| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹89,090Accepted-AOC HDM O O EXECUTIVE ENGINEER HSVP DIVISION SONIPAT | ₹89,090 | L1 | Accepted-AOC L1 |
| 2 | L2₹91,100+₹2,010 (2.26%)Rejected-AOC | ₹91,100+₹2,010 (2.26%) | L2 | Rejected-AOC L2 |
| 3 | L3₹95,350+₹6,260 (7.03%)Rejected-AOC | ₹95,350+₹6,260 (7.03%) | L3 | Rejected-AOC L3 |
| 4 | L4₹99,840+₹10,750 (12.1%)Rejected-AOC | ₹99,840+₹10,750 (12.1%) | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | Inder jeet L1 | M/s Jain Associates L2 | JAI BABA HARI DASS CONSTRUCTION COMPANY L3 | The Adarsh Haryana Coop Labouar and Construction Society Limited L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Supply of Earth including excavation in all kind of soil, carriage including loading unloading and laying earth as per levels and rates shall taken into accounts of all allowances for labour hardness lead, lead and lift, loading, unloading carriage and laying the same on the proposed site in 25 cm thick layer for compaction and dressing etc. as per Haryana PWD specification (Latest edition) including cost of rolling and watering and as per direction of Engineer-in-Charge complete in all respect and to the entire satisfaction of the Engineer-in-Charge. | 260 | Per Cum | - | - | - | - |
| 2.00 | Providing laying spreading and compacting hand broken/crushed stone aggregate, 250 thick Wet Mix Macadam confirming to physical requirement laid in table 400.10 of MORT & H of MORT & H specification in two layer compacted to 250 mm (125 mm + 125 mm) (by taking material 1.32 time of the thickness of the layer i.e. 1.65 cum per 10 sqm in each layer) including premixing pf material with water in mixing plant for Wet Mix Macadam, carriage of mixed material by mechanical paver suitable layer, rolling with road roller 8-10 tonne in stage to proper grade and any spot depressions which becomes and apparent corrected by removing or adding fresh material nad camber spreding and brooming including temple, barrier, lighting arrangement at night, chokidar & mtc. of diversion etc. complete in all respect as per clause 406 of MORT & H specification drawing & the instruction of Engineer In Charge, Density of WMM as laid 2.2 gms/cc comlete in all respect to the entire saisfaction. | 30 | Per Cum | - | - | - | - |
| 3.00 | Hiring charges of JCB including all charges i.e. pay of driver, fuel, mtc etc. complete in all respect as desired & directed by Engineer-in-Charge as per approved NIT | 17 | Per Hrs | - | - | - | - |
Tender Value
₹2,000
EMD Value
₹2,000
Closing Date
13 Nov 2018, 5:00 pmClosed
Pawan Kumar
Executive Engineer,HSVP RGEC Division Sonipat
Annual Mtc. Of 60 mtr. Wide road in RGEC Sonipat. Supply and laying of earth WMM and Hiring of JCB complete in all respect and all others works contingent thereto.
2018_HBC_71548_1
Job No. 524 (Re-Invite)
Open Tender
Civil Works
Works
270 days
HSVP Staff Colony Sector - 15
Please refer tender notice
2 documents required · 2 mandatory
₹250
Executive Engineer,HSVP RGEC Division Sonipat
₹2,000
30 Oct 2025
31 Oct 2018
15 Nov 2018
31 Oct 2018
13 Nov 2018
31 Oct 2018
Amount
Supply of Earth including excavation in all kind of soil, carriage including loading unloading and laying earth as per levels and rates shall taken into accounts of all allowances for labour hardness lead, lead and lift, loading, unloading carriage and laying the same on the proposed site in 25 cm thick layer for compaction and dressing etc. as per Haryana PWD specification (Latest edition) including cost of rolling and watering and as per direction of Engineer-in-Charge complete in all respect and to the entire satisfaction of the Engineer-in-Charge.
Providing laying spreading and compacting hand broken/crushed stone aggregate, 250 thick Wet Mix Macadam confirming to physical requirement laid in table 400.10 of MORT & H of MORT & H specification in two layer compacted to 250 mm (125 mm + 125 mm) (by taking material 1.32 time of the thickness of the layer i.e. 1.65 cum per 10 sqm in each layer) including premixing pf material with water in mixing plant for Wet Mix Macadam, carriage of mixed material by mechanical paver suitable layer, rolling with road roller 8-10 tonne in stage to proper grade and any spot depressions which becomes and apparent corrected by removing or adding fresh material nad camber spreding and brooming including temple, barrier, lighting arrangement at night, chokidar & mtc. of diversion etc. complete in all respect as per clause 406 of MORT & H specification drawing & the instruction of Engineer In Charge, Density of WMM as laid 2.2 gms/cc comlete in all respect to the entire saisfaction.
Hiring charges of JCB including all charges i.e. pay of driver, fuel, mtc etc. complete in all respect as desired & directed by Engineer-in-Charge as per approved NIT
M/s Jain Associates
JAI BABA HARI DASS CONSTRUCTION COMPANY
The Adarsh Haryana Coop Labouar and Construction Society Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .