
2 283.00 -As above- 155.25 Rupees One Hundred Fifty Five Cum
In Hard Murrum, boulders incl. Macadam road. and Twenty Five Paise
3 283.00 -As above- 427.80 Rupees Four Hundred Twenty Cum
In Hard rock and / or in C.C. 1:2:4 or RCC with Seven and Eighty Paise
blasting , breaking, chiseling, or by chiseling/breaking
4 376.00 Providing and supplying ISI Standard NP3 Test 762.55 Rupees Seven Hundred Sixty Two Rmt
pressure 0.7 Kg/Sq.cm R.C.C. Pipes (Of Sulphate and Fifty Five Paise
Resisting Cement ) In standard lengths of following
class and diameter Suitable for either collar joints or
rubber ring joints including all taxes, insurance,
transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to
departmental stores,
stacking etc. complete.
Note : One collar should be supplied with each full
length plain ended RCC pipe, cost included in rates.
One rubber ring should be suppllied with each full
length socketed pipe, cost included in rates.
(5) 300 mm dia.
5 376.00 Lowering, laying and jointing R.C.C. pipes in C.M. 120.19 Rupees One Hundred Twenty and Rmt
1:1 1/2 of following diameter in proper position, grade Nineteen Paise
and alignment at all level as directed by Engineer-in-
charge including conveyance from stores to site of
work, labour, giving hydraulic testing as per ISI code.
6 13.00 R.C.C. precast manhole, frame and cover, 1132.21 Rupees One Thousand One No.
manufacture, supply and delivery at store or site of Hundred Thirty Two and Twenty
work precast R.C.C. M200 frame and cover, suitable One Paise
to drainage manhole and as per type design and
drawing including cost of reinforcement, MS angles or
flat, curing, mold work etc.complete.
(1) Heavy Duty Frame suitable for 50cm opening of
KADI NAGARPALIKA
NAME OF WORK : Construction of Drainage Line from Gopalnagar to Zadpumata Temple, Thol Road, Kadi Nagarpalika area, Kadi
SCHEDULE - "B-1"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
7 13.00 R.C.C. precast manhole, frame and cover, 1184.73 Rupees One Thousand One No.
manufacture, supply and delivery at store or site of Hundred Eighty Four and Seventy
work precast R.C.C. M200 frame and cover, suitable Three Paise
to drainage manhole and as per type design and
drawing including cost of reinforcement, MS angles or
flat, curing, mold work etc.complete.
(2) Heavy Duty Cover suitable for 50cm opening of
8 13.00 Providing and constructing Sewer manholes, scraper 46199.42 Rupees Forty Six Thousand One No.
manholes and unit house connection chamber, as per Hundred Ninety Nine and Forty
the type design in brick masonry in C. M. 1:5 and Two Paise
inside and outside 20mm thick plastering in C. M. 1:3
necessary 100 mm coping with reinforcement in
R.C.C.M. 200 fixing C. I. steps and fixing manhole
frame and covers (But excluding supply of manhole
frame and covers) over manholes and house
connection chambers and fixing Manhole covers (but
excluding supplying of manhole covers) over scraper
manhole etc. complete, providing and fixing safety
chain wherever necessary as per the stipulations in the
type design complete as per latest CPHEEO manual.
(excl. excavation).
(B-2) Manhole type 'B' - Circular having inside
diameter 1500 for depth up to 3.00 m. (150mm to
600mm dia. sewer)
9 42.30 Providing and casting in situ mass concrete in 1:4:8 3426.93 Rupees Three Thousand Four Cum
proportion using granite quartzite trap metal of size Hundred Twenty Six and Ninety
25mm to 40mm including consolidation curing etc. Three Paise
10 581.73 Refilling the pipeline trenches incl. ramming, 25.30 Rupees Twenty Five and Thirty Cum
watering, consolidating disposal of surplus stuff as Paise
directed within a radius of 3 km
11 942.53 Dewatering in all sorts and soft murrum, hard murrum 31.05 Rupees Thirty One and Five Paise Cum
and boulders, soft rock, Hard rock, up to 3.0m depth
12 25.00 Restoration 818.80 Rupees Eight Hundred Eighteen LS
Add for restoration of infrastructure like Kharkuva, and Eighty Paise
Electrical Line, Telephone Cable all types, water lines,
Gas line, Septic tanks etc.
14.b Cable Repairing
KADI NAGARPALIKA
NAME OF WORK : Construction of Drainage Line from Gopalnagar to Zadpumata Temple, Thol Road, Kadi Nagarpalika area, Kadi
SCHEDULE - "B-1"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
13 10.00 Labour charges for repairing leakage in CI/DI pipeline 5315.30 Rupees Five Thousand Three Nos.
of following diameter at different places including Hundred Fifteen and Thirty Paise
necessary excavation manually or by machinery,
removing of mud, dewatering, cleaning of pipe, cutting
of pipe jointing and repairing using CID joints
including CID joints, rubber rings, nut bolts, hiring
excavator, Hydra/Crane, dewatering machine, fuel,
operator etc complete (Including cost of jointing
material but excluding cost of pipe)
14 10.00 Labour charges for repairing leakage in PVC pipeline 1124.70 Rupees One Thousand One Nos.
of following diameter at different places including Hundred Twenty Four and
necessary excavation manually or by machinery, Seventy Paise
removing of mud, dewatering, cleaning of pipe and
leakage portion, cutting the pipeline & removing piece
of pipe from trench with inclusive of mechanical
devices JCB, Hydra/Crain if necessary & labours
required with providing material such couplers,
solution etc. complete. (Incl. all material but Exclu.
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges, after deducting
the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all conditions, site moisture
In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference in consumption of
cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra payment shall be made for use of
additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in GERI laboratory only.
KADI NAGARPALIKA
NAME OF WORK : Construction of Drainage Line from Gopalnagar to Zadpumata Temple, Thol Road, Kadi Nagarpalika area, Kadi
SCHEDULE - "B-1"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of work and amount
4) involved at site without any payment as directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid by the CHIEF
5) OFFICER and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills of the works. (As per G.R. (R&B) Deptt.,
6) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat
7) Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of equipments and conditions of
service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
The contractor is solely responsible to bare all applicable taxes excluding GST. and department will not entertain any contractor representation to reimburse any
9) financial burden due to applicable taxes.
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
KADI NAGARPALIKA
NAME OF WORK : Construction of Drainage Line from Rajivnagar to Hanumanji Temple, Thol Road, Kadi Nagarpalika area, Kadi
SCHEDULE - "B-2"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
1 370.00 Excavation for pipeline trenches 102.35 Rupees One Hundred Two and Cum
Excavation for pipe line trenches for water supply, Thirty Five Paise
sewerage line, manhole etc. all with shoring and
struting if required as per required gradient and line
including safely provisions using the site rails and
stacking excavated stuff including up to all required
lead cleaning the site etc. complete for all lifts and
strata as specified up to 1.50 mt. depth
In all sorts of soil and soft murrum
2 278.00 -As above- 155.25 Rupees One Hundred Fifty Five Cum
In Hard Murrum, boulders incl. Macadam road. and Twenty Five Paise
3 278.00 -As above- 427.80 Rupees Four Hundred Twenty Cum
In Hard rock and / or in C.C. 1:2:4 or RCC with Seven and Eighty Paise
blasting , breaking, chiseling, or by chiseling/breaking
4 368.00 Providing and supplying ISI Standard NP3 Test 762.55 Rupees Seven Hundred Sixty Two Rmt
pressure 0.7 Kg/Sq.cm R.C.C. Pipes (Of Sulphate and Fifty Five Paise
Resisting Cement ) In standard lengths of following
class and diameter Suitable for either collar joints or
rubber ring joints including all taxes, insurance,
transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to
departmental stores,
stacking etc. complete.
Note : One collar should be supplied with each full
length plain ended RCC pipe, cost included in rates.
One rubber ring should be suppllied with each full
length socketed pipe, cost included in rates.
(5) 300 mm dia.
5 368.00 Lowering, laying and jointing R.C.C. pipes in C.M. 120.19 Rupees One Hundred Twenty and Rmt
1:1 1/2 of following diameter in proper position, grade Nineteen Paise
and alignment at all level as directed by Engineer-in-
charge including conveyance from stores to site of
work, labour, giving hydraulic testing as per ISI code.
6 13.00 R.C.C. precast manhole, frame and cover, 1132.21 Rupees One Thousand One No.
manufacture, supply and delivery at store or site of Hundred Thirty Two and Twenty
work precast R.C.C. M200 frame and cover, suitable One Paise
to drainage manhole and as per type design and
drawing including cost of reinforcement, MS angles or
flat, curing, mold work etc.complete.
(1) Heavy Duty Frame suitable for 50cm opening of
KADI NAGARPALIKA
NAME OF WORK : Construction of Drainage Line from Rajivnagar to Hanumanji Temple, Thol Road, Kadi Nagarpalika area, Kadi
SCHEDULE - "B-2"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
7 13.00 R.C.C. precast manhole, frame and cover, 1184.73 Rupees One Thousand One No.
manufacture, supply and delivery at store or site of Hundred Eighty Four and Seventy
work precast R.C.C. M200 frame and cover, suitable Three Paise
to drainage manhole and as per type design and
drawing including cost of reinforcement, MS angles or
flat, curing, mold work etc.complete.
(2) Heavy Duty Cover suitable for 50cm opening of
8 13.00 Providing and constructing Sewer manholes, scraper 46199.42 Rupees Forty Six Thousand One No.
manholes and unit house connection chamber, as per Hundred Ninety Nine and Forty
the type design in brick masonry in C. M. 1:5 and Two Paise
inside and outside 20mm thick plastering in C. M. 1:3
necessary 100 mm coping with reinforcement in
R.C.C.M. 200 fixing C. I. steps and fixing manhole
frame and covers (But excluding supply of manhole
frame and covers) over manholes and house
connection chambers and fixing Manhole covers (but
excluding supplying of manhole covers) over scraper
manhole etc. complete, providing and fixing safety
chain wherever necessary as per the stipulations in the
type design complete as per latest CPHEEO manual.
(excl. excavation).
(B-2) Manhole type 'B' - Circular having inside
diameter 1500 for depth up to 3.00 m. (150mm to
600mm dia. sewer)
9 41.40 Providing and casting in situ mass concrete in 1:4:8 3426.93 Rupees Three Thousand Four Cum
proportion using granite quartzite trap metal of size Hundred Twenty Six and Ninety
25mm to 40mm including consolidation curing etc. Three Paise
10 566.89 Refilling the pipeline trenches incl. ramming, 25.30 Rupees Twenty Five and Thirty Cum
watering, consolidating disposal of surplus stuff as Paise
directed within a radius of 3 km
11 924.53 Dewatering in all sorts and soft murrum, hard murrum 31.05 Rupees Thirty One and Five Paise Cum
and boulders, soft rock, Hard rock, up to 3.0m depth
12 25.00 Restoration 818.80 Rupees Eight Hundred Eighteen LS
Add for restoration of infrastructure like Kharkuva, and Eighty Paise
Electrical Line, Telephone Cable all types, water lines,
Gas line, Septic tanks etc.
14.b Cable Repairing
KADI NAGARPALIKA
NAME OF WORK : Construction of Drainage Line from Rajivnagar to Hanumanji Temple, Thol Road, Kadi Nagarpalika area, Kadi
SCHEDULE - "B-2"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
13 10.00 Labour charges for repairing leakage in CI/DI pipeline 5315.30 Rupees Five Thousand Three Nos.
of following diameter at different places including Hundred Fifteen and Thirty Paise
necessary excavation manually or by machinery,
removing of mud, dewatering, cleaning of pipe, cutting
of pipe jointing and repairing using CID joints
including CID joints, rubber rings, nut bolts, hiring
excavator, Hydra/Crane, dewatering machine, fuel,
operator etc complete (Including cost of jointing
material but excluding cost of pipe)
14 10.00 Labour charges for repairing leakage in PVC pipeline 1124.70 Rupees One Thousand One Nos.
of following diameter at different places including Hundred Twenty Four and
necessary excavation manually or by machinery, Seventy Paise
removing of mud, dewatering, cleaning of pipe and
leakage portion, cutting the pipeline & removing piece
of pipe from trench with inclusive of mechanical
devices JCB, Hydra/Crain if necessary & labours
required with providing material such couplers,
solution etc. complete. (Incl. all material but Exclu.
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges, after deducting
the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all conditions, site moisture
In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference in consumption of
cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra payment shall be made for use of
additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in GERI laboratory only.
KADI NAGARPALIKA
NAME OF WORK : Construction of Drainage Line from Rajivnagar to Hanumanji Temple, Thol Road, Kadi Nagarpalika area, Kadi
SCHEDULE - "B-2"
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of work and amount
4) involved at site without any payment as directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid by the CHIEF
5) OFFICER and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills of the works. (As per G.R. (R&B) Deptt.,
6) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat
7) Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of equipments and conditions of
service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
The contractor is solely responsible to bare all applicable taxes excluding GST. and department will not entertain any contractor representation to reimburse any
9) financial burden due to applicable taxes.
Signature of contractor CHIEF OFFICER
KADI NAGARPALIKA
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
00 TITLE Page.pdf
01. Tender Notice.pdf
03. Form B1.pdf
02 Technical Bid (1).pdf
09 MORTH Specification Book.pdf
10 Building-Specification.pdf
11 Road Specification.pdf
12 Test Require For Construction Material.pdf
17. Price bid.pdf
18. Schedule B .pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .