Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹24.9 L+₹1.2 L (4.99%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MUHAMMED P A L2 | GEORGE K V L1 |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF SOAK PIT (27 NOS) | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 283.5 | cum | 313.78 ₹88,956.63 | 298.84 ₹84,721.14 Lowest |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 127.17 | cum | 112.4 ₹14,293.91 | 107.05 ₹13,613.55 Lowest |
| 1.00 | 6.1.1:Brick work with common burnt clay F.P.S (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) | 19.44 | cum | 7,930.11 ₹1,54,161.34 | 7,552.49 ₹1,46,820.41 Lowest |
| 1.00 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 6.62 | cum | 7,619.15 ₹50,400.68 | 7,256.34 ₹48,000.69 Lowest |
| 1.00 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 243 | sqm | 307.78 ₹74,790.54 | 293.13 ₹71,230.59 Lowest |
| 1.01 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size) | 46.15 | cum | 9,041.99 ₹4,17,260.71 | 8,611.42 ₹3,97,391.2 Lowest |
| 1.01 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 773.87 | sqm | 306.42 ₹2,37,129.86 | 291.83 ₹2,25,839.07 Lowest |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 16.34 | cum | 9,074.45 ₹1,48,276.51 | 8,642.34 ₹1,41,215.84 Lowest |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 47.69 | sqm | 354.91 ₹16,925.3 | 337.42 ₹16,091.22 Lowest |
Tender Value
₹23.8 L
EMD Value
₹35,750
Closing Date
10 Feb 2023, 6:00 pmClosed
SREEKANDAN.P.K
AE LID AND EW MEPPADI
soak pits
2023_LSGD_554086_9
e-tender 4
Open Tender
Civil Works - Others
Item Rate
90 days
Meppadi
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,950
Yes
₹35,750
Yes
14 Mar 2026
31 Jan 2023
13 Feb 2023
31 Jan 2023
10 Feb 2023
31 Jan 2023
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .