Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹6.8 L
Closing Date
24 Aug 2026, 6:00 pmClosed
Joint Director (Mechanical)
Comprehensive Operation and Maintenance contract for 5 (Five) Years of Heavy Duty Truck Mounted Dewatering Pump ‐ 03 Nos. As per AMC tender specifications, scope of work & terms ‐ conditions.
333962
21/2026-27
Open
Miscellaneous Works
Works
Ahmedabad
3 documents required · 3 mandatory
₹3,600
Municipal Commissioner, Ahmedabad
₹6.8 L
11 Aug 2026
11 Aug 2026
11 Aug 2026
24 Aug 2026
11 Aug 2026
3. Opening of online Technical Bid 27th August 2026 11.00 Hrs onwards
4. Opening of Price Bid Will be intimated to technically qualified
5. Bid Validity 120 Days
6. Tender Fee Rs.3,600/‐
JOINT DIRECTOR (MECHANICAL)
AHMEDABAD MUNICIPAL CORPORATION
CENTRAL WORKSHOP
OPP. OLD LATHI BAZZAR, JAGNNATHJI ROAD, JAMALPUR,
AHMEDABAD ‐ (GUJARAT) ‐
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 -1-
1.0 TENDER NOTICE
1. Tender No: 21/ 2026‐27
2 Last date for Online tender
24th August 2026 up to 18.00 Hrs,
submission and time
3 Date of Tender Opening
(Technical bid) 27th August 2026 11.00 Hrs onwards
4 Name of the work Comprehensive Operation and Maintenance contract for 5 (Five)
Years of Heavy Duty Truck Mounted Dewatering Pump ‐ 03 Nos.
As per AMC tender specifications, scope of work & terms ‐
5 Tender fees Rs. 3,600/‐ (Rs. Three Thousand Six Hundred Only); to be
(Non Refundable) submitted in the form of D.D. / P.O. / BG. favour of Municipal
Commissioner, Ahmedabad of any Nationalized
Bank/Schedule bank/Banks mentioned in AMC circular and
payable at Ahmedabad; On Date 25th August 2026 up to
Hrs To be submitted to the Office of Joint Director
(Mechanical), Central Workshop, Ahmedabad Municipal
Corporation, Opp. Sahakari Lati Bazar, Nr. S.T.Bus stop,
Jaggannathji Road. Jamalpur. Ahmedabad ‐380022
6 E.M.D. Rs. 6,75,000/‐ (Rs. Six Lakhs Seventy Five Thousand); to be
submitted in the form of D.D. / P.O. / BG. in favour of Municipal
Commissioner, Ahmedabad of any Bank as mentioned in AMC
circular and payable at Ahmedabad; on Date 25th August
up to 16.00 Hrs to the Office of Joint Director (Mechanical),
Central Workshop, Ahmedabad Municipal Corporation, Opp.
Sahakari Lati Bazar, Nr. S.T. Bus stop, Jaggannathji Road.
Jamalpur. Ahmedabad ‐380022
7 Time Limit For Supply As per tender documents.
8 General Condition As per tender documents.
9 Performance Security As per tender documents.
10 Mode of Sending The By Hand delivery / Registered A.D. or Speed Post / Courier
Tender Fee, EMD etc. addressed to, Office of Joint Director (Mechanical), Central
Relevant Documents Workshop, Ahmedabad Municipal Corporation, Opp. Sahakari
Lati Bazar, Nr. S.T.Bus stop, Jaggannathji Road. Jamalpur.
Ahmedabad ‐380022.
Seal and Signature of the Bidder & Date: Joint Director Mechanical)
Ahmedabad Municipal Corporation
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 -2-
1.0 TENDER NOTICE
Comprehensive Operation and Maintenance contract for 5 (Five) Years of Heavy
Duty Truck Mounted Dewatering Pump ‐ 03 Nos. As per AMC tender
specifications, scope of work & terms ‐ conditions.
1. The Municipal Commissioner, Ahmedabad Municipal Corporation, invites detailed
bid from interested parties for the Comprehensive Operation and Maintenance
contract for 5 (Five) Years of Heavy Duty Truck Mounted Dewatering Pump ‐
Nos. As per AMC tender specifications, scope of work & terms ‐ conditions.
2. Sealed tenders, for the above work are invited from the bidders. The bidders shall be
a single entity bidding for the Project. Detailed PQ criteria are mentioned in tender.
All necessary documentary evidence shall be submitted along with the tender.
GENERAL DETAILS OF WORKS
Name of work: Comprehensive Operation and Maintenance contract for 5 (Five)
Years of Heavy Duty Truck Mounted Dewatering Pump ‐ 03 Nos. As per AMC
tender specifications, scope of work & terms ‐ conditions.
Tender Fee (Non‐refundable) and EMD :‐
Sr. Name Of Tender Tender Tender EMD Rs.
No. No. Fee Rs.
1 Comprehensive Operation and Maintenance 21/ 3,600/‐ 6,75,000/‐
contract for 5 (Five) Years of Heavy Duty Truck 2026‐27
Mounted Dewatering Pump ‐ 03 Nos. As per
AMC tender specifications, scope of work &
terms ‐ conditions.
Last date of submission of online bid 24th August 2026 up to 18.00 Hrs. through E
tendering only,
Address for submission of the Tender fee, EMD and supporting tender documents
Joint Director (Mechanical),
Central Workshop,
Ahmedabad Municipal Corporation,
Opp. Sahakari Lati Bazar, Nr. S.T.Bus stop,
Jaggannathji Road. Jamalpur. Ahmedabad ‐380022
Bid (Technical) Opening Date 27th August 2026 at 11.00 hrs onwards.
DOWNLOAD OF TENDER DOCUMENT
The tender document for these work are available on website
www.ahmedabadcity.gov.in or https://amc.nprocure.com or
https://tender .nprocure.com
The bidder shall pay the Tender Fee to the Ahmedabad Municipal Corporation and
shall have to attach the Demand draft / Pay order issued by any Nationalized
Bank/Schedule bank/Banks mentioned in AMC circular, in favour of Municipal
Commissioner, payable at Ahmedabad shall be attached with the Pre‐qualification
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 -3-
EARNEST MONEY DEPOSIT
The aforesaid BID must be accompanied by the Earnest Money Deposit as specified
in ‘General Details of Work’ section above. The Bid Security shall be in form of a
crossed demand draft / pay orders in favour of “The Municipal Commissioner;
Ahmedabad Municipal Corporation of any Bank as mentioned in AMC circular and
payable at Ahmedabad
SUBMISSION OF TENDER
The completed Tender document shall be submitted at the following address & price
bid through online only.
Tender copy must be accompanied by EMD in the form of Demand draft/ Pay order /
BG of Bank as mentioned in AMC circular only in favour of Municipal
Commissioner, Ahmedabad. The tenders not submitted in line with the tender
clauses and without Tender fee and EMD in the form specified, will be out rightly
rejected. The Technical bid of only those bidders will be evaluated who have remitted
tender fees and submitted EMD.
OPENING OF TENDER
The Technical bid of package will be opened as mentioned in ‘General Detail of
Work’ Section above, if there is any change, same will be conveyed to tenderers.
Intending bidders or their authorized representative who wish to participate in
tender opening can remain present on the due date and time. Price Bids / Financial
bids of only those bidders will be opened, who are successful in the qualification
Criteria and the Technical Evaluation. The date for price bid opening shall be
informed to the successful bidders at a later date after evaluation of technical bids.
‐ Tender (a complete set of bidding document) fee shall be Rs.3,600/‐ in the form of
Demand Draft/ Pay Order from any Nationalized Bank/Schedule bank/Banks
mentioned in AMC circular in favour of Municipal Commissioner, Ahmedabad,
payable at Ahmedabad, which shall be non refundable. The fees shall be paid on 25th
August 2026 up to 16.00 Hrs to the Office of Joint Director (Mechanical), Central
Workshop, and AMC. Ahmedabad.
‐ The tenders are uploaded on AMC’s website www.ahmedabadcity.gov.in or
https://amc.nprocure.com. or https://tender .nprocure.com
‐ Interested Bidders fulfilling the qualifying criteria shall fill online tender on https : //
amc.nprocure.com up to 24th August 2026 up to 18.00 Hrs, tender fees as mentioned
above shall be paid by the bidder on 25th August 2026 up to 16.00 Hrs to Office of
Joint Director (Mechanical), Central Workshop, AMC. Ahmedabad.
‐ All bids must be accompanied by Bid Security of the amount specified for the Works
in the above Table payable at Ahmedabad and drawn in favour of Ahmedabad
Municipal Corporation, Ahmedabad. Bid Security will have to be in any one of the
forms as specified in the tender documents.
‐ All Relevant supporting Documents of Bids must be delivered to Office of Joint
Director (Mechanical), Central Workshop, Ahmedabad Municipal Corporation, Opp.
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 -4-
Sahakari Lati Bazar, Nr. S.T.Bus stop, Jaggannathji Road. Jamalpur. Ahmedabad ‐
380022 on 25th August 2026 up to 16.00 Hrs.
‐ Information for online participation
Internet site address for e‐Tendering activities will be https://amc.nprocure.com
Interested bidders can view detailed tender notice and download tender documents
from the above mentioned website.
Bidders who wish to participate in online tender have to register with the website
through the “New User Registration” link provided on the home page. Bidder will
create login id & password on their own in registration process.
Bidders who wish to participate in this tender need to procure Digital Certificate as
per Information Technology Act‐2000 using that they can digitally sign their
electronic bids. Bidders can procure the same from any of the CCA approved
certifying agencies, or they may contact (n) code Solution at below mentioned
address and they will assist them in procuring the same. Bidders who already have a
valid Digital Certificate need not to procure the same. In case bidders need any
clarification regarding online participation, they can contact
M/S (n) code Solution 301, G.N.F.C. Info Tower, Near Grand Bhagwati Hotel,
E‐Mail:URL: https://amc.nprocure.com or https://tender.nprocure.com
Bidders who wish to participate in e‐Tender need to fill data in predefined forms of
tender fee, EMD, PQ (Technical) or experience details and Price bid only.
Bidder should upload scan copies of reference documents in support of their
eligibility of the bid.
After filling data in predefined forms bidders need to click on final submission link to
submit their encrypted bid. Bidder should also submit Document Fees, EMD,
Technical bid document (those which are not uploaded) & Reference Documents in
hard copy to the department.
GENERAL INSTRUCTIONS
1. The cost of Bid document i.e. tender fees will not be refunded under any
2. EMD in the form specified in Bid document only shall be accepted.
3. The offer shall be valid for 120 days from the date of opening of Technical Bid.
4. Tender offers without tender fees, Earnest Money Deposit (EMD) and which do not
fulfil all or any of the condition or submitted incomplete in any respect will be
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 -5-
5. Conditional tender shall not be accepted. Municipal Commissioner, Ahmedabad
reserves the right to accept or reject such tenders without assigning any reason
6. Tenderers should carefully fill in the rates against the items mentioned in the
schedule and scrutinize them before submitting the tender. Any variation in rates etc.
will not be allowed on any ground such as mistake or misunderstanding etc. after the
tender has been recommended or accepted.
7. The tenderers shall have to necessarily quote the rate for supply, services &/or work
asked for in the tender and in E price bid only.
8. Tenderers shall have his registered office with telephone. Tenderer having experience
in similar works and good track record shall be given preference while considering
the tenders. Tenderers shall furnish the date on which the firm was established, the
names of all the partners constituting the firm with their residential addresses and
experience in similar works. Tenderers having telephones at the residence of the
proprietor shall state the same in the tender.
9. Municipal Commissioner decision will be final and abiding to all for accepting or
rejecting and any interpretation of terms of the tender.
10 In case the tenderers will try to do any type of corrupt procedure like writing letters /
e‐mails /phone calls / Personal visits to the officers of the Municipal Corporation or
any one after prize bid open will be liable for punishment procedure
11. As per the Bombay Stamp Rules Act 1958, Appendix 1, Article 5, the successful
bidder shall enter in to an Agreement with the Corporation on Rs. 300 Stamp Paper /
Value as per new norms.
12. Bidders shall submit necessary registration certificate like GST number registration
copy & any other if required for execution of such work as per government rules
along with tender document.
13. If required tenderer may visit at our Municipal Central Workshop & / or Respective
department for general idea of working and requirements of Heavy Duty Truck
Mounted Dewatering Pump with prior appointment.
Municipal Commissioner, Ahmedabad reserves the right to accept or reject any or all
tenders without assigning any reason thereof. This Tender notice shall form a part of
contract document. The tenderers are advised to read carefully the “Instructions to
suppliers” and “Qualification Criteria” contained in the tender documents.
Contractor’s Sign Joint Director (Mechanical)
With seal Central Workshop
Ahmedabad Municipal Corporation
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 -6-
INSTRUCTIONS TO SUPPLIERS
1.0 Ahmedabad municipal corporation invites tender for Comprehensive Operation and
Maintenance contract for 5 (Five) Years of Heavy Duty Truck Mounted Dewatering
Pump ‐ 03 Nos. As per AMC tender specifications, scope of work & terms ‐
2.0 The requirement of Comprehensive Operation and Maintenance contract for 5 (Five)
Years of Heavy Duty Truck Mounted Dewatering Pump ‐ 03 Nos. As per AMC
tender specifications, scope of work & terms ‐ conditions and their detailed technical
specifications, scope of work etc are set out in Appendix 1. Interested and qualified
parties, based on qualification criteria set out in Appendix 2, (Online)are requested to
submit information about bidder and a financial Quotation / price bid in a manner
prescribed in Appendix 3 & 4 (Online). Tenderer has to submit various other details
as per format / details asked for in the Annexure 1 to
3.0 Each tenderer shall submit only one (1) Bid for each of the item, in response to this
Tender Document (TD). Any tenderer who submits more than one Bid for the item
will be disqualified.
4.0 At any time prior 72 hours to the last date and time of submission of Bids AMC may,
for any reason, whether at its own initiative or in response to clarifications requested
by any supplier, modify the TD by the issuance of Addenda. All interested tenderer
shall have to check the AMC / n procure website. The Bidder shall not transfer the TD
to another interested party. Any reply/changes (if required), will also be declared on
above website only.
6.0 Perpetrations of tender document: Tenderer shall carefully examine the tender
documents and fully inform themselves as to all the conditions and matters, which
may in any way effect the work or the cost Should a Tenderer find discrepancies,
error or omission from the specifications or other documents or should he be in doubt
as to their meaning, he should address query to the concerned authority. Any
resulting interpretation of the tender documents (if required) will be issued to all
Tenderers as an addenda corrigendum. Verbal clarification and/or information given
by the Tenderer shall not be binding on the Corporation.
7.0 Modification of Documents : Modification of specifications and extension of the
closing date of the tender, will be published on website only. These shall be signed
by tenderer and shall form a part of tender. If required will be made by an addendum
8.0 Addenda: Addenda form part of the contract documents and full consideration shall
be given to all addenda in the preparation, evaluation etc. of tender. Tenderer shall
verify the number of addenda issued, if, any and acknowledge the receipt of all
Addenda in the Tender. Failure to do so may cause the Tender to be rejected.
9.0 The Bid shall remain valid for a period not less than 120 days from the date of
opening of tender i.e. technical bid (bid validity period). AMC reserves the right to
reject any Bid, which does not meet this requirement. In exceptional circumstances,
prior to expiry of the original Application Validity Period, AMC may request
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 -7-
Applicants to extend the Application Validity Period for a specified additional
period. Applicants not extending the Application Validity Period when so requested
would automatically be disqualified.
10.0 Earnest Money Deposit (EMD)
11.0 Each Bid shall be accompanied by EMD as Under :
Sr. Name Of Tender Tender No. EMD Rs.
1 Comprehensive Operation and Maintenance contract for 21 / 6,75,000/‐
5 (Five) Years of Existing Heavy Duty Truck Mounted 2026‐27
Dewatering Pump of AMC‐ 03 Nos. As per AMC tender
specifications, scope of work & terms ‐ conditions.
12.0 The EMD shall be in the form of a crossed demand draft / Pay Order / Bank
Guarantee in favour of The Municipal Commissioner, Ahmedabad on any Bank as
per AMC circular, payable at Ahmedabad.
13.0 The EMD shall be forfeited in the following cases:
(a) If the Tenderer withdraws itʹs Bid during the interval between the Bid Due Date and
expiration of the Bid Validity Period.
(b) If the successful Tenderer fails to provide the Performance Security deposit within
the stipulated time or any extension thereof provided by AMC;
14.0 Performance Security Deposit :
15.0 The successful tenderer would be required to submit O & M contract Performance
Security deposit which shall be submitted (as mentioned in performance security
conditions in detail) before start of actual O & M work, which will be returned back
on successful completion of O & M Contract period.
16.0 Irrevocable Bank Guarantee issued by any Bank as mentioned in AMC circular
located in Ahmedabad, India (as per AMC rules) shall also be acceptable.
17.0 Formats and Signing of Bid
17.1 The Tenderer would provide all the information as per this TD. AMC would evaluate
only those Bids that are received in the required format and are complete in all
respects. Each Bid shall comprise the following:
(a) Details of the Tenderer in the format set out in Appendix 3‐ Online
(b) Qualification Criteria / Technical bid in the format set out in Appendix 2‐ Online
(c) Financial Quotation/ price bid for Comprehensive Operation and Maintenance
contract for 5 (Five) Years of Existing Heavy Duty Truck Mounted Dewatering Pump
of AMC‐ 03 Nos. As per AMC tender specifications, scope of work & terms ‐
conditions the format set out in Appendix 4 in online format only.
(d) Tenderer has to submit various other details and formats duly self attested and
signed as per Annexure 1 to
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 -8-
(f) The Bidder shall duly sign all the sheets of the Tender Document submitted in
support of their online tender.
(h) All bidders are requested to upload technical bid documents, however if they found
any difficulty in uploading, they can submit the same in physical with tender
technical bid (EMD, Tender fee etc) supporting documents.
18.0 The bidder shall seal the Tender fee, EMD and relevant Tender Document submitted
in support of their online tender in envelopes, which shall be clearly marked as
Comprehensive Operation and Maintenance contract for 5 (Five) Years of Existing
Heavy Duty Truck Mounted Dewatering Pump of AMC‐ 03 Nos. As per AMC tender
specifications, scope of work & terms ‐ conditions along with tender number, due
date of tender etc.
19.0 The Tender Document submitted in support of their online tender shall be initialled
by an authorized signatory of the Bidder or an Individual, as applicable.
20.0 Sealing and Marking of Bid for submission of Physical Tender supporting
21.0 The envelope for EMD ‐Tender fee and relevant supporting documents must be
superscribed with the following information:
(a) Name and Address of Tenderer;
Tender due date and time;
22.0 If the envelope is not sealed and marked as instructed above, AMC assumes no
responsibility for the misplacement or premature opening of the contents of the Bid
submitted and such Bid, may, at the sole discretion of AMC, be rejected.
Tender shall be submitted through E ‐ tendering only. (On line price Bid is
23.0 AMC reserves the right not to respond to any/all queries raised or clarifications
sought if, in their opinion and at their sole discretion, they consider that it would be
inappropriate to do so or do not find any merit in it. The response to the queries shall
be uploaded only (if found appropriate and required) on www.ahmedabadcity.gov.in
or https://amc.nprocure.com or www.tender.nprocure.com website.
24.0 Bid Due Date : As mentioned in tender.
25.0 Bids should be submitted online before 18.00 hours IST on 24th August 2026, in the
manner and form as detailed in this PD. Bid submitted by either Hard copy (not as
per format in TD), facsimile transmission or telex or email or in person will not be
accepted and such tender/s will be rejected.
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 -9-
26.0 AMC may, in exceptional circumstances, and at its sole discretion, extend the above
Bid Due Date by issuing an Addendum / corrigendum.
27.0 Opening of Bids and Clarifications
All information must be typed or hand written legibly in English language. All pages
of the pre‐qualification document must be initialled by the applicant. All corrections,
erasures or overwriting, therein, must be initialled by Applicant.
28.0 Technical bid will be opened on 27th August 2026 11.00 hrs onwards. AMC would
open the Bids possibly on Bid Opening Date as mentioned above in the ‘General
Description of Work’ for the purpose of evaluation, if there is any change, same will
be intimated to tenderer.
29.0 AMC reserves the right to reject any or all Bids not submitted on time and which
does not contain the information/documents as set out in tender .
30.0 To facilitate evaluation of Bids, AMC may, at its sole discretion, seek clarifications in
writing from any Tenderer regarding its Bid, and can take information from past
purchasers / customers etc as may be required.
31.0 Evaluation
The details given by the applicants in the pre qualification documents will be
evaluated as per qualifying criteria, given in tender. Ahmedabad Municipal
Corporation reserves the right to restrict the list of pre‐qualified applicant to any
number deemed suitable by it. Ahmedabad Municipal Corporation’s decision for
interpretation of any term of pre qualification criteria, pre‐ qualifying the applicants
etc. shall be final and binding to all.
32.0 As part of the evaluation, the Bids shall be checked for responsiveness with the
requirements of the TD and only those Bids, which are found to be responsive, would
be further evaluated in accordance with the criteria, set out in this TD.
33.0 The Bid would be considered to be responsive if it meets the following conditions:
(a) It is received /deemed to be received by the Bid Due Date including any extension
(b) It is signed, sealed and marked as stipulated in tender.
(c) It contains all the information and documents as requested in the TD.
(d) It contains information in formats specified in this TD.
(e) It mentions the validity period as set out in tender.
(f) It provides information in reasonable detail. (“Reasonable Detail” means that, but for
minor deviations, the information can be reviewed and evaluated by AMC without
communication with the Supplier). AMC reserves the right to determine whether the
information has been provided in reasonable detail.
(g) There are no inconsistencies between the Bid and the supporting documents. A Bid
that is substantially responsive is one that conforms to the preceding requirements
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 10 -
without material deviation or reservation. A material deviation or reservation is one
(i.) which affects in any substantial way, the scope, quality, or performance of the
project, or (ii.) which would affect unfairly the competitive position of other
Tenderer/s presenting substantially responsive Bids.
34.0 AMC reserves the right to reject any Bid, if:
(a) If the tender is incomplete; or
(b) At any time, a material misrepresentation is made or discovered; or
(c) The Supplier does not respond promptly and diligently to requests for supplemental
information required for the evaluation of the Bid.
35.0 In case the Bid is found to be responsive, the Bid would be evaluated in accordance
with the Qualification Criteria as set out in Appendix
36.0 In case the Bid is found to be inadequate, AMC may request the Tenderer for
supplementary informations to the Bid submitted. As part of the evaluation of the
Bid, AMC may also request the Supplier to submit clarifications.
37.0 The Financial Quotations/ Bid of only those Tenderer/s, who meet the Qualification
Criteria, would be opened.
38.0 The Tenderer offering the lowest quotation for the Comprehensive Operation and
Maintenance contract for 5 (Five) Years of Existing Heavy Duty Truck Mounted
Dewatering Pump of AMC‐ 03 Nos. As per AMC tender specifications, scope of work
& terms ‐ conditions as per formula given in tender would be declared as the
Preferred Tenderer for the same.
39.0 Tenderer has to submit the technical presentation in support of their technical bid (if
asked by AMC) with all the credentials and salient features of their Vehicles &
proposal to enable the more technical evaluation of the available proposal, if
required AMC can ask the tenderer to show the live working of the Vehicles and
based on the performance, AMC can take the decision for technical evaluation. This
will be binding to all the bidder.
40.0 Even though agency is qualifying all the above criteria but found to be poor in
performance, in the opinion of class‐I officer of AMC and above cadre, his price bid
will not be opened. It is the discretion of Municipal Commissioner or the Tender
Scrutiny Committee to qualify / disqualify the agency or to open / not to open the
price bid of agency.
41.0 AMC may either choose to accept the Quotation of the Preferred Tenderer or invite
him for negotiations.
42.0 In case there are two or more Tenderer quoting the same price, AMC may in such
case call all such Tenderer for negotiations and select the Preferred Tenderer on the
outcome of the negotiations. The selection in such cases shall be at the sole discretion
43.0 In the event of acceptance of the Preferred Tenderer with or without negotiations,
AMC shall declare the Preferred Tenderer as the Successful Tenderer. AMC will
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 11 -
notify the Successful Tenderer through a Letter of Award (LoA) / order that its Bid
has been accepted.
44.0 This work will be considered as rate contract for Five Year for O & M of Existing
Truck Mounted Road Sweeper Machines of AMC as per tender conditions; as per TD.
45.0 Notwithstanding anything contained in this TD, Municipal Commissioner, AMC
reserves the right to accept or reject any quotation, or to annul the bidding process or
reject all quotations, at any time without any liability or any obligation for such
rejection or annulment, without assigning any reasons thereof.
46.0 Notwithstanding above, the MC‐ AMC, at his discretion, may also split the contract,
if require for timely execution of the work among two of more qualified bidders. MC‐
AMC ʹs decision in this regard shall be final. MC‐ AMC also reserves right to award
the Contract to any of the eligible and qualified suitable Bidder. Splitting of work will
be carried out based manufacturing capacity, past work experience of the bidder,
time frame for execution of work etc and this shall be binding to all bidders. Parallel
contract, if required, can also be awarded on above basis and will be binding to all.
47.0 However, if the AMC decide to put an end to the business relations on breach of any
conditions of the contract no such notice shall be necessary and on event of AMC
decided to put an end to the business relations on breach of any conditions of the
contract no such notice shall be necessary and on event of AMC deciding to terminate
the business, and the R.C. shall stand terminated with immediate effect.
The R.C. can also be terminated by the MC ‐ AMC in the following circumstances:
1) If the firm is debarred or disqualified or ceases to exist or convicted of any
2) If the quality of the item to be supplied is found not up to the ISI standard /AMC
Specifications (as applicable) and found to be not of standard quality.
3) If supply position of the firm is not satisfactory.
48.0 Whenever under this contract any sum of money is recoverable from the RC Holder
and payable to the MC ‐ AMC, Ahmedabad, or an officer empowered by him shall be
entitled to recover such sum by appropriating in part of whole the Security Deposit
paid by the Contractor, if a security being insufficient or if no security has been taken
from contractor, then the balance of the total sum recoverable as the case may be
deducted from the sum due to the contractor under this or any other contract.
49.0 If any dispute arises about the contract or any terms of contract, Municipal
Commissioner, AMC shall be the sole arbitration and his decision would be final and
binding to all the parties.
50.0 Vehicles shall be inspected / verified by Joint Director (Mechanical) & / or authorized
representative/s of AMC with the specification of AMC (if required) & on approval
same shall be put in working.
51.0 The price escalation or variation clause will not be accepted. Tenderer has to quote
the total price, net including of all taxes & duties etc. and for evaluation and
finalization purpose, the total price will be taken in to consideration. Transportation,
Packing, Forwarding, Insurance charges are included in the indicated price. However
any change in the GST, Govt. statutory levies and taxes etc. will be considered for
payment at actual (for supply and O & M work both) for which contractor will have
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 12 -
to submit necessary documentary proofs as required by department. No other change
will be accepted. For O & M work fuel rate change will be considered as per the
condition and formula given in the tender O & M work part.
52.0 The technical specification and scope of work for Comprehensive Operation and
Maintenance contract for 5 (Five) Years of Heavy Duty Truck Mounted Dewatering
Pump ‐ 03 Nos. As per AMC tender specifications, scope of work & terms ‐
conditions is given in Appendix 1, however bidder are advice to personally visit the
AMC, Central Workshop & zonal Garden Dept. for better understanding of
requirement and working of Vehicles.
53.0 EXTENSION FOR DELAY.
If the supply is delayed by:
a) Force Majeure.
b) Abnormally bad weather, or
c) Serious loss or damage by fire
d) Civil commotion or strike or lock out of their principal workshop.
Any other cause which is beyond the contractorʹs control then upon the happening of
any such event causing delay, the contractor shall immediately inform in writing to
the Dy. M.C. (Central Workshop) but at the same time his best endeavours to make
good the delay. The Dy. M.C. (Central Workshop) in such event can take the final
decision regarding the late delivery penalty for such cause.
54.0 The contractor must follow all the rules and regulations pertaining to the work,
labour etc. Contractor shall have to produce Employee labor license and P. F. license
and must follow rules and regulations as amended in law. The expense of having the
license shall be borne by contractor. Contractor has to maintain PF, ESIC, Professional
tax account of their staff. AMC shall not be responsible for the same.
55.0 PAYMENTS DUE FROM CONTRACTOR.
The Municipal Commissioner shall be entitled to recover costs, damages, or expenses
for which under the contract, the contractor is liable to the Ahmedabad Municipal
Corporation from any money due or becoming due to the contractor under the
contract or Municipal Commissioner will have the liberty to recover the amount from
the contractor.
56.0 Payment Terms: ‐
As mentioned in Appendix‐1
57.0 PQ criteria are mentioned in Appendix‐2.
58.0 The MC ‐ AMC shall, in addition to his powers under other clauses to terminate the
contract, have powers to terminate his liability there under of the time by giving one
month’s (or such shorter period as may be mutually agreed) notice in writing to R.C.
holder of his desire to do so and upon expiry of the notice, the contract shall be
terminated without prejudice to the right accrued to the date of the termination.
59.0 Successful bidder has to use all virgin material for fabrication/ manufacturing of the
ordered item/ material and has to submit all necessary proofs like Invoice copies of
material purchased, test reports etc as per AMC requirements.
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 13 -
60.0 Contractor shall make payment to their employee/ workers through bank system
61.0 AMC based on prevailing practice of work in the city, can increase / decrease the
work quantum even after award of work & from the running contract at any time. No
compensation for reduction in work will be given in any way. This shall be binding
to the contractor/s.
62.0 No Compensation for Alteration in or Restriction of Work If at any time after the
commencement of the work, the Ahmedabad Municipal Corporation shall for any
reason whatsoever not require the whole or part of work/supply thereof as specified
in the tender to be carried out, the AMC shall give notice in writing of the fact to the
contractor, who shall have no claim to any payment or compensation whatsoever on
account of any profit or advantage which he might have derived from the execution
of the work/supply in full, but which he did not derive in consequence of the full
amount of the work/supply not having been by reason of any alterations having been
made in the original specifications, drawings, designs and instruction which shall not
involve any curtailment of the works as originally contemplated.
63.0 The Municipal Commissioner, Ahmedabad Municipal Corporation reserves the right
to reject all or any of the tender including the lowest tender or part of the tender
which in the judgment of the Municipal Commissioner, Ahmedabad Municipal
Corporation does not appear to be in the best interest of Ahmedabad Municipal
Corporation and the contractor shall have no cause of action or claim against the
Ahmedabad Municipal Corporation, its officers, employees, successors, or assignees
for rejection of his tender
64.0 The activity is under essential service, contractor is not allowed to stop this work at
any point of time. If the contractor fails to start the work on time after issue of work
order, then EMD of the contractor shall be forfeited and if the agency is found to be
poor in performance for carrying out awarded work or Notwithstanding, if
contractor stop / leave the work by his own discretion then performance Security
Deposit of the contractor shall be forfeited and additional expenditure for execution
of remaining work shall be recovered through, if be needed, legal proceeding and
Agency shall be debarred / blacklisted subject to approval of competent authority.
65.0 Tenderer has to submit all the relevant information likes;
Availability of local service point.
Detailed client list to which such type of Vehicles have been under contract.
Details of Technical experience of tenderer (O & M work)
Performance certificates as per tender requirements.
66.0 Special Conditions
a) The bidder has to make the invoices in the name of AMC.
b) On failure of L1 to show the technical presentation &/or live‐ actual working
performance (if asked by AMC) of the Vehicles for technical approval of bid
his tender will be rejected. AMC can ask the Lowest &/or other qualified
bidder/s to submit the Sample unit for checking / verifying the same with
tender specifications and actual requirement‐ working, before finalizing the
bid. On failure of L1 for approval of sample / execution of order the L2 shall
be invited for negotiation and further formalities (as above) if required.
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 14 -
c) The tenderer shall be fully responsible for taking delivery of vehicle from the
central workshop dept. and in no way any kind of relaxation will be given if
there is any problem with the vehicle received. The tenderer should see that
the working & maintenance of equipment should be such that which comply
all prevailing RTO/any other Govt authority norms (if any) in Ahmedabad
city for such type of Vehicles
d) The tenderer must quote for complete job (O & M). The tenderer that does
not include the complete job as specified in schedule of tender (specification,
scope of work etc.) will be rejected. The successful bidder shall be responsible
for taking timely delivery of vehicle from central workshop. The successful
bidder shall be responsible for any fault, shortfall in the Vehicles
proposed in the tender etc or any other requirement which is mandatory
for the completion of successful equipment working.
e) It will be the responsibility of the tenderer to collect the Vehicles from the
central workshop. Any charges applicable for the same shall be included in
the tender offer.
f) Tenderer has to maintain the Vehicles as per the requirements of AMC;
keeping in mind the RTO / other Govt. agencies norms applicable in City of
Ahmedabad for such type of Vehicles. Regular RTO NOC shall be taken by
tender as per prevailing govt. norms. Failure at any part will be contractorʹs
responsibility and will have to bear the cost.
g) The successful tenderer will be fully responsible for the safety and security of
the Vehicles when in their possession during the entire O & M contract
h) The contractor shall ensure that the supervisors and cleaners are all mentally
stable, and are able to communicate properly. They should not pose any
hazard to the general public. Contractor must have to pay the salary through
banks to the workers, drivers and other workforce regularly and contractor
shall be fully responsible for that.
i) This is subject to the jurisdiction of the competent court of Ahmedabad only.
In case of any claim, dispute of difference arising in respect of a contract, the
cause action thereof shall be deemed to have arisen in Ahmedabad and all
legal proceedings in respect or any such claim, dispute or difference shall be
instituted in a competent court in jurisdiction of Ahmedabad city only.
Contractor ’s Sign Joint Director (Mechanical)
With seal Central Workshop.
Ahmedabad Municipal Corporation
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 15 -
Ahmedabad Municipal Corporation
Central Workshop
Ahmedabad Municipal Corporation
Central Workshop
For O & M work Part
SCOPE OF WORK for O & M WORK
The scope of work is Comprehensive, Operation & Maintenance Contract of Heavy duty De
watering pump unit 03 Nos. with vehicle chassis for the period of 5 years as per Scope of work
and conditions mentioned in the tender document. The contractor shall have to commence
the work within 7 days from the date of order and shall have to scale it up to the expected
level within 15 days from the date of handover of vehicles to them by AMC. The O & M
Contract will be for a period of 5 (Five) years from the date of commencement of work subject
to annual renewal (subject to GOI norms for vehicle scrap life & certificate of fitness renewal
by RTO dept.) as mentioned in the document. The same can be extended for a further period
of 2 (Two Years) Years by the corporation and on the terms and conditions mutually agreed
upon in writing.
Details of Heavy Duty De Watering pump unit ‐ Nos. 03 are as under;
Sr No Vehicle No. Model
Contractor has to operate the pump units mainly during monsoon season/ flood conditions/
heavy rain etc whenever required for dewatering of the water logged in various low lying /
other area as suggested by AMC zonal/ Engineering deptt/other related deptt. of AMC from
different sites timely and efficiently on 24 x 7 basis throughout the period as per the AMC
requirement during the contract period. Further as and when required during the contract
period for dewatering of drainage water from the drainage breakdown site they have to
perform as per the requirement of site and instruction of AMC officers. Over and above
contractor has to perform the water spraying work and other related activities during
emergency if asked by AMC officer over and above Central Workshop. Looking to the
present working of AMC and duration of monsoon season etc it is required to operate pump
unit for appx 60 days in a year. However actual working and deployment etc will be based on
the actual work requirements. During monsoon season &/or during any emergency situation
when AMC needs to keep such pump/s on duty without any actual site duty/ work (as
standby) to meet any contingency/ emergency situation, successful tenderer has to provide
pumps as per the AMC requirement as and when asked by respective dept / Officer incharge
with all labor/ attendant etc.. Further in such condition AMC will pay only 50% for such
standby shifts / timings based on the approved rate of the tender to compensate for the idle
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 16 -
expenses with manpower. These pump unit will be used at Monsoon / Clean / Waste water
management as and when required by AMC.
Tenderer/s must have to visit the site with authorized representative of AMC and has to
check the same and before starting the O & M contract work they have to repair all the units
and put it in to good working and aesthetic condition. It shall be repaired thoroughly so that
it also looks and works like new one. All necessary repair maintenance including Turbo
charger unit, Engine unit, body work, painting, RTO passing etc shall be in tendererʹs scope
of work. No extra payment will be given for this work. The operation of vehicles shall be
confirming to Operation manual of the vehicle manufacturer. The repairs & maintenance
shall be carried out, as per the practice prescribed by manufacturer/instructed by Central
Contractor has to dispose of the water by use of vehicle within AMC area as instructed by
concern officer of AMC / related authority from various locations &/or water logged site of
AMC. Contractor has to dispose of the logged water by using vehicle in coordination with
Zonal Engineering department of AMC or as instructed by AMC time to time on daily
basis( by concern officer in charge /Other related deptt. of AMC). This work shall be
performed timely and efficiently on 24 x 7 basis through out the year as per the AMC
requirement during the contract period. Further as and when required, vehicle shall be
shifted from one to another location for water disposal &/or other operation as per
requirement of AMC. They have to use this vehicle as per the instruction of the AMC
department over and above in coordination ‐ confirmation with Central Workshop.
It is expected from bidder to shoulder the responsibility of operation and maintenance of
equipments against fulfilment of contractual obligation for the period of 5 (Five) years.
Bidder will have to appoint necessary staff to operate and maintain the equipments during
contract period. (Minimum 1 trained/skilled Operator Cum driver & 4 Labours per Vehicle).
Further if deployed manpower unavailable on vehicle for any reasons bidder should provide
immediately alternative arrangement for operation of vehicle.
Providing 03 Nos. Heavy Duty Dewatering pump vehicles as per the conditions &
requirement given in the tender document and daily operation and maintenance of
these Heavy Duty Dewatering pump vehicles for complete duration of the contract
Procure, provide, and maintain necessary tools, equipment machinery, manpower,
fuel and other required items for Heavy Duty Dewatering pump vehicles.
Site work through these vehicles shall be done on designated sites as instructed by
The monitoring of the complete system will be done by AMC. The GPS system shall
be integrated with central command centre as / if instructed by AMC.
The work shall be done at least 8 hours a day by each vehicle. However the actual
timing may be reduced or extended by AMC as per the requirement of site conditions
and need of work.
Route & schedule will be given by zonal Engineering department/ other related dept.
Contractor should procure / maintain / keep in stock, necessary tools, equipment,
machinery, manpower, fuel, spares etc for the Heavy Duty Dewatering pump in use.
NO extra payment for these shall be made.
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 17 -
The scope of work shall consist of operation and maintenance of Heavy Duty
Dewatering pump vehicles owned by Ahmedabad Municipal Corporation including
supply of all spares and include the following;
1. Services of an operator cum driver (one each on vehicle) and 4 other manpower
required for O&M including technical support of service engineer / technical person
from successful bidder’s office as per requirements and to carry out operation of
vehicle and related activities in AMC as per the direction of Ahmedabad Municipal
Corporation on a normally 8 Hours shift which may be in day or as per the AMC’s
2. The quoted rate are based on a 8 hours / 12 Hours and 16 Hours operation of the
vehicle, which includes
a. The time taken for pumping the water on the site,
b. Moving the vehicle from one place to another,
c. Moving the vehicle from parking place to other areas and back (not included),
d. Lunch break of operation (not included) ‐ time will be decided & Communicated
by Zonal Engneering officer/ other incharge of work as per work and route
e. Actual activity on site.
Successful bidder shall make the arrangement of operator accordingly.
3. The bidder shall have to submit schedule of maintenance and carry out the general
daily preventative maintenance as recommended by OEM in addition to minor break
downs as per the schedule of maintenance. Major/ Break down maintenance, if
required/incises will be permitted on written instruction to Central Workshop / AMC.
Daily preventative maintenance shall also include oiling, greasing, etc of all movable
4. Routine maintenance and servicing of Vehicle including replacement of Hydraulic
oil, engine oil, other oil and coolant liquid etc. Same shall in the scope of Contractor
and remains to be kept in stock according to the requirement and maintenance
schedule as recommended by OEM.
5. Vehicle shall be cleaned daily and service once in a month.
6. Routine consumable spares inventory shall be provided by bidder and maintain
minimum inventory to avoid any hassle in operation of vehicle. The list of routine
consumable spares shall be submitted along with this offer.
7. All running/major repairs and break down repairs of entire Vehicle shall be in scope
of work including all necessary spares/accessories etc required for smooth and
uninterrupted operation of vehicle.
8. The equipments (Vehicle) shall be parked at any locations suggested by Zonal
Engineering dept/officer in charge on day‐to‐day basis and shall be operated under
the supervision of Engineering dept/ concern dept. user department. Parking facility
shall be provided by the AMC Zonal Engineering dept/ concern dept. The vehicle
shall be parked during the non‐working hours at the place directed by Zonal
Engineering Zonal engineer/Officer‐in‐charge. Safety & Security of vehicle during
entire contract period including non‐operative hours shall be ensured by contractor
at their own cost.
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 18 -
9. All safety equipments required on vehicle like Fire extinguishers, emergency
rechargeable torch, anchor etc shall be provided before starting of contract and kept
on vehicle during operation and maintenance period.
10. Day to day report/log sheet / computer record of operation shall be filled in by the
bidder staff and same shall be submitted to Zonal Engineer dept / user dept
operation in charge on next day. The design of report shall be given by AMC
operation in charge and same shall be followed by bidder.
11. Bidder shall depute one person between all vehicles as supervision to synchronize
day to day routine work management, repairing of vehicle and follow up the
instructions given by user department. Further, bidder must visit as per as per
requirements of AMC to synchronies the O & M activity at his own cost.
12. The bidder shall also maintain register/ record for consumable, spare maintenance in
appropriate formats.
13. The bidder shall make every effort for complete safety of the AMC’s equipments
while performing the operation and maintenance at site.
14. Corporation will not be responsible for any accident/ hazard during operation and
maintenance of the equipments. All responsibility shall rest with the contractor.
Contractor must take all precautionary/ safety measures to avoid accident/ hazards
15. During maintenance of vehicle, for repairing of any parts/spares, equipments
installed in vehicle, necessary machinery such as extra man power, etc shall be
arranged by the successful bidder at his own cost and included in the scope of work.
16. During contract period, if vehicle fails to work because of vehicle is under
maintenance or lack of man power, the cost being paid towards operation and
maintenance will not be paid (in short” No work done‐ no payment” shall be given).
In addition to that necessary penalty as mentioned in tender towards minor & major
repair work time period for additional time taken for repairing in addition to the no
work‐no payment will be recovered as penalty.
17. All required statutory & Govt. formalities (if any) for carrying out such type of work
shall be complied by contractor & it is their responsibility.
The operation of vehicles shall be confirming to Operation manual of the vehicle
manufacturer. The repairs & maintenance shall be carried out, as per the practice prescribed
by manufacturer/instructed by Central Workshop, AMC.
The Contactor shall ensure that his personnel should report worksite every day at designated
time and continue working throughout the day. The contractor shall make provision for
presence of requisite manpower to perform his duty during national holidays and festivals
also so that the work is not affected at any site in the Ahmedabad city. The corporation for
working on holidays, national holidays and festivals will make no separate payments. The
Contractor should ensure presence of his workforce at the specified time and location. The
contractor shall not be paid for any overtime charges for working at late hours so as to
complete the scope of work and maintain the cleanliness at various locations.
The operation of vehicles shall be confirming to Operation manual of the vehicle
manufacturer. The repairs & maintenance shall be carried out, as per the practice prescribed
by manufacturer/instructed by Central Workshop.
The Contactor shall ensure that his personnel report work site every day at designated time
and continue working throughout the day. The contractor shall make provision for presence
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 19 -
of requisite manpower during national holidays and festivals so that the work is not affected
at any site in the Ahmedabad city. The corporation for working on holidays, national
holidays, and festivals will make no separate payments. The Contractor should ensure
presence of his workforce at the specified time. The contractor shall not be paid for any
overtime charges for working at late hours so as to complete the scope of work and maintain
the cleanliness at various locations.
The corporation has the right to charge the contractor for any damage caused to corporation
assets and the same shall be recovered from the contractor with immediate effect. Contractor
has to keep enough spare/stand by units for preventive and breakdown maintenance of all
the equipments as per the unit/equipment manufacturer’s guideline and this will be verified
by the Engineers of Central Workshop, at any time for smooth and uninterrupted working of
Contractor has to submit daily/weekly/monthly report of their work to the respective AMC
department as required & asked by AMC.
AMC reserves the rights to terminate the Contract for Deficiency of Service.
Contractor has to carry out washing of all the vehicles and equipments at least once a week.
(A) Comprehensive Operation:
i) As the operation of the vehicle on everyday basis is required, it would be the
responsibility of the successful bidder to provide 1 skilled operator having valid
driving license & minimum 4 labours known to all operational activities of the
vehicle on each vehicle per shift (8) hours or as may be required on all the 365 days of
the calendar year. There would not be any services to be rendered on national
holidays i.e. 26th January, 15th August & 2nd October. Further each vehicle’s
operation shall be stalled for 2 days in a month for routine maintenance or as per the
work requirements and instructions by Central Workshop dept., AMC.
ii) Planning of rendering the services shall be based on 8 hours operational shift.
However based on Engineering / Concern department requirement contactor has to
provide vehicle for actual work requirement. Daily route plan will be given by Zonal
engineer of respective Zone / Officer incharge of work.
iii) During situations such as visits of VIPs successful bidder will be require to render
operational service even on National holidays. No extra payment (Other than one
which is approved) would be payable to the contractor form rendering operational
services on these events which is required to be noted by the successful bidder.
iv) Successful bidder will have to ensure that each and every vehicle must be covered
with their comprehensive insurance per year and that the next year’s insurance shall
be done before the expiry of the earlier year’s insurance. It may be noted that the
successful bidder will be paid as per the tendered offer sanctioned only. Necessary
documents shall be submitted by contractor.
v) To maintain the disciplined and efficient services, it would be necessary to appoint at
least one supervisor for this tender work better coordination in addition to operators
and provide them uniforms, safety gears & mobile facilities.
vi) As far as parking arrangement of the vehicles are concerned, the parking place shall
be made available by AMC, in respective zone by Zonal engineer of Zone / officer
vii) If due to less work &/or for any reason, AMC do not wish to run the vehicle/s for
8/12/16 hrs. shift then contractor will be paid on prorata basis for actual working
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 20 -
hours on that day. AMC decision & rate calculation in such event/s will be final &
binding to all.
viii) Shift timing will be calculated (started) from start of vehicle from parking area & end
will be when vehicle come back again to parking area which is provided / identified
by Zonal Asst. Dir(Engineering)/ officer incharge. However; contractor has to ensure
fast & efficient movement of vehicle/s in all the case. If AMC finds any inefficiency;
can take necessary actions including payment deduction for such time & will be
binding to contractor. During normal travel Contractor has to ensure travelling of
vehicle on left side of road.
xi) A successful bidder shall maintain log sheet / Computer Record to enter the
information about the day to day works allotted to them by the representative of
their concerned Zonal engineer of the zone / Officer incharge of work.
xii) For any default of service performance a penalty of amount equivalent or not more
than to the O & M cost of the specific vehicle and the length of the default area (at the
rate approved by AMC) shall be deducted /charged from the running bills. The
details of the events of default and the exact rate of penalties shall be as specified in
xiii) As a disciplinary measure, following penalties would be liveable so that the defaults
are not recurred as per the penalty shown in the penalty table.
Performance Guarantee For O & M contract work:
For Operation and maintenance contract work, Contractor has to submit performance
security deposit which shall be 5% of the one year O & M contract work amount based on
daily 8 hrs working shift approved rate as a contract security. This guarantee (BG) shall be
renewed timely (every yearly) till expiry of contract. The contractor shall furnish performance
guarantee in the form of Bank Guarantee ( as per AMC rules) or by Demand draft/ pay order
within 15 days from the date of order from any Nationalized Bank / schedule Bank / Bank as
per AMC Circular and made payable to the ʺMunicipal Commissioner, Ahmedabad
Municipal Corporationʺ. Payable at Ahmedabad which shall be released after the successful
completion of the contract period, subject to no due certificate from the Corporation, If any
amount is due from the contractor even after adjusting from monthly bills, the same will be
recovered from this amount. If PG is delayed more than 15 days, interest will be charged for
delayed period as per AMC rules.
‐ Forfeiture of Security money: ‐ Security amount in full or part may be forfeited in the
following cases:‐
(i) When any terms and conditions of the contract is breached
(ii) When tenderer fails to comply the tender terms, scope of work and all necessary
work instructions given time to time by AMC; satisfactorily.
The decision of the Municipal Commissioner, AMC in this regard shall be final.
Notwithstanding the provisions of tender, the contractor shall not be liable for forfeiture of its
performance security, liquidated damages or termination for default, if and to the extent that,
its delay in performance or other failure to perform its obligations under the Contract is the
result of an event of Force Majeure.
For purposes of this Clause, ʺForce Majeureʺ means an event beyond the control of the
contractor and not involving the contractorʹs fault or negligence and not foreseeable. Such
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 21 -
events may include, but are not limited to, acts of the Purchaser either in its sovereign or
contractual capacity, wars or revolutions, fires, floods, epidemics, quarantine restrictions and
freight embargoes.
If a Force Majeure situation arises, the contractor shall promptly notify the Purchaser in
writing of such conditions and the cause thereof. Unless otherwise directed by the Purchaser
in writing, the contractor shall continue to perform its obligations under the Contract as far as
is reasonably practical, and shall seek all reasonable alternative means for performance not
prevented by the Force Majeure event.
Taxes and duties
It shall be included in the indicated price as per price format. Tenderer has to quote the total
price, net including of all taxes & duties, GST (as applicable) as per online price format etc.
and for evaluation and finalisation purpose, the total price will be taken in to consideration.
However for calculating total cost ; actual GST will be considered if need be AMC will be
cross verify However any change in the GST tax, govt. statutory levies will be considered at
actual for payment purpose for which contractor will have to submit necessary documentary
proofs as required by department.
ELECTRIC SUPPLY
The contractor shall make payments of actual electric consumption bills to the electric supply
company, as and when the same are demanded (if separate plot for parking & / or repair ‐
maintenance given to them) In case of non‐payment of electric bill & supply company issues
notice for disconnection, the bill amount will be recovered from the regular monthly bill.
The electrical maintenance from time to time shall be carried out through license
electrician/wiremen only and all precautions shall be taken to avoid any accidents/mishap.
The contractor shall follow all the mandatory condition of electric supply of company & take
all the safety precautions as per statutory requirements. AMC department time and again
during the entire contract period also will verify this.
TOOLS & TACKLES
The successful tenderer shall provide all the required tools and tackles for the operation
maintenance of the equipments. Central Workshop department time and again during
contract period will verify this.
WORKS TO BE CARRIED OUT
The works to be carried out under this contract shall except or otherwise provided in these
conditions include all labour, materials, tools, plant, equipment and transport which may be
required for preparation of and for the full and entire execution and completion of the
works. The description given in the schedule/scope of works shall unless otherwise stated be
held to in and for the entire execution and completion as aforesaid in accordance with good
practice and recognized principles
CONTRACTOR’S SUPERVISION
The contractor shall himself supervise the execution of works or shall appoint a competent
person to act in his stead. If in the opinion of the Corporation the contractor has himself
not sufficient knowledge and experience to be capable of receiving instructions or cannot
give his full attention to the works, the contractor shall at his own expense employ or his
accredited person, having experience in the field of Operation and Maintenance of Heavy
Duty Dewatering pump Vehicle with/without backhoe equipments deployed for such
activities. Orders given to the contractor’s person shall be considered to have the same force
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 22 -
or if these had been given to the contractor himself. At least one common supervisor for all
the vehicles shall be deployed by contractor for better coordination of work.
SAFETY PROVISIONS
The contractor shall at his own expenses arrange for the safety and security precautions as
required by the Corporation/necessary for such services, in respect of all labor directly or
indirectly employed for performance of the works and shall provide all facilities in
connection therewith. In case the contractor fails to provide such facilities, the Corporation
shall be entitled to do so and recover the costs thereof from the contractor. Contractor has to
manage for his own security (if he require) for safety of the vehicle &/or its any part there of,
even if parked at AMC location also.
MATERIAL AND WORKMANSHIP
The tenderer shall at his cost provide all materials required for the works. All materials to be
provided by the tenderer shall be in conformity with the specifications laid down in the
tender/as per the vehicle manufacturerʹs specification/instruction, the contractor shall if
requested by the Head, Central workshop Department or his authorized representative
furnish proof to the satisfaction of the Engineer or his authorized representative that the
materials so comply. All charges on account of outcry, terminal or Sales tax and other duties
on material obtained for the works from any source shall be borne by the tenderer.
The AMC or his authorized representative shall be entitled to have tests carried out for any
material supplied/used by the contractor other than those for which as stated above,
satisfactory proof has already been produced, at the cost of the contractor and the contractor
shall provide at his expense all facilities which the Corporation may required for this
If no tests are specified in the Contract and the Corporation requires such tests, the tenderer
shall provide all facilities required for the purpose and the charges for these tests shall be
borne by the contractor.
In order to maintain high standard of workmanship, the successful tenderer shall fix a
schedule for cleanliness and maintenance of the equipments. Sanitary conditions shall be
maintained throughout the period, with hygiene and environment getting the top priority.
The successful tenderer shall provide small size plantations wherever possible inside the area
allotted for Parking/ maintenance under O & M work to them.
OPERATION AND MAINTENANCE INCLUDING VEHICLES AND EQUIPMENT /
The contractor shall be responsible for smooth and satisfactory operation and maintenance
of the vehicles for 365 days round the year for a period of 5 (Five) Years from the date of start
More specifically, the contractor shall be responsible for the following: ‐
(1) To operate and maintain the vehicles in accordance with manufacturerʹs Heavy Duty
Dewatering pump Vehicle guideline. The vehicles attended to, by the contractor
including any ʺTrouble shootingʺ to ensure smooth and trouble free operation.
(2) The contractor shall prepare and implement, an effective operation and maintenance
programme in consultation with Central workshop Department, AMC. AMC will
not provide any skilled or unskilled work force, machinery or equipment other than
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 23 -
that specified in the tender document. It is absolute responsibility of contractor to
look after all sorts of maintenance whether preventive or breakdown.
(3) The contractor shall determine operating parameters for work mentioned
above in scope of work.
(4) For the smooth operation of the vehicles all the required equipment, vehicle, units,
accessories, consumables including Fuel (Diesel), grease, lubricating oils, cleaning
agents, all types of epoxy paint, material required for house keeping and cleaning
etc. are to be brought by the contractor. The quality of all consumable and spare
as per manufacture recommendation shall be made available at site/workshop all
the time and will be verified by Central Workshop department.
(5) The contractor shall be responsible for keeping up‐to‐date record of documents
including day to day log sheet of all the vehicles. The contractor shall maintain
and update logbook / computer record in which details of operational parameters are
recorded in every shift and at regular interval or as decided mutually.
The Contractor shall maintain separate checklist register for daily, weekly,
fortnightly, monthly, quarter yearly, half yearly and yearly activities.
(6) The contractor shall be responsible to carry out day‐to‐day as well as periodic
maintenance, necessary to ensure smooth and efficient performance / running
of all equipments as per manufacturer’s specification and maintaining the record of
the same. This will be verified by Central Workshop Department, AMC.
(7) The contractor shall have to issue identity cards with photographs, uniform to all
the staff employed for Operation and maintenance contract work.
It will be the responsibility of the successful tenderer to have comprehensive
insurance coverage of all vehicles, equipments etc along with their operating staff at
their cost. They are requested to note that there will not be any reimbursement in this
regard by AMC. In case any mishap / accident occurs on the road or at site, the
successful tenderer will have to shoulder the complete responsibility of the same,
right from registration of Police complaint, lodging / follow up of the insurance claim
and facing the court trials etc. It shall be the responsibility of successful tenderer to
set right the vehicle without raising any extra bills / claim against the same for
reimbursing the same from AMC. However, they shall be liable to receive all the
payments received by AMC (if claim amount issued to AMC by insurance company.)
against the settlement of insurance claims from the Insurance Institutions / it can be
directly reimbursed to the contractor by Insurance company. AMC authorities shall
give the full cooperation to the successful tenderer by signing the requisite
documents necessary for raising the insurance claim up to settlement of the same.
PROVISION OF GPS MECHANISM
Contractor as per the requirements of AMC, for effective communication shall provide
communication system/ equipments including GPS system (if asked by AMC) at his cost, as
per the AMC policy. At present AMC has decided to deduct Rs. 572/‐ per month per vehicle
for GPS system hardware and software expenditure, if GPS fixed by AMC. Detailed policy ‐
norms can be availed from AMC. Further if any change in policy will be made effective by
AMC, same shall be applicable to contractor, including charges for the same. In the event if
AMC ask contractor to provide GPS mechanism & its report system; then contractor has to do
so without any extra cost. (if GPS not provided by AMC then no monthly charge will be
IMPORTANT NOTE:
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 24 -
The contractor shall employ all required staff including operation Supervisor, technical
experts, skilled and unskilled labours, drivers etc. required for such services.
Contractor shall comply with all safety rules and regulations and all inter disciplinary
measures as followed by the AMC and required for such services
The AMC shall not be responsible for any accident /injury to the staff of the contractor. It is
contractor’s responsibility to take insurance of his employee, medical facility, work
compensation etc. as per workman compensation act and all other relevant laws. Further the
AMC will not provide any insurance, medical facility, workman compensation, etc. to the
staff of contractor.
Due to strike by the contractorʹs employees, the operation and maintenance of vehicles must
not be affected and the property of AMC should not be damaged. In such case any
dispute/discrepancy occurs the decision of Dy.Municipal Commissioner (Workshop) will be
final and will be binding to the contractor. Also if any expense is required to be made on this
account by AMC, it will be deducted from Contractorʹs bill/SD.
All Central/State Government/Semi‐Government/Local Bodyʹs Rules and Regulations
pertaining to this contract & / or services shall be strictly followed and observed by the
contractor without any extra cost to the AMC.
Payment will be made Every monthly against satisfactory work, as per certificates of various
authorities as mentioned in the tender.
The Security Deposit will be paid back only after the completion of entire Contract period
without any interest after deducting dues if any to be recovered from contractor.
The duration of the contract shall be for 5 years from the date of commencement of O & M
work. However AMC reserves the right to terminate the contract at any time by giving
months (30 days) notice to the contractor.
At the end of O & M contract period, contractor shall hand over the Heavy Duty Dewatering
pump Vehicles 03 Nos. in satisfactory working conditions acceptable to Municipal
Commissioner &/or Central Workshop Department / their authorized representative.
Otherwise penalty equivalent to the cost of repairs will be imposed by AMC at the discretion
of Municipal Commissioner & shall be binding to the contractor. This will be even recovered
from the contractor from any of his dues &/or security deposit with AMC.
AGREEMENT WITH MANUFACTURER FOR TECHNICAL BACKUP.
In case the tenderer is not the manufacturer/authorized dealer/agent/distributor/autho.
service dealer/ provider as mentioned in the tender, then the tenderer shall have proper tie‐
up agreement with the manufacturer/authorized dealer/agent/distributor for such vehicles
duly registered in India for the entire contract period, clearly stating that the
manufacturer/authorized dealer/agent/distributor will supply the spare parts, provide
technical support and services and with backup guarantee of the manufacturer/authorized
dealer/agent/distributor to AMC during the entire contract period.
This work is also inclusive of painting of vehicles at the regular interval of two year (if vehicle
found dirty) in normal case and as and when required in accidental/repairing situation. The
central workshop department will verify this. However, if any unit/mechanism will found to
have some defect in paintwork at any time, the Contractor has to repaint the same under the
instruction of Central workshop Engineer.
The contractor shall not employ guilty person or indiscipline person.
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 25 -
The Contractor shall have to take valid labour license & any other relevant license from
statutory bodies as required for this type of contract / services.
Successful bidder will have to follow all the provisions of, Labour laws, P.F. Act, E.S.I. Act,
Minimum Wages Act, workman compensation act etc. & have to incorporate changes made if
any during contract period also.
Contractor will have to strictly follow the provisions of Factory Act 1947, wages Payment
Act1936, Bonus Act 1965, Employees Provident Fund & Miscellaneous Provisions Act 1952 &
other Industrial & Labour Laws with latest amendments in act / rules related to this
Operation & Maintenance Work. Contractor will not be given any relaxation regarding these
Routine / preventive / break‐down maintenance of vehicles including all work that has to be
perform with such vehicles are in the scope of Contract
Upon failure of the Contractor to comply with any instructions given in accordance with the
provisions of this contract, the AMC has the alternative right, instead of assuming charge of
entire work, to place additional labour force, tools, equipments and materials on such parts of
the works, as the AMC may designate or also engage another Contractor to carry out the
work. In such cases, the AMC shall deduct from the amount which otherwise becomes due to
the Contractor, the cost of such work and materials with 10% added to overall departmental
charges and should the total amount thereof exceed the amount due to the Contractor, the
charges and should the total amount thereof exceed the amount due to the Contractor, the
Contractor shall pay the difference to the AMC. It should be specifically noted that wherever
bank guarantee is required to be submitted, it should be from Nationalized Banks/scheduled
bank / AMC approved bank list only.
CONTRACT PERIOD
The successful tenderer on award of contract shall have to commence the O & M work within
7 days from the receipt of vehicles.
The Contract will be for a period of Five years from the date of commencement of O & M
work subject to annual renewal (subject to GOI norms for vehicle scrap life & certificate of
fitness renewal by RTO dept.) as under. The same can be extended for a further period of
(Two Years‐ subject to GOI norms for vehicle scrap life & certificate of fitness renewal by RTO
dept.) Years by the corporation and on the terms and conditions mutually agreed upon in
The Contract will be renewed automatically at the end of each year subject to the Contractor
scoring at least a score of 75 under the following heads
PERFORMANCE POINT CERTIFICATE TABLE:
Sr. No Head Maximum Score of the
Score Contractor
1 Punctuality in work as per the contract
2 Operation of Vehicles
3 Maintenance of Vehicles
4 Overall efficiency of working
5 Execution of additional work
The above score will be calculated at the end of each year. The performance shall be reviewed
and reported by Central Workshop Department (for Sr.no.3, 4, & 5) and Zonal Engineering
Department (Sr.no.1 & 2) of AMC (based on service requirement certification method can be
changed by AMC ‐ even can be judged based on monthly penalty statement) and at the end
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 26 -
of the year it will be reviewed (even from monthly penalty statement it will be concluded). If
the average monthly score is above 75 (or penalty recommended found less than 25%) the
Contract will get automatically renewed.
For O & M Contract Price will be as per the bid in the Annexure 4 and will be inclusive of all
expenses necessary for the continuance of the O & M services under the contract. Such
expenses shall include but not restricted to payments to RTA, Labor Authorities, Local and
Municipal Authorities, Semi Govt., or any charges, deposits, fuels, taxes, oil, lubricants,
levies, toll taxes, GST tax (if any) etc., connected with the service. The all‐inclusive rate
should be filled up in the respective column.
Rates quoted by tenderer shall be inclusive of GST and other terminal tax etc. as may be
applicable and will be fixed for entire contract period. Only fuel price variation/change will
be applicable as per the condition and formula given in the tender document. Change in
taxes, duties, statutory levies etc. of Govt. Dept. will be applicable at actual.
The corporation reserves the right to increase or decrease the scope of work by 25%.
Contractor shall have to carry out 25% extra work at the same rate, terms and conditions if
asked to do so.
On specific occasions, the corporation reserves the right to ask the contractor to provide
additional services. The Contractor is bound to provide the same at a short notice of few
hours. The rates for additional services requested by the commissioner will be mutually
agreed upon between the Contractor and the commissioner.
The contractor shall provide well‐trained, disciplined, honest and sincere workforce,
throughout the contract period and supervise their work regularly.
They should not pose any problem, nuisance to the general public. The contractor shall be
solely responsible for the behaviors and honesty of its workforce.
The contractor shall appoint one supervisor to ensure that services are rendered effectively.
He must be available on site/at office during the working hours. At least one common
supervisor for the vehicles under contract shall be deployed by contractor for better
coordination of work in the field.
The maintenance supervisor shall be qualified person, and with experience and competent
and authorized by the contractor to take decisions at site. Such supervisor shall be deemed to
have full authority of the contractor and any instructions given to him by the corporation
officers shall be deemed to have been given to the contractor. The supervisor should be easily
accessible at all times and should have a mobile phone with them at all times. The Contractor
shall ensure that the supervisor or any other authorized representative shall invariably be
available either in person or over the telephone within the city every day for taking necessary
instruction and for proper co‐ordination.
The tenderer shall indicate the manpower including supervisor & their labors he proposes to
deploy and the methodology to be adopted. No decrease in the workforce shall be done once
notified without prior written approval of the Municipal Commissioner / officer incharge of
work. The commissioner may deduct suitable payments to the contractor if it is noticed that
the workforce is reduced without prior approval.
Contractor shall provide suitable uniform to all their staff including shoes and photo identity
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 27 -
The contractor must verify antecedents of the employees to be provided by the contractor
before deployment. The contractor shall engage no person having criminal record or who is
not the citizen of India.
The contractor may, at his own cost and responsibility, consider increasing his workforce,
equipments, and materials in order to discharge contractual obligation.
The Municipal commissioner reserves the right to ask for the replacement of the personnel
not found fit or suitable for undertaking the task assigned. The contractor shall do
replacement without any extra cost to the corporation within one week of the order.
Contractor shall pay salaries /wages etc. through bank to his workforce adhering to the laws
in force & all liabilities and responsibilities in respect of persons engaged by him shall lie with
the contractor.
To avoid mishap or accident during the operation, the Contractor shall ensure that only
skilled staff / drivers with sufficient experience in their respective trade and physical fitness
are deployed on the job and are not put to over exertion as per prevailing labor laws of the
State and / or Central Governments.
The staff/drivers deputed by the contractor during the course of contract must behave
decently with the corporation’s officer and staff. The Contractor shall withdraw such person
who is found to be indiscipline, misbehaving, under or the influence of any intoxicant or
whose services are considered detrimental to the corporation’s Interest. On giving intimation
to do so by the Municipal Commissioner or his authorized representative. The corporation
will serve a Notice to the contractor if he fails to comply. Failure to replace the personnel
after issuance of notice by the corporation will be considered to be is sufficient ground for
termination of the contract. It will not be binding to the corporation to justify the reasons to
the Contractor for advising such withdrawal of staff.
The Drivers/operators of the contractor must be in possession of a valid professional driving
license and the driving license should be at least three years old.
The contractor shall ensure that his personnel report to work everyday (when pump is
provided on duty) at designated time and work sincerely throughout the period prescribed in
the contract with AMC. The staff so deployed shall be given the statutory weekly off. The
contractor shall make provision for substitute manpower during weekly off of the staff and
statutory holidays so that the work is not affected at any site in the City. The corporation will
not pay any extra payment for making substitute arrangements on weekly off and other
The contractor shall not be paid or reimbursed by the AMC for any overtime work done by
his staff to complete the task and for maintaining the cleanliness at various locations. The
Contractor, through his supervisor, shall submit a report to corporation about number of
workforce which have reported to work as against the agreed workforce (if asked by AMC).
GENERAL CONDITIONS OF CONTRACT
‐ The vehicles shall be operated & maintained by the successful contractor with his
personnel for a period of three years from the date of initial execution of the work,
SEVEN days a week for one shift and if required for two or three shifts. The tenderer
has to quote for one shift of 8 hour, 12 hours and two shifts (i.e. 16 hours) per day as
per price format. It may require operating the vehicle in two or occasionally in three
shifts. If vehicle/s is/are operated for third shift (night shift) shift, additional payment
will be done at the rate of two shifts plus one shift of 8 hours quoted by party &/Or
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 28 -
sanctioned by AMC. The contractor shall employ required supervisor, mechanics,
technicians, one driver cum operator, and skilled / unskilled labour per vehicle. The
contractor shall arrange for fuel, lubricant, tools, spares and all consumables and all
other related materials & expenditures for smooth and uninterrupted working of
vehicle during the period of contract.
‐ The contractor shall have to maintain logbooks & shift register, present register of
the staff / has to show certificate for work done. Contractor has to get work done
certificate from the concerned deptt./ officers of AMC where/ under whom vehicle/s
put in use in the vehicle Log diary / certificate & copy of same must be enclosed
along with monthly bill submitted to Central Workshop/concerned deptt ; (as per
AMC instruction) AMC for payment procedure.
‐ For operating contract payment will be made only for those shifts for which work has
been carried out by contractor on the basis of rate quoted & sanctioned in tender.
‐ For comprehensive maintenance contract penalty will be imposed on the contractor
for delay work & off road period of the vehicle if it is delayed beyond reasonable
time as mentioned below;
‐ All minor repairing & preventive maintenance work shall be carried out within
Hrs. otherwise penalty will be imposed & will be deducted from the monthly bill of
the contractor for the days for which vehicle remain out of order as mentioned in
‐ All major repairing shall be carried out within 7 days otherwise penalty will be
imposed will be deducted from the monthly bill of the contractor for the days for
which vehicle remain out of order as mentioned in penalty table.
‐ Minor work Includes: Routine service, Hose replacement, electrical work, external
leakages (oil/water/diesel), mechanical / hydraulic settings, radiator work, general
bodywork, clutch repairing, gear /transmission repairing minor work, Pump / Engine
setting ‐ repairing, filter repair / replacement, electrical work etc. These shall be
carried out at site or at AMC’s parking place or as the case may be and allowed by
Major work Includes: Structural damages, Engine ‐ Pump o/h related, Gearbox /
clutch related major work , major purging unit damage, major body work / chassis
(structure) repairing work, turbo charge unit & / or mechanical unit work for Heavy
Duty Dewatering pump Vehicle etc.
‐ If contractor fails to provide the driver cum operator as per the requirement of AMC
penalty will be imposed as mentioned in the penalty table & which will be deducted
from the monthly bill of the contractor. Further in such circumstances AMC is at
liberty to use the vehicle with alternate arrangement & if any damages occur to the
vehicle, same also must be set right by the contractor for which no extra payment /
claim will be reimbursed to the contractor by AMC and this shall be binding on the
‐ The contractor shall be required to take comprehensive insurance for all the vehicles
during the contract period. It will be the responsibility of the successful tenderer to
have insurance coverage of their operating staff also. They are requested to note that
there will not be any reimbursement in this regard by AMC. As regards any mishap /
accident happened on the road or at site, the successful tenderer will have to
shoulder the complete responsibility of the same, right from registration of Police
complaint, lodging / follow up of the insurance claim and facing the court trials etc. It
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 29 -
shall be the responsibility of successful tenderer to set right the vehicle without
raising any extra bills / claim against the same to AMC. However, they shall be liable
to receive all the payments received by AMC (if issued to AMC by insurance
company) against the settlement of insurance claims from the Insurance Institutions
as per rules / they can get reimbursement directly from the insurance company. AMC
authorities shall give the full cooperation to the successful tenderer by signing the
requisite documents necessary for raising the insurance claim up to settlement of the
‐ The work force provided by the contractor shall have to be properly dressed in
uniform and shoes, safety gears for work requirement all the time. Each person
provided by the contractor shall have to display the Identity Card on the uniform,
‐ Contractor has to arrange for all drivers, Mechanics, labour, etc. & incur their salaries,
wages, fees etc. as per the prevailing rules and regulations & all liabilities and
responsibilities also lies with him.
‐ The Contractor shall ensure that his personnel report to works everyday at
designated time and continue working throughout the day. The Contractor shall
make provision for presence of requisite manpower during national holidays and
festivals etc. as per AMC requirement. The corporation for working on holidays,
national holidays and festivals will make no separate payments. The Contractor shall
ensure presence of his workforce at the specified time and place.
‐ The Contractor will be solely responsible for any consequences under laws, arising
out of any accident caused by his vehicles, equipments &/or his employees to the
property or personnel of the corporation &/or third party under this contract.
‐ The corporation shall not be responsible for any claim / compensation that may arise
due to damages / injury / death pilferage to the Contractor’s vehicles, equipments,
property, staff and any third party or the property, under any circumstances while
providing services under the Contract.
‐ Force Majeure shall mean such an Event or Circumstance or combination of Events
and Circumstances which are beyond the reasonable control of the Affected Party
and which the affected party could not have prevented by Good Industry Practice or
by the exercise of reasonable skills and care for the purpose of discharging its
obligations under the Contract. The Force Majeure will tend to have material adverse
effect on the performance of such affected party.
‐ The Contract shall stand terminated at the end of the Contract period unless
extended by the corporation in writing. In case if A.M.C. found continuous
shortcomings in the services of the contractor, which will be treated as “Deficiency of
Service” and AMC in such event can terminate the Contract with prior notice of
‐ The contractor shall obtain all necessary approvals, permits and licenses to operate
the said service. The corporation shall in no way be responsible for the loss occurring
to the contractor on this count.
‐ The commissioner reserves the right to impose additional financial penalty not
exceeding 10% of the monthly bill in a month in case the work is not found up to the
mark, during the routine inspection carried out by the corporation’s staff ( if
required, in case of continuous lapses). The decision on amount of penalty within the
above limit is at sole discretion of the Municipal Commissioner and shall be binding
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 30 -
on the contractor. This penalty will be over and above the routine penalties as
mentioned earlier for non‐performance as per the conditions.
‐ The Contractor shall indemnify the corporation and its employees against any
penalties as PRINCIPAL EMPLOYEER, for any failure of the Contractor to honor
various State Laws / Enactments / Contract Labour (R&A) Act 1970 (C) / Minimum
wages Act / Bonus Act / EPF & MP Act etc. and any other law prevailing during the
entire contract period.
‐ The successful Contractor shall have to submit performance security deposit which
shall be 5% of the one year O & M contract work amount based on daily 8 hrs
working shift approved rate as a contract performance security. This guarantee (BG)
shall be renewed timely (every yearly) till expiry of contract. This will be released
only after successful completion of the entire contract period and hand over of the
vehicles in satisfactory working conditions to the Central Workshop, AMC and if
there is no due to be recovered from the contractor for any reason. Further successful
tenderer has to enter in to an Agreement with Ahmedabad Municipal Corporation as
per rules within 15 days from the date of order.
‐ The operation & maintenance contract rate quoted by tenderer will be fixed for entire
5 years contract period. Only diesel price variation during the contract period will be
considered for which tenderer must have to clearly specify the % loading towards
diesel part in the operation contract without fail , which will be considered for diesel
price variation. Fuel cost increase or decrease will be allowed every quarterly & rate
applicable in the first week of new quarter will be taken in to consideration. Base rate
will be the rate applicable on the date of commencement of work. The formula for
determining the increase or decrease in the rate from the base rate will be as under;
Change in diesel part (E) Rs =A x B ‐1
New Rate of operation contract for quarter = A± E
A = current rate of operation contract
B = % age loading of diesel part in operation contract
C = Rate of diesel in this quarter
D = Rate of diesel in previous quarter
E = Change in diesel part
New rate will be sum of Maintenance contract rate and new rate of op. contract for
‐ During the contract period, necessary infrastructure like parking / repairing plot/area,
water, drainage, electricity will be provided by AMC. However if any temporary
storage / repairing facility required to be created, same will be carried out by
contractor at their own cost with prior approval of concerned AMC authority. At the
end of / as per the direction of AMC even during the contract period, contractor has
to vacate the place allotted to them & remove the facilities if any created by them
without any delay.
‐ The Contractor has to arrange for O & M of vehicles outside of Ahmedabad city as
and when required by AMC.
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 31 -
‐ Mobile phone and other communication equipments shall have to be provided for
each vehicle and to the supervisors for effective communication. Contractor has to
arrange for 24 hrs. Complain register phone No. For effective communication.
‐ At the end of O & M contract period, tenderer has to hand over the vehicles in
satisfactory working conditions acceptable to Municipal Commissioner &/or his
authorized representative/s of Central workshop deptt. Otherwise penalty will be
imposed by AMC at the discretion of Municipal Commissioner & shall be binding to
the contractor.
‐ All financial arrangement for this work shall be arranged by the Contractor. AMC
shall not be responsible for the financial constraints of the contractor.
‐ Contractor shall provide labor, semi skilled and skilled staff for operating the project
during the period of contract. The salary of staff and all other expenses shall be borne
by the contractor.
‐ Contractor shall have to depute sufficient staff for monitoring / reporting of various
activities related to contract.
‐ The Contractor shall be responsible for any damage occurring to the corporation’s
property and general public, incase the cause is attributed to the cleaners/supervisors.
The contractor shall have to get the same rectified at his own cost and risk, or
otherwise, the corporation at the risk and cost of the contractor shall attend the same
‐ The Contractor shall ensure, at all times that his supervisors/cleaners do not
misbehave with the corporationʹs staff or general public while on duty. The personnel
found misbehaving shall be immediately removed from the work at the risk of the
‐ The corporation shall not be responsible for any injury/death to the any staff of
contractor including drivers, supervisors, cleaners etc deployed by them. It is the
responsibility of the contractor to ensure that his personnel follow the safety
regulations strictly, which is in force from time to time.
‐ The Contractor shall obtain all necessary approvals, permits and licenses to operate
the said service. The corporation shall in no way be responsible for the loss occurring
to the contractor on this count.
‐ Contractor shall take all necessary insurances for the said work and workforce.
Insurance for Third Party Liability arising out of Contractorʹs vehicle, equipment,
cleaning agents or workforce shall also be taken from the first day of operation.
Corporation shall not be responsible for any losses occurring to the Contractor or
third party on this count.
‐ The commissioner reserves the right to impose financial penalty not exceeding 10% of
the monthly bill over and above the penalty mentioned for various defaults in
penalty clause in a month in case the work is not found up to the mark during the
routine inspection carried out by the Municipal Commissioner or corporation’s staff.
The decision on amount of penalty within the above limit is sole discretion of the
commissioner and shall be binding on the contractor.
‐ The Contractor shall maintain a First Aid Kit and other necessary medicines
including bandages, antiseptic creams/liquid, anti burn cream/powder as required to
attend to any emergency situations.
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 32 -
‐ The Contractor shall indemnify the corporation and its employees against any
penalties as PRINCIPAL EMPLOYEER, for any failure of the Contractor to honors
various State Laws / Enactments / Contract Labor (R&A) Act 1970 (C) / Minimum
wages Act / Bonus Act / EPF & MP Act / any laws affecting such services etc.
‐ The tenderer shall note that Municipal Commissioner Of Ahmedabad shall not be
responsible for any mishap or accident to workmen of the contractor or Municipal
Corporation Of Ahmedabadʹs employee working at site, while performing these
jobs and no compensation shall be payable by Municipal Corporation Of
Ahmedabad . In case of mishap or accident, the amount of compensation decided by
the concerned authorities will be kept in deposit from contractor’s bills/ will be paid
by contractor. The successful tenderer shall take all the precautions to avoid any
damages to municipal property while working. If any damage is noticed, the charges
for setting right the same will be recovered from their bills.
OPERATIONS AND USE OF VEHICLES & EQUIPMENTS
The Contractor shall be fully conversant with all the laws applicable to the work under the
contract including Motor Transport Work’s Act 1961 and even any amendment thereof.
The contractor shall submit a detailed Operations and Maintenance schedule at the time of
starting of work. The Contractor shall submit within four weeks of award of work. All
Preventive Maintenance procedures and Corrective Maintenance procedures described in the
Operations and Maintenance Manual shall be followed by the contractor.
The corporation shall have a right to charge the contractor for any damage caused to
corporation assets during the performance of contract by the contractor and the same shall be
recovered from the contractor in a month or from the amount payable to him.
Contractor shall keep enough spares for units for replacement during breakdown or
preventive maintenance.
Materials used for Hydraulic units should be of standard make & as per instruction /
specifications of central workshop of AMC.
Contractor shall submit daily / weekly/monthly report of the work done to the officer of
concern deptt. and Central Workshop department; AMC from time to time in the Performa
that may be prescribed.
The contractor shall be liable for penalty as under if he fails to perform his contractual
obligations besides any other action; the Municipal Commissioner may decide to take as per
the terms of the contract.
‐ All minor repairing & preventive maintenance shall be carried out within 24 Hrs.
otherwise penalty will be imposed as per penalty shown in penalty table below,
which will be deducted from the monthly bill of the contractor. Preventive
maintenance schedule shall be prepared in coordination with central workshop
‐ All major repairing shall be carried out within 7 days (however shall be confirmed by
Engineer of Central Workshop, AMC) otherwise penalty will be imposed as per
penalty shown in penalty table, which will be deducted from the monthly bill of the
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 33 -
Sr. Type of default Penalty to be impost
1 If contractor fails to carry out dewatering of Rs. 500/‐ per hour
accumulated water or carry out the work etc. as
per the scope of work and requirements of AMC
(when pump unit is on site)
2 In case the contractor fails to paint the Dewatering RS. 100/‐ per vehicle per day till
pump unit at every 24 months (if original color the same are painted.
3 If any of the pipes (Hose) found damaged and RS. 100/‐ per vehicle per day till
water is leaking from the unit the same are painted.
4 The dewatering pump units shall be exclusively Rs. 1000/‐ for first such incidence
used for AMC work only. Any deviation from this and then after Rs. 5000/‐ for such
shall attract penalty. (in absence of AMC incidence.
5 If any of the contractorʹs staff at the work is found Rs. 25/‐ per person for that
to be working without the prescribed safety gear, shift/event.
6 If contractor fails to provide the driver cum Rs. 500/‐ per person for that shift.
operator and labors as per the tender requirement
7 Non use of mobile by any of Supervisor/Manager Rs. 50/‐ for each of such event.
8 Not keeping valid driving license while Rs. 200/‐ for each such event.
dewatering pump unit is in working conditions.
9 If the supervisor is not found on the work during Rs. 500/‐ per such incidence
the prescribed working hours (either at any site or
at their office)
10 If the Dewatering pump unit‐ chassis bodywork / Rs. 100/‐ per day per dewatering
glass etc is found damaged and not repaired / pump unit till corrective work
replaced. carried out.
11 If the minor and major repairing work is not RS. 500/‐ per dewatering pump
carried out as per the schedule given in tender unit per day till the work
The penalty will be deducted from the monthly bill of the contractor. Further in above
circumstances AMC will be at liberty to use Vehicles with an alternate arrangement. During
such circumstances if any damage occurs to the Vehicle, &/or any claim arise due to such
situation same also must be set right by the contractor for which no extra payment / claim
will be reimbursed to the contractor by AMC. This shall be binding on the contractor.
The penalty will be deducted from the monthly bill of the contractor. Further in above
circumstances (sr.no. 6) AMC will be at liberty to use vehicle/s by an alternate arrangement
and during such circumstances if any damage occurs to the Vehicle same also must be set
right by the contractor for which no extra payment / claim will be reimbursed to the
contractor by AMC. This shall be binding on the contractor.
The tenderer / contractor shall keep the vehicles in perfect working condition to the
satisfaction of Central Workshop. AMC.
PAYMENTS FOR O & M WORK
The contractor shall raise monthly bills to the Central Workshop department for O & M
contract work at the rate agreed and approved under the contract.
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 34 -
Contractor shall submit his monthly bill in the 1st week of every month to the Central
Workshop deptt. From time to time along with duly certified work certificates as by
respective department and work done certificate as per the format given by AMC, from zonal
Zonal engineer.
For O & M contract payment will be made only for those shifts/ working for which work has
been carried out by contractor and approved by zonal Engineer dept. / officer incharge of
work on the basis of per 8 hour shift/ 12 hours/ two shifts (i.e. 16 hour shift) rate approved in
Contractor will be paid on a monthly basis subject to his producing satisfactory performance
certificate for work carried out from various departments as mentioned in the tender.
Income Tax as per statutory provision shall be borne by the Contractor. The corporation shall
deduct all statutory taxes like advance Income Tax, GST ‐ TDS etc from monthly payments
being made to the Contractor.
Corporate Tax / any tax assessed on the income of the Contractor, GST (if any) shall be the
responsibility and payable by the Contractor
In case the contractor decides to stop the work during the continuance of the contract or
withdraws from the work without at least 60 days prior notice or if services are terminated by
the AMC on account of Deficiency in Service, the 5% Security Deposit (performance security)
amount shall be forfeited and the contractor shall have no claim on the same. Further, the
corporation reserves the right to make alternative arrangements until new agency takes over.
The additional cost incurred on the same shall have to be borne by the contractor
The Contractor shall ensure timely payments to his workforce and meet all the contractual
commitments in terms of payments, insurance, safety of its workforce. All statutory payments
to the workforce shall be done immediately upon becoming due. The proof of payments
made and any statutory deductions from the wages of the workforce shall be submitted
within one week of making payments as and when required by AMC.
If due to less work &/or for any reason, AMC do not wish to run the vehicle/s for 8/12/16 hrs.
shift then contractor will be paid on prorate basis for actual working hours on that day. AMC
decision & rate calculation in such event/s will be final & binding to all.
Shift timing will be calculated (started) from start of vehicle from parking area & end will be
when vehicle come back again to parking area which is provided / identified by zonal Asst.
Engineering / officer incharge of work. However; contractor has to ensure fast & efficient
movement of vehicle/s in all the case. If AMC finds any inefficiency; can take necessary
actions including payment deduction & will be binding to contractor.
ACCIDENT / DAMAGES / CLAIMS / LIABILITIES
In the event of any accident/damage to third party by any the vehicle of the corporation
operated by the contractor, the corporation shall be completely free from any liability of any
nature occurred on account of the accident. The Contractor will be fully and exclusively
responsible for the liabilities arise on account of accident and damage to the vehicle,
manpower or to the third party. The Contractor will be fully and solely responsible for any
death or bodily injury to his staff member or any other person in the employment of the
contractor or to any other person during the performance of the contractual services to the
AMC. This includes any third party claims also.
The Contractor will be solely responsible for any consequences under various laws, arising
out of any accident caused by vehicles, equipments or his employees to the property or
personnel of the corporation.
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 35 -
The corporation shall not be responsible for any claim / compensation that may arise due to
death / injury / damage caused by municipal vehicle used by the contractor to any third party
or his own staff while providing services to AMC under the Contract.
INDEMNIFICATION
The Contractor shall bear responsibility for loss of or damage to the property, suffered by
AMC, death or injury to person (or any claim against AMC in respect thereof and all
expenses relating thereto) in connection with the services provided under the Contract
resulting from any negligent act or omission of the Contractor. The Contractor will hold the
AMC fully indemnified in respect thereof.
The indemnified party shall have the right, but not the obligation, to contest, defend, and
liquidate any claim, action, suit or proceeding by any third party alleged or asserted against
AMC in respect of, resulting from, related to or arising out of any matter for which the AMC
is entitled to be indemnified there under, and the reasonable costs and expenses thereof shall
be subject to the indemnification obligations of the Contractor there under. The Contractor
shall be liable for all payments, proceedings, and liabilities including payment of counsel fees.
The Contractor shall at all times indemnify the Municipal Corporation against all claims,
damages or compensation under the provisions of Payment of Wages Act 1936, Minimum
Wages Act 1948, and Departments Liability Act 1938, The Workmen’s Compensation Act
1923, Industrial Dispute Act 1947, Indian Factories Act 1948 and Maternity Benefit Act 1951 or
any modifications thereof and rules made there under from time to time or as a consequence
or any accident or injury to any workmen or other persons in or about the works, whether in
the employment of the contractor or not, save and except where such accident or injury have
resulted from any act of the Municipal Corporation, their agents or servants and also against
all costs, charges and expenses of any suit, Action or proceedings arising out of such
accident or injury and against all sum or sums which may with the consent of the
contractor be paid to his obligations and liabilities as above provided. The Contractor shall
insure against all claims, damages or compensation payable under the various acts
mentioned above or any modifications thereof or any other law relating thereto.
Income Tax as per statutory provision shall be borne by the Contractor. The corporation
shall deduct all statutory taxes like advance Income Tax, GST TDS (if any) etc from monthly
payments being made to the Contractor.
Corporate Tax / any tax assessed on the income of the Contractor, GST tax (if any) shall be the
responsibility and payable by the Contractor.
In case the contractor decides to stop the work during the continuance of the contract or
withdraws from the work without at least 60 days prior notice or if services are terminated by
the AMC on account of Deficiency in Service, the 5% Performance Security deposit amount
shall be forfeited and the contractor shall have no claim on the same. Further, the corporation
reserves the right to make alternative arrangements until new agency takes over. The
additional cost incurred on the same shall have to be borne by the contractor
LIABILITY FOR DAMAGES AND RISKS
The Contractor shall be responsible for all risks to the work and shall make good at his own
cost, all loss or damage, whether to the works themselves or to any other Municipal
property, or third party or to the lives, persons, or property of others, from whatsoever
cause, arising out of, or in connection with the works, either during their progress or during
the defects liability period, and this although all reasonable and proper
precautions may have been taken by the Contractor, and in case the Commissioner or the
Corporation shall be called upon to make good any such costs, loss or damages, or to pay
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 36 -
compensation (including that payable under the provisions of Workmen’s Compensation
Act ) to any person or persons sustaining damage as aforesaid by reason of any
act or of any negligence or omissions on the part of the Contractor, the amount which the
Commissioner may pay in respect thereof and the amount of any costs or
charges(including law costs and charges ) in connection with legal proceedings which he
may incur in reference thereto, shall be charged to the Contractor. The Commissioner
shall have full power and right at his own discretion to pay or to defend or compromise any
claim which may be made against the Corporation for damage or in case of threatened legal
proceedings, or in anticipation of legal proceedings being instituted, consequent on the
action or default of the Contractor, to take such steps as he may consider necessary or
desirable to ward off or mitigate the effect of such proceedings charging to the Contractor, as
aforesaid, any sum or sums of money which he may pay and any expenses, whether for
reinstatement or otherwise which he may incur and the propriety of any payment, defense
or compromise, or of the incurrence of any such expense shall not be
called in question by the Contractor and will be recovered from the contractor.
The Contractor shall be held responsible for any obligations, damages and fines etc. arising
out of or in connection with the works either during their progress or during the defects
liability period and shall indemnify the Municipal Corporation or the Commissioner against
them and make good any such damages, fines and dues arising out of non‐compliance
of any regulation by the Contractor which may develop on the Corporation or the
The Contractor shall ensure timely payments to his workforce and meet all the contractual
commitments in terms of payments, insurance, safety of its workforce. All statutory
payments to the workforce shall be done immediately upon becoming due. The proof of
payments made and any statutory deductions from the wages of the workforce shall be
submitted within one week of making payments.
The commissioner reserves the right to carry out inspection, as and when required without
intimating the contractor, of the various locations where work is in progress. Any
shortcoming found during inspection will be intimated to the contractor or his supervisor
orally or in written which shall have to be attended immediately by the contractor or his
supervisor. The penalties imposed on the contractor from time to time, shall be recovered
from the Monthly Bill or adjusted against the 5% SD amount. The corporation reserves the
right to treat continuous shortcomings as “Deficiency of Service” and terminate the Contract
after giving one month notice.
i) Notwithstanding the provisions of above, the contractor shall not be liable for forfeiture of
its Performance Security/ Contract Deposit, liquidated damages or termination or other
failure to perform its obligations under the contract is result of an event of force Majeure.
ii) For purposes of this clause, “Force Majeure” means an event beyond the control of the
Contractor and not involving the Contractor’s fault or negligence and not foreseeable. Such
events may include, but are not restricted to, acts of the Purchaser either in its sovereign or
contractual capacity, wars or revolutions, fires, floods, epidemics, quarantine restrictions and
freight embargoes.
iii) If a force Majeure situation arises, the Contractor shall promptly notify the Purchaser in
writing of such condition and the cause thereof. Unless otherwise directed by the Purchaser
in writing, supplier shall continue to perform its obligations under the contract as far as is
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 37 -
reasonably practical, and shall seek all reasonable alternative means for performance not
prevented by the Force Majeure event.
Force Majeure shall mean such an Event or Circumstance or combination of Events and
Circumstances which are beyond the reasonable control of the Affected Party and which the
affected party could not have prevented by Good Industry Practice or by the exercise of
reasonable skills and care for the purpose of discharging its obligations under the Contract.
The Force Majeure will tend to have material adverse effect on the performance of such
affected party.
Following shall be the events and circumstances of Force Majeure:
Act of War (whether declared or undeclared), invasion, armed conflict or act of foreign
enemy, blockade, revolution, riots, insurrection, civil commotion, act of terrorism, or sabotage
The expropriation or Compulsory acquisition or seizure of the assets of The Contractor by
any Governmental Instrumentality, provided that this clause shall not apply where such Act
constitutes a remedy or sanction lawfully exercised as a result of a breach by the Contractor
of any Indian law or Indian Directive but excluding any change in law.
Act of God epidemic, lightning, earthquake, cyclone, whirlwind, flood, tempest, storm,
drought, lack of water or other unusual or extreme adverse weather or environmental
conditions, action of the elements, meteorites, fire or explosion to the extent generated from
the source external to the Contractor or his assets due to reasons other than, those caused by
negligence of the Parties, chemical or radioactive contamination or ionizing radiation.
Procedure for Calling Force Majeure: The affected party shall notify to the other party in
writing of the occurrence of the Force Majeure as soon as reasonably practicable, and in any
event within 24 hours (Twenty Four hours) after the Affected Party knew, or ought
reasonably to have known, of its occurrence and that the Force Majeure would be likely to
have a material impact on the performance of its obligations under the Contract.
The notice shall include full particulars of the nature of Force Majeure event, the effect it is
likely to have on the Affected Party’s performance of its obligations and the measures, which
the Affected Party is taking, or proposes to take, to alleviate the impact of the Force Majeure
Event and restore the performance of its obligations. When the affected Party is able to
resume performance of its obligations under this Contract, it shall promptly give the other
party written notice to that effect provided that in no event shall the suspension of
performance be of greater scope and of longer duration than is necessitated by Force Majeure.
The rights and obligations of the Affected Party shall be suspended to the extent they are
affected by the Force Majeure. AMC shall not be liable to make any payments to the
contractor for it being affected on account of Force Majeure.
AMC reserves the right to terminate the contract if the Force Majeure continues for more than
15 (Fifteen) days at a stretch.
CANCELLATION OF CONTRACT IN FULL OR IN PART
a. If the Contractor at any time makes default in proceeding with the work with
due diligence and continues to do so after notice in writing of fourteen days from
the Dy. Municipal commissioner (Workshop); or
b. Commits default in complying with any of the terms and conditions of contract
and does not remedy it within fourteen days after a notice in writing is given to him
in that behalf by the Dy. Municipal commissioner (Workshop);, or
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 38 -
c. Fails to complete the works or items with individual dates completion, on or before
the date(s) of completion and does not complete them within the period specified in
a notice given in writing in that behalf by the Dy.Municipal commissioner
(Workshop);, or
d. Shall offer or give or agree to give to any person in Municipal Corporation service
or to any person on his behalf any gift or consideration of any kind as an
inducement or reward for doing or forbearing to do or for having done or
forborne to any other contract for the Municipal Corporation, or
e. Shall obtain a contract with the Municipal Corporation as a result of ring tendering
or other non bonafide methods of competitive tendering; or
f. Being an individual or a firm, any partner thereof, shall at any time be adjudged
insolvent or have a receiving order or order for administration of his estate made
against him or shall take
any proceedings for liquidation or composition (other than voluntary liquidation
for the purpose of amalgamation or reconstruction) under any Insolvency Act for
the time being in force or make any conveyance of assignment of his effects or
composition or arrangement for the benefit of his creditors or purport so to do, or
if any application be made under any insolvency Act for the tile being in force for
the sequestration of his estate or if a trust deed be executed by him for his
g. Being a company, shall pass a resolution or the court shall make an order for the
liquidation of his affairs, or a receiver or a manager on behalf of the debenture
holders shall be appointed or circumstances shall arise which entitle the court of
debenture holders to appoint a receiver or a Manager, or
h. Shall suffer an execution being levied on his goods and allow it to be continued for
a period of 15 days, or
i. Assigns, transfers, sublets (engagement of labour on a piece work basis or labour
with materials not to be incorporated in the work, shall not be deemed to be
subletting) or attempts to assign, transfer or sublet, the entire works or any
portion thereof without the prior written approval of the Commissioner; the
Commissioner may without prejudice to any other right or remedy which shall
have accrued or shall accrue thereafter to the MUNCIPAL CORPORATION by
written notice cancel the contract as a whole or only such items of work in default
from the contract.
The Commissioner shall on such cancellation have powers to;
(a) Take possession of site and any materials, constructional plant, implements, stores,
etc., thereon and/or
(b) Carry out the work by any means at the risk and cost of the contractor.
On cancellation of the contract in full or in part the AMC shall determine what
amount, if any, is recoverable from the contractor for completion of works or in case
the works or part of works is not completed, the loss or damage suffered by the
Municipal Corporation, in determining the amount, credit shall be given to the
contractor for the value of the work executed by him upto the time of cancellation.
Any excess expenditure incurred or to be incurred by the Municipal
Corporation in completing the works or part of the works or excess loss or
damages suffered or may be suffered by the Municipal Corporation as aforesaid
after allowing such credit shall be recovered from any money due to the Contractor
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 39 -
on any account and if such moneys are not sufficient the Contractor shall be called
upon in writing to pay the same within thirty days. If the Contractor shall fail to pay
the required sum within the aforesaid period of thirty days, the AMC shall have right
to sell any or all of the Contractor’s unused materials, constructional plant,
implements, temporary buildings etc. And apply the proceeds of sale thereof
towards the satisfaction of any sums due from the Contractor under the contract,
and if thereafter there be any balance outstanding from the Contractor it shall be
recovered in accordance with provision of the contract.
Any sums in excess of the amounts due to the Municipal Corporation and
unsold materials, constructional plant etc. shall be returned to the Contractor,
provided always that if cost or anticipated cost of completion by the
Municipal Corporation of the works or part of the works is less than the amount
of which the Contractor would have been paid had he completed the works or
part of the works, such benefit shall not accrue to the Contractor.
Without prejudice to the generality of the foregoing, the Contractor shall deposit the
amount, as security deposit shall be absolutely forfeited to the Municipal Corporation
for such failure, or breach or determination of contract.
FORECLOSURE OF CONTRACT IN FULL OR IN PART
If at any time after acceptance of the tender the Commissioner shall decide to
abandon or reduce the scope of the works for any reasons whatsoever and hence not
require the whole or any parts of the works to be carried out, he shall inform the
Contractor in writing to that effect and the Contractor shall have no claim to
any payment or compensation or otherwise whatsoever, on account of any profit or
advantage which he might have derived from the execution of the works in full but
which he did not derive in consequence of the foreclosure of the whole or part of the
Provided always that nothing herein contained shall be deemed to render the
Contractor liable for or in respect of or to indemnify the Municipal Corporation
against any compensation or damage causes by the Excepted Risks.
TERMINATION OF CONTRACT
The Contract shall stand terminated at the end of the Contract period unless
extended by the corporation in writing. However AMC reserves the right to
terminate the contract at any time by giving 1 month (30 days) notice to the
i) In case the successful bidder fails to deliver the services as stipulated in the tender,
the Commissioner reserves right to get it done from alternate sources at risk, cost and
responsibility of successful bidder.
ii) If it is observed that the Contractor carrying out the work fail to comply with
instructions given by the authorities at the Dy. Municipal Commissioner / Municipal
Commissioner’s level during execution of work thrice, the work will be terminated
and will be carried out at the risk and cost of the contract & penal action will be taken
against them. This decision will not be arbitrable at all.
iii) The above condition will be in addition to the relevant condition in General
Conditions of Contract regarding cancellation of full or part of the work, finality of
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 40 -
the decision of the disputes, differences or claims raised by the contractors relating to
any matter arising out of the contract
The successful Contractor shall have to enter in to an Agreement with Ahmedabad
Municipal Corporation.
This is subject to the jurisdiction of the competent court of Ahmedabad only.
Tenderer’s Sign Joint director (Mechanical)
With seal Central Workshop.
Ahmedabad Municipal Corporation
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 41 -
Ahmedabad Municipal Corporation
INFRASTRUCTURE & UTILITIES
The corporation shall provide locations for parking, minor repair and maintaining the
vehicles. Necessary energy charges, water charges, property tax (if any, when separate plot
for regular parking and repair ‐ maintenance is given to contractor by AMC, based on
AMC policy‐ norms ) and other govt. levies etc will be borne by contractor.
All necessary infrastructure shall be developed by contractor at their own cost after
permission from the AMC, zonal Engineer Deptt. / other Deptt. for O & M contract work,
(when separate plot for regular parking and repair ‐ maintenance is given to contractor by
AMC) and such infrastructure shall be a removed at the end of contract / as per the direction
of AMC even during the contract period by contractor and contractor has to vacate the place
allotted to them & remove the facilities if any created by them without any delay.
Contractor ’s Sign Joint Director (Mechanical)
With seal Central Workshop.
Ahmedabad Municipal Corporation
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 42 -
Ahmedabad Municipal Corporation
Central Workshop
QUALIFICATION/ELIGIBILITY CRITERIA
Following are the minimum requirement to qualify in the tender.
A. Only duly registered Firm/Company can submit Bids. Provide Certificate of Registration.
(GST / IT etc.)
B. Registration
The bidder shall have the following registrations and details of the same be provided
in the Technical Bid :
i). PF registration.
ii). Licence issued by Labour commissioner.
C. Service provider of such type of Heavy Duty Mobile Dewatering pump Vehicles &/Or
Emergency flood related vehicle (Above 50 hp Engine Capacity / 500 M3 / hr. capacity)
can take part in the tender for which necessary documentary proof should be enclosed
with tender. Necessary documentary proof shall be attached with the tender.
D. Financial Criteria:
The tenderer should submit CA certificate for the financial data for F.Y. 2022~2023,
2023~2024 and 2024~2025 year.CA certificate must also be attached with tender. The
tenderer should have average annual turnover of 30% of Estimated value of tender Rs.
225.00 Lakh (i.e. not less than Rs. 67.50 Lakh) for the last three financial years as
mentioned above.
E. Experience Criteria:
Work Experience Criteria As service Provider
The tenderer should be the service provider of Heavy Duty mobile Dewatering
pump Vehicles &/Or Emergency flood related vehicle (Above 50 hp Engine Capacity /
500 M3 / hr. capacity ) of any mobile type either on rental basis by providing their own
vehicles &/or under O & M contract basis work by using department / authorityʹs
vehicles & / or under integrated project management work by using such vehicles.
Tenderer must be having at least Two years of continuous experience for above referred
work. Necessary documentary proof shall be attached with the tender. A detail showing
all works of similar types and magnitude or other as mentioned above) carried out and
on hand with the tenderer along with certificate of satisfactory performance from the
institution to whom the Tenderer has provided services should be also mentioned.
Tenderer must have executed in single work order / rate contract of such vehicle
mounted Heavy Duty mobile Dewatering pump Vehicles &/Or Emergency flood
related vehicle (Above 50 hp Engine Capacity / 500 M3 / hr. capacity ) during last 7 years
ending 31.07.2026 in any Municipal Corporation/ ULBs / Government / semi Govt.
organization / institutions / etc. either on rental basis by providing their own vehicles
&/or under O & M contract basis work by using department / authorityʹs vehicles & / or
under integrated project management work. Necessary documentary proof shall be
attached with the tender.
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 43 -
He must be having the Experience of successfully completed similar work/s for at least
two full (Continuous) years during last 7 years ending 31‐07‐2026; it should be either of
the following :
a. Three similar works which should not be less than 40% of work value / quantum (i.e. not
less than Rs. 90 Lakh in each order) of the estimated work value / quantum of this tender
b. Two similar works which should not be less than 50% of work value / quantum (i.e. not
less than Rs. 112 Lakh in each order) of the estimated work value / quantum of this
c. One similar work which should not be less than 80% of work value / quantum (i.e. not
less than Rs. 180 Lakh in each order) of the estimated work value / quantum of this
Similar work means having experience as service provider with such vehicle mounted
Heavy Duty mobile Dewatering pump Vehicles &/Or Emergency flood related
vehicle (Above 50 hp Engine Capacity / 500 M3 / hr. capacity) in any Municipal
Corporation/ ULBs / Government / semi Govt. organization / institutions / etc. either on
rental basis by providing their own vehicles &/or under O & M contract basis work by
using department / authorityʹs vehicles & / or under integrated project management
F. The tenderer shall furnish a satisfactory performance certificate for service providing
work from the past/ current customers for at least One work with details & itʹs working
together with self‐attested copies of order/s received from those client/s.
G. All related duly self attested documents like work order, performance certificates, RTO
Registration Book etc. shall be submitted with the tender. The tenderer shall furnish
satisfactory performance certificate for the work executed by him. Necessary
documentary proof shall be attached with the tender.
H. The tenderer shall furnish the list of Municipal corporations /ULBs /Institutions etc. with
Address & Tel. no. to whom Services have been rendered during the preceding seven
years along with numbers of equipments/vehicles.
I. Disqualification
Disqualification Even though the Applicants meet the above criteria, they are subject
to be disqualified if Applicant or any of its constituent partners have: ‐ Made
misleading or false representation in the forms, statements, and attachments
submitted; or ‐ Been debarred or terminated or blacklisted (and effect is continue on
due date of this tender) by Central Govt. organization / State Govt. organization /
AMC / Any Municipal Corporation / ULBs
In case of a proprietary firm, partnership, private ltd, limited firm the following are
the disqualification in case of failure to disclose information by partners or the
(i) If, any of the directors, partners or the proprietor is debarred / blacklisted by Central
govt. organization / State Govt. organization / ULB / Any Municipal Corporation /
AMC or any other Agency of Government of India or any of the State Government.
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 44 -
(ii) If, any of the directors, partners or the proprietor has a criminal history or has been
convicted by any court of law for any of the offenses under any Indian laws.
(iii) If, any criminal proceeding is pending in any court of law in India against any of the
directors, partners or a proprietor and if any such proceeding culminates into
(iv) If, any criminal proceeding is pending in any court of law in India against any of the
directors, partners or a proprietor and if any such proceeding culminates into
However; merits of such actions will be reviewed by Municipal Commissioner; AMC
(If need be) and can take decision accordingly after review, which will be final &
binding to all tenderer.
Note: The experience as sub contractor shall not be considered
Contractor’s Sign Joint director (Mechanical)
With seal Central Workshop
AhmedabadMunicipal Corporation
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 45 -
Ahmedabad Municipal Corporation
Central Workshop
Details of Tenderer
Submit details of all members of Joint Venture / Consortium /MoU / association partners)
1. (a) Name of firm :
(b) Address of the office(s)
(c) Date of incorporation and/or commencement of business
Details of Service Provider
(a) Name of firm :
(b) Address of the office(s)
(c) Date of incorporation and/or commencement of business
2. Brief description of the Supplier’s main lines of business.
Brief description of the Service Provider’s main lines of business.
3. Details of individual(s) who will serve as the point of contact / communication for AMC
with the Tenderer / contractor:
(b) Designation:
(c) Company/Firm:
(e) Telephone number:
(f) E‐mail address:
(g) Fax number:
(h) Mobile number:
4. Name, Designation, Address and Phone Numbers of Authorized Signatory of the bidder
(b) Designation:
(c) Company/Firm:
(e) Telephone number:
(f) E‐mail address:
(g) Fax number:
(h) Mobile number:
5. Details of Principal Manufacturer/supplier
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 46 -
(b) Designation:
(c) Company/Firm:
(e) Telephone number:
(f) E‐mail address:
6. Details of the equipment supplied as per Clause 1.0,Appendix
• Specification
• Brief description
• Delivery Schedule
S.No Details Action Remarks
1 Whether tendering firm/company is Say Yes/No
duly registered? Name of the registering
authority.(attach certificate)
2 Whether the tenderer is the Say Yes/No
Manufacturer of the Vehicles/
Equipment proposed to be supplied?
3 Details of Vehicles /Equipment (as Attach separate sheet giving
mentioned in the tender) supplied? details
4 Attach performance certificates from the Attach Certificate
past purchasers together with attested
copies of purchaser order received from
those clients as mentioned in the
qualification criteria.
5 Whether the tenderer and / or his Say Yes / No.
service provider have been black listed / Give details
work terminated by any civic
authority/department / any govt. or semi
govt. authority?
6 Details of service providing work as Submit details
mentioned in tender.
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 47 -
Ahmedabad Municipal Corporation
Central Workshop
Financial Quotation for the Comprehensive Operation and Maintenance contract for
(Five) Years of Existing Heavy Duty Truck Mounted Dewatering Pump ‐ 03 Nos. As per
AMC tender specifications, scope of work & terms ‐ conditions.
Compulsory Online
The Municipal Commissioner
Ahmedabad Municipal Corporation.
Mahanagar Seva Sadan.
Ahmedabad‐380001
Sub: Financial Quote for Comprehensive Operation and Maintenance contract for 5 (Five)
Years of Existing Heavy Duty Truck Mounted Dewatering Pump ‐ 03 Nos. As per
AMC tender specifications, scope of work & terms ‐ conditions.
Dear Sir/Madam,
We, hereby, having reviewed and fully understood all the terms and conditions of
this Procurement Document, submit our financial quote for the Comprehensive O & M
contract work of following equipment for your evaluation. The price quoted includes
packing, forwarding charges, insurance, all taxes and duties etc. at Ahmedabad, Gujarat at
site specified by AMC and will be as per tender terms & scope of work of the tender
Document. Notwithstanding any qualifications or conditions, whether implied or otherwise,
contained in our Quotation we hereby represent and confirm that our Quotation is
unconditional in all respects and we agree to the terms of this Tender Document.
SCHEDULE OF PRICE
A. Comprehensive Operation and Maintenance Contract for 5 (Five) Years of Existing
Existing Heavy Duty Truck Mounted Dewatering Pump of AMC as per AMC Tender
Scope of Work & Conditions.
Sr. Particulars Qty. Rate per shift Rate per shift Rate per shift
No of 8 Hrs. of 12 Hrs. of 16 Hrs.
working per working per working per
Vehicle per Vehicle per Vehicle per
day Rs day Rs day Rs.
1 Comprehensive Operation
Contract for 5 (Five) Years of Nos.
Existing Heavy Duty Truck
Mounted Dewatering Pump
of AMC As per scope of work
and conditions mentioned in
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 48 -
2 Comprehensive Maintenance
Contract for 5 (Five) Years of
Existing Heavy Duty Truck
Mounted Dewatering Pump
of AMC As per scope of work
and conditions mentioned in
3 Sub Total Rs.
% loading towards diesel part in the operation contract price quoted in A‐1 above: ………..%
* TENDERER HAS TO QUOTE AS PER ABOVE FORMAT ONLY in Online tender.
Only diesel price variation during the contract period will be considered for which tenderer
must have to clearly specify the % loading towards diesel part in the operation contract price
without fail, which will be consider for diesel price variation. Otherwise it will be taken as
60% and will be binding to the tenderer.
* TENDERER HAS TO QUOTE AS PER ON LINE FORMAT ONLY.
Only diesel price variation during the contract period will be considered for which tenderer
must have to clearly specify the % loading towards diesel part in the operation contract price
without fail, which will be consider for diesel price variation. Otherwise it will be assumed as
60% and will be binding to the contractor.
Please provide information on applicable fields.
Yours faithfully,
For and on behalf of (Name of tenderer)
Duly signed by the Authorized Signatory of the tenderer
(Name, Title and Address of the Authorized Signatory)
Note:‐ Tender Evaluation for Lowest Bidder:
The decision of lowest rate will be on the basis of rates quoted for repairing as well as for O &
M of different shifts and will be calculated as under;
• Rate of tenderer = (0.6 x A) + (0.2 x B) + (0.2 x C)
A= Rate per 8 Hrs. working shift of O & M work per Vehicle per day Rs.
B= Rate per 12 Hrs. working shift of O & M work per Vehicle per day Rs.
C= Rate per 16 Hrs. working shift of O & M work per Vehicle per day Rs.
The tenderer whose Rate of tenderer Found lowest based on above formula will be
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 49 -
I / We agree that all the clause, information mentioned in this tender document are correct as
per my knowledge and I / We have read and understood all the terms and conditions
mentioned in document carefully. I / We abide to agree and follow to the terms and
conditions stated in the tender.
I/We agree that we have no objection if inquiries are made about our works, its related areas
and any other inquiry regarding all details, projects and works listed by us in the pre‐
qualification document at any state.
Date:‐ Name of Tenderer:‐
Place:‐ Sign / Stamp
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 50 -
General Information:
All individual firms are requested to complete the information in this form. Individual
information should be provided for all owners, directors or applicants that are partnerships
public / Pvt. Ltd. or individually owned firms.
1 Name of firm:
2 Type of firm: Proprietary/ Partnership/ Pvt. Ltd./Public Ltd/NGO
3 Head office address:
4 Local office address (if any):
5 Authorised Person :
6 Mobile: Contact:
7 Landline: Contact:
8 Facsimile: Fax:
10 Place of incorporation / registration: Year of incorporation / registration:
11 Main lines of business:
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 51 -
Audited financial statements :
Attach true copy
‐ Bidder shall furnish Turnover certificate for financial year 2022‐2023, 2023‐2024 and
2024‐2025 separate CA certificate for Contractual work shall be submitted.
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 52 -
History of litigation :
Applicant should provide information on any history of litigation or arbitration resulting
from contracts with Any Municipal corporation, ULBs, Central Govt, State Govt, Govt
Authority etc..
Year Award for / or Against Name of Client, cause of Disputed amount in
applicant Litigation and matter of dispute Rupees
Note: If the information to be furnished in this schedule is not given and come to the
knowledge of AMC subsequently and found against tender terms it will result in
disqualification of the bidder.
Also submit latest status along with documentary evidences.
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 53 -
Photographs of Partners / Managing Director / Proprietor / Directors / Power of attorney
1 I/We agree that the decision of the Ahmedabad Municipal Corporation in pre‐
qualification/selection of applicants/contractor, Phasing of work and in any other project
related matter, will be final and binding to the me/us.
2 All the information and date furnished herewith are correct to my/our best of
3 I/We agree that I/we have no objection if inquiries are made about our works, its
related areas and any other inquiry regarding all details, projects and works listed by us in
the pre‐qualification document at any state.
Signature with seal of the company
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 54 -
DECLARATION OF THE TENDERER :
I / We hereby declare that I / We have made myself / ourselves thoroughly conversant with
the local conditions regarding scope of work, all materials and labour on which I / We have
based my / our rates for this tender. The specifications and leads on this work have been
carefully studied and understood before submitting this tender. I / We undertake to use only
the best materials approved by the Engineer in charge or his duly authorized representative
during execution of the work and to abide by the decision of AMC.
Signature of Applicant
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 55 -
AFFIDAVIT * Rs. 300 Stamp :
DECLARATION OF THE CONTRACTOR :
1.0 I, the undersigned, do hereby certify that all the statements made in the required
attachments are true and correct. I also understand that in case of wrongful/false
information, corporation is entitled to take any civil & criminal punitive action
2.0 The undersigned also hereby certifies that neither our firm M/s
_______________________ _____________________ nor any of its constituent partners,
directors etc have abandoned any work in India nor any contract awarded to us for
such works has been rescinded.
3.0 The undersigned hereby authorize(s) and request(s) any bank, person, authorities,
Government, or public limited institutions, firm or corporation to furnish pertinent
information deemed necessary and requested by the AMC to verify our statements or
our competence and general reputation.
4.0 The undersigned understands and agrees that further qualifying information may be
requested, and agrees to furnish any such information at the request of the AMC.
5.0 The AMC and its authorized representatives are hereby authorized to conduct any
inquiries or investigations to verify the statements, documents, and information
submitted in connection with this application and to seek clarification from our
bankers and clients regarding any financial and technical aspects. This Affidavit will
also serve as authorization to any individual or Authorized representative of any
institution referred to in the supporting information, to provide such information
deemed necessary and requested by you to verify statements and information
provided in the Tender or with regard to the resources, experience and competence
of the Applicant.
I / We hereby declare that I / We have made myself / ourselves thoroughly conversant with
the local conditions regarding scope of work, all materials and labour on which I / We have
based my / our rates for this tender. The specifications and leads on this work have been
carefully studied and understood before submitting this tender. I / We undertake to use only
the best materials approved by the Engineer incharge or his duly authorized representative
during execution of the work and to abide by the decision of AMC.
Signed by the Authorized signatory of the firm
Title of the office
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 56 -
Name of the firm
Note: The affidavit format as indicated above to be furnished on non‐judicial stamp Paper of
Rs.300 and duly notarized.
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 57 -
Format for Bank Guarantee for Bid Security (EMD)
B.G. No. Dated:
1. In consideration of you, *****, having its office at *****, (hereinafter referred to as the
“Authority”, which expression shall unless it be repugnant to the subject or context
thereof include its, successors and assigns) having agreed to receive the Bid of
…………………… (a company registered under the Companies Act, 1956) and having
its registered office at……………………… (hereinafter referred to as the “Bidder”
which expression shall unless it be repugnant to the subject or context thereof include
its/their executors, administrators, successors and assigns), for the ***** Project on
basis (hereinafter referred to as “the Project”) pursuant to the Document dated
…………… issued in respect of the Project and other related documents including
without limitation the draft concession agreement (hereinafter collectively referred to
as “Bidding Documents”), we (Name of the Bank) having our registered office
at……………………… and one of its branches at …………………….. (hereinafter
referred to as the “Bank”), at the request of the Bidder, do hereby in terms of Clause
of the Tender Document, irrevocably, unconditionally and without reservation
guarantee the due and faithful fulfilment and compliance of the terms and conditions
of the Bidding Documents (including the entire tender Document) by the said Bidder
and unconditionally and irrevocably undertake to pay forthwith to the Authority an
amount of Rs. ***** (Rupees ***** only) (hereinafter referred to as the “Guarantee”) as
our primary obligation without any demur, reservation, recourse, contest or protest
and without reference to the Bidder if the Bidder shall fail to fulfil or comply with all
or any of the terms and conditions contained in the said Bidding Documents.
2. Any such written demand made by the Authority stating that the Bidder is in default
of the due and faithful fulfilment and compliance with the terms and conditions
contained in the Bidding Documents shall be final, conclusive and binding on the
3. We, the Bank, do hereby unconditionally undertake to pay the amounts due
and payable under this Guarantee without any demur, reservation, recourse, contest
or protest and without any reference to the Bidder or any other person and
irrespective of whether the claim of the Authority is disputed by the Bidder or not,
merely on the first demand from the Authority stating that the amount claimed is
due to the Authority by reason of failure of the Bidder to fulfil and comply with the
terms and conditions contained in the Bidding Bid Document ‐ for . . . . . . . . . . . .
including failure of the said Bidder to keep its Bid open during the Bid validity
period as set forth in the said Bidding Documents for any reason whatsoever. Any
such demand made on the Bank shall be conclusive as regards amount due and
payable by the Bank under this Guarantee. However, our liability under this
Guarantee shall be restricted to an amount not exceeding Rs. ***** (Rupees ***** only).
4. This Guarantee shall be irrevocable and remain in full force for a period of 180 (One
Hundred eighty days) days from the Bid Due Date inclusive of a claim period of
(sixty) days or for such extended period as may be mutually agreed between the
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 58 -
Authority and the Bidder, and agreed to by the Bank, and shall continue to be
enforceable till all amounts under this Guarantee have been paid.
5. We, the Bank, further agree that the Authority shall be the sole judge to decide as to
whether the Bidder is in default of due and faithful fulfilment and compliance with
the terms and conditions contained in the Bidding Documents including, inter alia,
the failure of the Bidder to keep its Bid open during the Bid validity period set forth
in the said Bidding Documents, and the decision of the Authority that the Bidder is in
default as aforesaid shall be final and binding on us, notwithstanding any differences
between the Authority and the Bidder or any dispute pending before any Court,
Tribunal, Arbitrator or any other Authority.
6. The Guarantee shall not be affected by any change in the constitution or winding up
of the Bidder or the Bank or any absorption, merger or amalgamation of the Bidder or
the Bank with any other person.
7. In order to give full effect to this Guarantee, the Authority shall be entitled to treat
the Bank as the principal debtor. The Authority shall have the fullest liberty without
affecting in any way the liability of the Bank under this Guarantee from time to time
to vary any of the terms and conditions contained in the said Bidding Documents or
to extend time for submission of the Bids or the Bid validity period or the period for
conveying acceptance of Letter of Award by the Bidder or the period for fulfilment
and compliance with all or any of the terms and conditions contained in the said
Bidding Documents by the said Bidder or to postpone for any time and from time to
time any of the powers exercisable by it against the said Bidder and either to enforce
or forbear from enforcing any of the terms and conditions contained in the said
Bidding Documents or the securities available to the Authority, and the Bank shall
not be released from its liability under these presents by any exercise by the
Authority of the liberty with reference to the matters aforesaid or by reason of time
being given to the said Bidder or any other forbearance, act or omission on the part of
the Authority or any indulgence by the Authority to the said Bidder or by any change
in the constitution of the Authority or its absorption, merger or amalgamation with
any other Bid Document‐ for . . . . . . . . . . . . . . . . . . . . . . . . ( N a me of
Ten der ) . . . . . . . . . . . . . . . . in the State of Gujarat person or any other matter
or thing whatsoever which under the law relating to sureties would but for this
provision have the effect of releasing the Bank from its such liability.
8. Any notice by way of request, demand or otherwise hereunder shall be sufficiently
given or made if addressed to the Bank and sent by courier or by registered mail to
the Bank at the address set forth herein.
9. We undertake to make the payment on receipt of your notice of claim on us
addressed to [name of Bank along with branch address] and delivered at our above
branch which shall be deemed to have been duly authorised to receive the said notice
10. It shall not be necessary for the Authority to proceed against the said Bidder before
proceeding against the Bank and the guarantee herein contained shall be enforceable
against the Bank, notwithstanding any other security which the Authority may have
obtained from the said Bidder or any other person and which shall, at the time when
proceedings are taken against the Bank hereunder, be outstanding or unrealised.
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 59 -
11. We, the Bank, further undertake not to revoke this Guarantee during its currency
except with the previous express consent of the Authority in writing.
12. The Bank declares that it has power to issue this Guarantee and discharge the
obligations contemplated herein, the undersigned is duly authorised and has full
power to execute this Guarantee for and on behalf of the Bank.
13. For the avoidance of doubt, the Bank’s liability under this Guarantee shall be
restricted to Rs. *** (Rupees ***** only). The Bank shall be liable to pay the said
amount or any part thereof only if the Authority serves a written claim on the Bank in
accordance with paragraph 9 hereof, on or before [*** (indicate date falling 180 days
after the Bid Due Date)].
Signed and Delivered by ………………………. Bank
By the hand of Mr./Ms. …………………….., its ………………….. and authorised official.
(Signature of the Authorised Signatory)
(Official Seal)
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 60 -
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 61 -
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 62 -
Tender No- 21 _ O & M of Heavy duty De-Watering Pump _ 2026-27 - 63 -
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No- 21_O and M of Heavy duty De-Watering Pump_2026-27.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].