| 1 | L1₹1.7 LAccepted-Finance ABC OF VIJAYPUR SECTION UNDER EDD BAGESHWAR | ₹1.7 L | L1 | Accepted-Finance lowest bidder |
| 2 | L2₹1.7 LAccepted-Finance MALLA NIGLAT POST BHOWALI DISTT NAINITAL | NAINITAL | UTTARAKHAND | 244715 | ₹1.7 L | L2 | Accepted-Finance second lowest bidder |
| 3 | L3₹2.1 LAccepted-Finance SHEESHMAHAL KATHGODAM ALMORA | ₹2.1 L | L3 | Accepted-Finance third lowest bidder |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical HOUSE NO F 452 3 LINE NO 09 RAJENDER NAGAR ROORKEE | HARIDWAR | UTTARAKHAND | 247656 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | MEHRA CONSTRUCTION AND SUPPLIERS L2 | J D M ENTERPRISES L3 | GURUKRIPA ENGINEERS AND CONTRACTORS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Forwarded and Back Cartage of material by road transport from Haldwani/Almora/Masi Store Centre to Dump Store Including Loading-Unloading (Average distance 80 Km.) | 1 | Trip | 8,100 ₹8,100 | 8,500 ₹8,500 | 7,950 ₹7,950 |
| 2.00 | Forward and Back Head Load Cartage of Poles Sp-10 From Road To Site 0 To 1 Km | 1 | Nos | 300 ₹300 | 350 ₹350 | 287 ₹287 |
| 3.00 | Forward and Back Head Load Cartage of Poles Sp-21/Sp-23From Road To Site 0 To 1 Km | 1 | Nos | 350 ₹350 | 450 ₹450 | 342 ₹342 |
| 4.00 | Forwarded and Back Head Load Cartage of Poles Sp-10 From Road To Site 1 To 3 Km | 1 | Nos | 600 ₹600 | 650 ₹650 | 576 ₹576 |
| 5.00 | Forwarded and Back Head Load Cartage of Poles Sp-21/Sp-23From Road To Site 1 To 3 Km | 1 | Nos | 650 ₹650 | 750 ₹750 | 637 ₹637 |
| 6.00 | Forwarded and Back Head Load Cartage of Small Materials Including Loading and Unloading 0 To 1 Km | 1 | Qtl | 350 ₹350 | 380 ₹380 | 338 ₹338 |
| 7.00 | Forwarded and Back Head Load Cartage of Small Materials Including Loading and Unloading 1 To 3 Km | 1 | Qtl | 600 ₹600 | 630 ₹630 | 597 ₹597 |
| 8.00Forwarded and Back Head Load Cartage of Tansformers Including Loading and Unloading on Both Points 0 To 1 Km | ||||||
| 8.01 | 25 KVA | 1 | Nos | 2,000 ₹2,000 | 2,300 ₹2,300 | 1,990 ₹1,990 |
| 8.02 | 63 KVA | 1 | Nos | 2,600 ₹2,600 | 2,700 ₹2,700 | 2,445 ₹2,445 |
Tender Value
₹5 L
EMD Value
₹15,000
Closing Date
22 Dec 2021, 3:00 pmClosed
Executive Engineer
Executive Engineer Electricity Distribution Division Ranikhet
Construction of line and substation for releasing connection to consumers under EDSD, Ranikhet as per Hn. UERC regulation.
2021_UPCL9_39144_1
EDD(R)-16/2021-22
Open Tender
Electrical Works
365 days
Ranikhet
As per Tender Document
2 documents required · 2 mandatory
₹295
Executive Engineer
₹15,000
Yes
22 Jun 2026
2 Dec 2021
23 Dec 2021
2 Dec 2021
22 Dec 2021
2 Dec 2021
Amount
Forwarded and Back Cartage of material by road transport from Haldwani/Almora/Masi Store Centre to Dump Store Including Loading-Unloading (Average distance 80 Km.)
Forward and Back Head Load Cartage of Poles Sp-10 From Road To Site 0 To 1 Km
Forward and Back Head Load Cartage of Poles Sp-21/Sp-23From Road To Site 0 To 1 Km
Forwarded and Back Head Load Cartage of Poles Sp-10 From Road To Site 1 To 3 Km
Forwarded and Back Head Load Cartage of Poles Sp-21/Sp-23From Road To Site 1 To 3 Km
Forwarded and Back Head Load Cartage of Small Materials Including Loading and Unloading 0 To 1 Km
Forwarded and Back Head Load Cartage of Small Materials Including Loading and Unloading 1 To 3 Km
Forwarded and Back Head Load Cartage of Tansformers Including Loading and Unloading on Both Points 0 To 1 Km
Forwarded and Back Head Load Cartage of Tansformers Including Loading and Unloading on Both Points 1 To 3 Km
Excavation of Foundation Pit for erection of poles in all type of soil and fixing all accessaries of pole and erection of support and grouting of pole in CC 1:4:8 block including cost of Ballast, Sand and Cement Back Filling of soil and Boulders in pit and proper alignment leveling as per RESPO Construuction Manual.
SP-10Single Pole Support
SP-21Single Pole Support
SP-23 Single Pole Support
SP-23 Double Pole Support
SP-23 Four Pole Support
Muffing of poles with cc 1:3:6 Block and 45 cm in Above Ground Level including cost of Ballast, Sand and cement etc.
Fabrication of MS Channel angle iron after cutting in required size with drilling of holes upto good finish of top channel, bracing and special type brackets etc. as per RESPO Drawing and local approved drawings.
Erection with digging of pits for stay as per RESPO manual in all type of soil, grouting of stay rod with cc 1:4:8 cement block including cost of Ballast, sand and cement, Back filling of soil and Boulders in the pit and ramming Nozzlling and fixing of stay wire with pole and stay rod as per drawing.
Erection and earthing of support with MS earth rod of 2500 mm long including excavation pit and digging of MS Rod to proper depth and connecting the earth electrod with the help of GI Wire as per RESPO
Laying, Spreading, Sagging and stringing of 11 KV line in 3 Phase (3 Phase 4 wire) of the following wire with GI/weassel earth wire complete including fixing of all accesaries in 3 Nos conductors in Parallel with binding and jumpring as per profile and sagging chart.
ACSR Weassel
ACSR Rabbit
Laying, Spreading, Sagging and stringing of LT line of the following wire with GI earth wire complete including binding Jumpering as per RESPO.
ACSR Weassel
3 Phase 5 Wire Length
3 Phase 4 Wire Length
2 Phase 3 Wire Length
1 Phase 2 Wire Length
ACSR Weassel
3 Phase 5 Wire Length
3 Phase 4 Wire Length
2 Phase 3 Wire Length
1 Phase 2 Wire Length
Gaurding of Line Over ( Telephone/ Road/LT Line Crossing as per Drawing with 6/8 SWG GI Wireincluding fixing of Gaurding Channel/angle as per RESPO LT/11 KV Line.
Laying and Erection of LT PVC Cable Including Crimping of Lugs. 4X70, 150 and 240
Mounting and Fixing of TPMO and Fuse Set on Double Pole Structure Including making of connections and complete work
Mounting and Fixing of LA Set (3Nos.) onDouble Pole Structure Including making of connections and complete work
Installation and mounting of Distribution transformer on Double Pole Structure and fixing of channel angle etc. and making all connections of HT and LT side and its complete commissioning.
Painting of Poles with angle and channels and all steel part by one coat of red Oxide Primer and two coats of Alluminium Paint and two Strip of Flouroscent alternate red and White Paint 30 cm Wide upto 1.5 Mtr From Groung Level.
SP-10Single Pole Support
SP-21Single Pole Support
SP-23 Single Pole Support
Route Clearance By Cutting of Tree Branches Lopping and Chopping of trees for LT and 11 KV Lines.
T-Off Connection Complete 11 KV
Installation of 11 KV Metering Cubical in the Metering Room with grouting in CC 1:4:8 as per RESPO.
Making of Connections on both Sides in Metering Cubical including Tapping.
Loading and unloading Carriage of LT PRMC from Store to Pit Site and installation on Double Pole with the help of Nut and Bolt and clamp and making to pass LT Cable from Transformer to PRMC.
MEHRA CONSTRUCTION AND SUPPLIERS
J D M ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid