Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹81.3 L
EMD Value
₹50,000
Closing Date
30 Nov 2026, 3:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Assistant Executive Engineer
Office of the Assistant Executive Engineer, Substation Subdivision, Viyyur ,Thrissur-680010
Construction of RCC Power Cable Trench for laying 33kV and 11kV XLPE UG Cables at 110kV Substation Mannuthy
2026_KSEB_890561_1
03/2026-27/ AEE/SSSD /VYR dtd 19.11.2026
Open Tender
Civil Works - Others
Percentage
90 days
110kV Substation Mannuthy
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,900
₹50,000
19 Nov 2026
19 Nov 2026
2 Dec 2026
20 Nov 2026
30 Nov 2026
20 Nov 2026
20 Nov 2026 - 30 Nov 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including
dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 546 | m3 | 359.74 | ₹1,96,417.11 |
| 2 | Centering and shuttering including strutting,
propping etc. and removal of form work for:Foundations, footings, bases for columns | 56.5 | m2 | 386.16 | ₹21,817.94 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement :3 coarse sand : 6 graded stone aggregate 20 mmnominal size) | 48 | m3 | 8,569.15 | ₹4,11,319.18 |
| 4 | Steel reinforcement for R.C.C work including
straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo Mechanically Treated bars of
grade Fe-500D or more | 27,500 | kg | 112.43 | ₹30,91,698.5 |
| 5 | Centering and shuttering including strutting,
etc. and removal of form for:Walls (any thickness)including attached pilasters, butteresses, plinth and string courses etc | 1,817 | m2 | 839.62 | ₹15,25,581.55 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 275 | m3 | 10,488.77 | ₹28,84,412.99 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_1522713.xls
BOQ • 0.27 MB
BID.pdf
Tender Documents • 1.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .