| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.8 CrAccepted-AOC 1 128 A SECOND FLOOR MOHAMMADPUR NEAR BHIKAJCAMA PLACE NEW DELHI 110066 | NEW DELHI | NEW DELHI | DELHI | 110066 | ₹1.8 Cr | L-1 | Accepted-AOC Being lowest bidder |
| 2 | L-2₹1.9 Cr+₹12.2 L (6.72%)Rejected-Finance III 6 7 2ND FLOOR ABOVE BANK OF BARODA GOPINATH BAZAR DELHI CANTT 110 010 | DELHI CANTT | NEW DELHI | DELHI | 110010 | ₹1.9 Cr+₹12.2 L (6.72%) | L-2 | Rejected-Finance Not being lowest bidder |
| 3 | L-3₹2.0 Cr+₹17.2 L (9.42%)Rejected-Finance | ₹2.0 Cr+₹17.2 L (9.42%) | L-3 | Rejected-Finance Not being lowest bidder |
| 4 | L-4₹2.1 Cr+₹26.8 L (14.7%)Rejected-Finance | ₹2.1 Cr+₹26.8 L (14.7%) | L-4 | Rejected-Finance Not being lowest bidder |
| 5 | Rejected-Technical 1 225 5 6 SADAR BAZAR DELHI CANTT 110010 | NEW DELHI | DELHI | 110010 | - | - | Rejected-Technical Not enlisted in appropriate category i.e. c(ii) |
Tender Value
₹2.2 Cr
EMD Value
₹2.9 L
Closing Date
13 May 2023, 6:00 pmClosed
CE RnD Delhi
HQ CE RND Delhi, Probyn road, Timarpur, Delhi-110054
SPECIAL REPAIR FOR REPLACEMENT OF BER LIFTS AND HYDRA GOODS ELEVATORS AT DEAL AND IRDE COMPLEX UNDER GE (I) RnD DEHRADUN
2023_MES_586728_1
CE RND/DLI-28/DDN/2022-23
Open Tender
Civil Works
Item Rate
365 days
Dehradun
Please refer tender documents
8 documents required · 8 mandatory
₹2,000
GE I RND Dehradun
₹2.9 L
Yes
26 Jun 2023
23 Mar 2023
19 May 2023
23 Mar 2023
13 May 2023
29 Apr 2023
Amount
1. Lift shall be completed with and including following Technical Specifications:- (i) Lift car speed 1.0 m/s (ii) Machine: Gearless Machine (Permanent Magnet) with electric operated single speed motor on power supply 415 Volts, 3 Phase, 50 Hz. (iii) Car door:- 2 panel automatic centre opening door with ACVF drive in stainless steel (iv) Landing door:- 2 panel automatic centre opening door in stainless steel (v) Double button with 6 segment digital LED display at all floors. (vi) Car operating panel with micro stroke push button with 6 segment digital car position indicator, car direction indicator. (vii) The safety controls and indicator shall be as per standard practice and based on infra red sensors. (viii) The testing of lift with 25 % excess load shall be conducted as per para 25 of IS 4666-2000 as amended to date. The arrangement for testing load for testing and instrument required shall be arranged by contractor. (ix) Fireman’s switch provided at main lobby. (x) Battery operated alarm bell and emergency light with battery. (xi) Lift announcer. (xii) Adjustable door open time (xiii) Provision of cross flow rectangular (low noise/mildair flow) fan – 01 (xiv) S & F Decorative spot round shape LED light (xvi) Door open and door close buttons in car operating panel (xvii) Intercom (xviii) Jammed landing operating panel call button by-pass (xix) Phase failure and phase reversal protection (xx) Motor overheat protection (xxi) Overload function with audio-visual indication in car operating panel (xxii) 5/15 A power socket & light point at every floor level in the hoist way. (xxiii) MS Ladder (xxiv) 3 Phase supply & earthing from machine room to all equipment. (xxv) Firemen emergeny return (xxvi) The words "FIRE LIFT" and "IN CASE OF FIRE ONLY FIREMAN SHALL OPERATE THE FIRE LIFT" shall be pasted in bold letters on PVC sheets at all floor levels.
2. Other standerd safety device features required (a) Multi beam full length criss crossing each other infrared door sensor (minimum of 154) (b) Emergency landing device ELD (ARD) (c) Extra cores in travelling cable for customer smoke detectors.- 02 Cores (d) Background music speakers (e) Digital direction and position indicator in car and at all landings. (f) Emergency alarm at the main landing with alarm bell button in car (g) 2 Phase/ 2 way fire man drive, fire man switch at the main landing. (In case fire man drive is activated the lift will come to the main landing and open the door) (h) Advance door operation (To ensure smooth opening and closing of the doors at adjustable door speed) (j) Load weighing device (Audio visual overload indicator in the car for better safety) (k) Over speed governor (Electro mechanical device that prevent free fall in case the elevator is travelling at speed more than 10% of the rated speed in downward direction) (l) special car door lock, automatic daily brake testing, latest technology motor-PMS touch panel with LED display (m) Mechanical rescue device with no dependence with battery (n) Door time protection with extra door time for lobby and parking , auto fan cut off (o) Controller shall be include protection against over current, over voltage, single phasing, phase reversal, earth leakage and interlocking with door opening, closing and moment of lift and any other operation required for the safety of passenger as per fire safety regulation pertaining to lift (p) Stainless steel hand rail all three walls of car (q) Key locking system D-type
Note:- (i) Contractor to submit detailed construction drawings of lifts being provided with complete technical specifications as per IS:14665 before dispatch of material from OEM for approval of GE (ii) The lift shall be installed in replacement in existing lift well therefore contractor is advised to visit site for the size of car door, floor travelling height and left hand/right hand side wall space, existing head room height and pit size before quoting the rates. (iii) The scope of work also covered the civil work comprising cutting of holes and making good the surfaces, car and counter weight, guid rails and bracket , terminals buffers supports and sill angle, plates and any other items required for successful completion of lift with respect to safely required by the OEM, will be carried out by the contractor without any extra cost. (iv) The contractor shall be responsible for 2 years defect liability period from certified date of completion of GE. During the said defect liability period the lift shall be kept functional/serviceable all the time & all consumable items shall be provided by contractor for operation & maintenance of lift. All periodical maintenance regular check up/inspection should be carried out by OEM during 02 years defect liability period in addition to regular checkups and periodical services special visit/inspection will also be carried to rectify defects by representative of OEM if any emergency / trouble developed. An agreement will be made between contractor & OEM and this shall be submitted to GE on the date of handing over to lift (date of completion) for the comprehensive maintenance of defect liability period. The cost of above shall be deemed to be included in the quoted rates. (v) The provision of suitable steel structure/platform for installation of lifts equipment is part of lift items and nothing extra should be paid (vi) If any clearance required to be sought from state govt. i.e. from lift inspector or electrical safety department or fire safety department is the contractor's responsibility & any expenditure on this account shall be deemed to be included in the quoted unit rates.
1. Lift shall be completed with and including following Technical Specifications:- (i) Lift car speed 1.0 m/s (ii) Machine: Gearless Machine (Permanent Magnet) with electric operated single speed motor on power supply 415 Volts, 3 Phase, 50 Hz. (iii) Car door:- 2 panel automatic centre opening door with ACVF drive in stainless steel (iv) Landing door:- 2 panel automatic centre opening door in stainless steel (v) Double button with 5 segment digital LED display at all floors. (vi) Car operating panel with micro stroke push button with 5 segment digital car position indicator, car direction indicator. (vii) The safety controls and indicator shall be as per standard practice and based on infra red sensors. (viii) The testing of lift with 25 % excess load shall be conducted as per para 25 of IS 4666-2000 as amended to date. The arrangement for testing load for testing and instrument required shall be arranged by contractor. (ix) Fireman’s switch provided at main lobby. (x) Battery operated alarm bell and emergency light with battery. (xi) Lift announcer. (xii) Adjustable door open time (xiii) Provision of cross flow rectangular (low noise/mildair flow) fan – 01 (xiv) S & F Decorative spot round shape LED light (xvi) Door open and door close buttons in car operating panel (xvii) Intercom (xviii) Jammed landing operating panel call button by-pass (xix) Phase failure and phase reversal protection (xx) Motor overheat protection (xxi) Overload function with audio-visual indication in car operating panel (xxii) 5/15 A power socket & light point at every floor level in the hoist way. (xxiii) MS Ladder (xxiv) 3 Phase supply & earthing from machine room to all equipment. (xxv) Firemen emergeny return (xxvi) The words "FIRE LIFT" and "IN CASE OF FIRE ONLY FIREMAN SHALL OPERATE THE FIRE LIFT" shall be pasted in bold letters on PVC sheets at all floor levels.
2. Other standerd safety device features required (a) Multi beam full length criss crossing each other infrared door sensor (minimum of 154) (b) Emergency landing device ELD (ARD) (c) Extra cores in travelling cable for customer smoke detectors.- 02 Cores (d) Background music speakers (e) Digital direction and position indicator in car and at all landings. (f) Emergency alarm at the main landing with alarm bell button in car (g) 2 Phase/ 2 way fire man drive, fire man switch at the main landing. (In case fire man drive is activated the lift will come to the main landing and open the door) (h) Advance door operation (To ensure smooth opening and closing of the doors at adjustable door speed) (j) Load weighing device (Audio visual overload indicator in the car for better safety) (k) Over speed governor (Electro mechanical device that prevent free fall in case the elevator is travelling at speed more than 10% of the rated speed in downward direction) (l) special car door lock, automatic daily brake testing, latest technology motor-PMS touch panel with LED display (m) Mechanical rescue device with no dependence with battery (n) Door time protection with extra door time for lobby and parking , auto fan cut off (o) Controller shall be include protection against over current, over voltage, single phasing, phase reversal, earth leakage and interlocking with door opening, closing and moment of lift and any other operation required for the safety of passenger as per fire safety regulation pertaining to lift (p) Stainless steel hand rail all three walls of car (q) Key locking system D-type
Note:- (i) Contractor to submit detailed construction drawings of lifts being provided with complete technical specifications as per IS:14665 before dispatch of material from OEM for approval of GE (ii) The lift shall be installed in replacement in existing lift well therefore contractor is advised to visit site for the size of car door, floor travelling height and left hand/right hand side wall space, existing head room height and pit size before quoting the rates. (iii) The scope of work also covered the civil work comprising cutting of holes and making good the surfaces, car and counter weight, guid rails and bracket , terminals buffers supports and sill angle, plates and any other items required for successful completion of lift with respect to safely required by the OEM, will be carried out by the contractor without any extra cost. (iv) The contractor shall be responsible for 2 years defect liability period from certified date of completion of GE. During the said defect liability period the lift shall be kept functional/serviceable all the time & all consumable items shall be provided by contractor for operation & maintenance of lift. All periodical maintenance regular check up/inspection should be carried out by OEM during 02 years defect liability period in addition to regular checkups and periodical services special visit/inspection will also be carried to rectify defects by representative of OEM if any emergency / trouble developed. An agreement will be made between contractor & OEM and this shall be submitted to GE on the date of handing over to lift (date of completion) for the comprehensive maintenance of defect liability period. The cost of above shall be deemed to be included in the quoted rates. (v) The provision of suitable steel structure/platform for installation of lifts equipment is part of lift items and nothing extra should be paid (vi) If any clearance required to be sought from state govt. i.e. from lift inspector or electrical safety department or fire safety department is the contractor's responsibility & any expenditure on this account shall be deemed to be included in the quoted unit rates.
1. Lift shall be completed with and including following Technical Specifications:- (i) Lift car speed 1.5 m/s (ii) Machine: Gearless Machine (Permanent Magnet) with electric operated single speed motor on power supply 415 Volts, 3 Phase, 50 Hz. (iii) Car door:- 2 panel automatic centre opening door with ACVF drive in stainless steel (iv) Landing door:- 2 panel automatic centre opening door in stainless steel (v) Double button with 6 segment digital LED display at all floors. (vi) Car operating panel with micro stroke push button with 6 segment digital car position indicator, car direction indicator. (vii) The safety controls and indicator shall be as per standard practice and based on infra red sensors. (viii) The testing of lift with 25 % excess load shall be conducted as per para 25 of IS 4666-2000 as amended to date. The arrangement for testing load for testing and instrument required shall be arranged by contractor. (ix) Fireman’s switch provided at main lobby. (x) Battery operated alarm bell and emergency light with battery. (xi) Lift announcer. (xii) Adjustable door open time (xiii) Provision of cross flow rectangular (low noise/mildair flow) fan – 01 (xiv) S & F Decorative spot round shape LED light (xvi) Door open and door close buttons in car operating panel (xvii) Intercom (xviii) Jammed landing operating panel call button by-pass (xix) Phase failure and phase reversal protection (xx) Motor overheat protection (xxi) Overload function with audio-visual indication in car operating panel (xxii) 5/15 A power socket & light point at every floor level in the hoist way. (xxiii) MS Ladder (xxiv) 3 Phase supply & earthing from machine room to all equipment. (xxv) Firemen emergeny return (xxvi) The words "FIRE LIFT" and "IN CASE OF FIRE ONLY FIREMAN SHALL OPERATE THE FIRE LIFT" shall be pasted in bold letters on PVC sheets at all floor levels.
2. Other standerd safety device features required (a) Multi beam full length criss crossing each other infrared door sensor (minimum of 154) (b) Emergency landing device ELD (ARD) (c) Extra cores in travelling cable for customer smoke detectors.- 02 Cores (d) Background music speakers (e) Digital direction and posistion indicator in car and at all landings. (f) Emergency alarm at the main landing with alarm bell button in car (g) 2 Phase/ 2 way fire man drive, fire man switch at the main landing. (In case fire man drive is activated the lift will come to the main landing and open the door) (h) Advance door operation (To ensure smooth opening and closing of the doors at adjustable door speed) (j) Load weighing device (Audio visual overload indicator in the car for better safety) (k) Over speed governor (Electro mechanical device that prevent free fall in case the elevator is travelling at speed more than 10% of the rated speed in downward direction) (l) special car door lock, automatic daily brake testing, latest technology motor-PMS touch panel with LED display (m) Mechanical rescue device with no dependence with battery (n) Door time protection with extra door time for lobby and parking , auto fan cut off (o) Controller shall be include protection against over current, over voltage, single phasing, phase reversal, earth leakage and interlocking with door opening, closing and moment of lift and any other operation required for the safety of passenger as per fire safety regulation pertaining to lift (p) Stainless steel hand rail all three walls of car (q) Key locking system D-type
Note:- (i) Contractor to submit detailed construction drawings of lifts being provided with complete technical specifications as per IS:14665 before dispatch of material from OEM for approval of GE (ii) The lift shall be installed in replacement in existing lift well therefore contractor is advised to visit site for the size of car door, floor travelling height and left hand/right hand side wall space, existing head room height and pit size before quoting the rates. (iii) The scope of work also covered the civil work comprising cutting of holes and making good the surfaces, car and counter weight, guid rails and bracket , terminals buffers supports and sill angle, plates and any other items required for successful completion of lift with respect to safely required by the OEM, will be carried out by the contractor without any extra cost. (iv) The contractor shall be responsible for 2 years defect liability period from certified date of completion of GE. During the said defect liability period the lift shall be kept functional/serviceable all the time & all consumable items shall be provided by contractor for operation & maintenance of lift. All periodical maintenance regular check up/inspection should be carried out by OEM during 02 years defect liability period in addition to regular checkups and periodical services special visit/inspection will also be carried to rectify defects by representative of OEM if any emergency / trouble developed. An agreement will be made between contractor & OEM and this shall be submitted to GE on the date of handing over to lift (date of completion) for the comprehensive maintenance of defect liability period. The cost of above shall be deemed to be included in the quoted rates. (v) The provision of suitable steel structure/platform for installation of lifts equipment is part of lift items and nothing extra should be paid (vi) If any clearance required to be sought from state govt. i.e. from lift inspector or electrical safety department or fire safety department is the contractor's responsibility & any expenditure on this account shall be deemed to be included in the quoted unit rates.
1. Lift shall be completed with and including following Technical Specifications:- (i) Lift car speed 1.5 m/s (ii) Machine: Gearless Machine (Permanent Magnet) with electric operated single speed motor on power supply 415 Volts, 3 Phase, 50 Hz. (iii) Car door:- 2 panel automatic centre opening door with ACVF drive in stainless steel (iv) Landing door:- 2 panel automatic centre opening door in stainless steel (v) Double button with 5 segment digital LED display at all floors. (vi) Car operating panel with micro stroke push button with 5 segment digital car position indicator, car direction indicator. (vii) The safety controls and indicator shall be as per standard practice and based on infra red sensors. (viii) The testing of lift with 25 % excess load shall be conducted as per para 25 of IS 4666-2000 as amended to date. The arrangement for testing load for testing and instrument required shall be arranged by contractor. (ix) Fireman’s switch provided at main lobby. (x) Battery operated alarm bell and emergency light with battery. (xi) Lift announcer. (xii) Adjustable door open time (xiii) Provision of cross flow rectangular (low noise/mildair flow) fan – 01 (xiv) S & F Decorative spot round shape LED light (xvi) Door open and door close buttons in car operating panel (xvii) Intercom (xviii) Jammed landing operating panel call button by-pass (xix) Phase failure and phase reversal protection (xx) Motor overheat protection (xxi) Overload function with audio-visual indication in car operating panel (xxii) 5/15 A power socket & light point at every floor level in the hoist way. (xxiii) MS Ladder (xxiv) 3 Phase supply & earthing from machine room to all equipment. (xxv) Firemen emergeny return (xxvi) The words "FIRE LIFT" and "IN CASE OF FIRE ONLY FIREMAN SHALL OPERATE THE FIRE LIFT" shall be pasted in bold letters on PVC sheets at all floor levels.
2. Other standerd safety device features required (a) Multi beam full length criss crossing each other infrared door sensor (minimum of 154) (b) Emergency landing device ELD (ARD) (c) Extra cores in travelling cable for customer smoke detectors.- 02 Cores (d) Background music speakers (e) Digital direction and posistion indicator in car and at all landings. (f) Emergency alarm at the main landing with alarm bell button in car (g) 2 Phase/ 2 way fire man drive, fire man switch at the main landing. (In case fire man drive is activated the lift will come to the main landing and open the door) (h) Advance door operation (To ensure smooth opening and closing of the doors at adjustable door speed) (j) Load weighing device (Audio visual overload indicator in the car for better safety) (k) Over speed governor (Electro mechanical device that prevent free fall in case the elevator is travelling at speed more than 10% of the rated speed in downward direction) (l) special car door lock, automatic dailly brake testing, latest technology motor-PMS touch panel with LED display (m) Mechanical rescue device with no dependence with battery (n) Door time protection with extra door time for lobby and parking , auto fan cut off (o) Controller shall be include protection against over current, over voltage, single phasing, phase reversal, earth leakage and interlocking with door opening, closing and moment of lift and any other operation required for the safety of passenger as per fire safety regulation pertaining to lift (p) Stainless steel hand rail all three walls of car (q) Key locking system D-type
Note:- (i) Contractor to submit detailed construction drawings of lifts being provided with complete technical specifications as per IS:14665 before dispatch of material from OEM for approval of GE (ii) The lift shall be installed in replacement in existing lift well therefore contractor is advised to visit site for the size of car door, floor travelling height and left hand/right hand side wall space, existing head room height and pit size before quoting the rates. (iii) The scope of work also covered the civil work comprising cutting of holes and making good the surfaces, car and counter weight, guid rails and bracket , terminals buffers supports and sill angle, plates and any other items required for successful completion of lift with respect to safely required by the OEM, will be carried out by the contractor without any extra cost. (iv) The contractor shall be responsible for 2 years defect liability period from certified date of completion of GE. During the said defect liability period the lift shall be kept functional/serviceable all the time & all consumable items shall be provided by contractor for operation & maintenance of lift. All periodical maintenance regular check up/inspection should be carried out OEM during 02 years defect liability period in addition to regular checkups and periodical services special visit/inspection will also be carried to rectify defects by representative of OEM if any emergency / trouble developed. An agreement will be made between contractor & OEM and this shall be submitted to GE on the date of handing over to lift (date of completion) for the comprehensive maintenance of defect liability period. The cost of above shall be deemed to be included in the quoted rates. (v) The provision of suitable steel structure/platform for installation of lifts equipment is part of lift items and nothing extra should be paid (vi) If any clearance required to be sought from state govt. i.e. from lift inspector or electrical safety department or fire safety department is the contractor's responsibility & any expenditure on this account shall be deemed to be included in the quoted unit rates.
Supplying, installation, testing and commissioning of fire resistant hydra Goods cum passenger Elevators of capacity 544 kgs/08 passenger with minimum rated speed of 0.63 metre per second, electrically operated at 415 Volts 50 hz complete with power driven automatic steel sliding door with 2 hr. fire rating. hairline finished stainless steel enclosures. "Civil Requirements:- (a) Shaft Size- 1.98 mtr (Wide) X 1.51 mtr (Depth) (b) Pit Depth - 0.13 mtr (c) Opening Position- Same side "Lift Specifications:- (a) Stops and Openings - 02 (Basement + Ground floor) (b) No of Fire resistant door - 02 (One on car & one on each floor) (c) Wall Panel- Stainless steel (Hairline finish) (d) Ceiling- S S finish (c) Capacity - 544 Kgs (d) Control - By push button station (e) Lifting Speed - 0.63 m/s (f) Lowering Speed - Variable (g) Power Supply - 415 Volts, 3 Phase with Neutral (h) Limit Switch - Adjustable for positive stop" "Other standerd safety device features required (a) Multi beam full length criss crossing each other infrared door sensor" (b) Emergency landing device ELD (ARD) (e) Digital direction and posistion indicator in car and at all landings. (f) Emergency alarm at the main landing with alarm bell button in car (g) 2 Phase/ 2 way fire man drive, fire man switch at the main landing. (In case fire man drive is activated the lift will come to the main landing and open the door) (h) Advance door operation (To ensure smooth opening and closing of the doors at adjustable door speed) (o) Controller shall be include protection against over current, over voltage, single phasing, phase reversal, earth leakage and interlocking with door opening, closing and moment of lift and any other operation required for the safety of passenger as per fire safety regulation pertaining to lift (p) Stainless steel hand rail on rear side of car (q) Key locking system D-type
Safety - All the doors will be fitted with safety switches to ensure that all the doors are closed before operating the lift. The testing of lift with 25 % excess load shall be conducted as per para 25 of IS 4666-2000 as amended to date. The arrangement for testing load for testing and instrument required shall be arranged by contractor. Note:- (i) Contractor to submit detailed construction drawings of lifts being provided with complete technical specifications as per IS:14665 before dispatch of material from OEM for approval of GE (ii) The lift shall be installed in replacement in existing lift well therefore contractor is advised to visit site for the size of car door, floor travelling height and left hand/right hand side wall space, existing head room height and pit size before quoting the rates. (iii) The scope of work also covered the civil work comprising cutting of holes and making good the surfaces, car and counter weight, guid rails and bracket , terminals buffers supports and sill angle, plates and any other items required for successful completion of lift with respect to safely required by the OEM, will be carried out by the contractor without any extra cost. (iv) The contractor shall be responsible for 2 years defect liability period from certified date of completion of GE. During the said defect liability period the lift shall be kept functional/serviceable all the time & all consumable items shall be provided by contractor for operation & maintenance of lift. All periodical maintenance regular check up/inspection should be carried out by OEM during 02 years defect liability period in addition to regular checkups and periodical services special visit/inspection will also be carried to rectify defects by representative of OEM if any emergency / trouble developed. An agreement will be made between contractor & OEM and this shall be submitted to GE on the date of handing over to lift (date of completion) for the comprehensive maintenance of defect liability period. The cost of above shall be deemed to be included in the quoted rates. (v) The provision of suitable steel structure/platform for installation of lifts equipment is part of lift items and nothing extra should be paid (vi) If any clearance required to be sought from state govt. i.e. from lift inspector or electrical safety department or fire safety department is the contractor's responsibility & any expenditure on this account shall be deemed to be included in the quoted unit rates.
M&L for earthing complete with copper earth plate electrode of size 60cmX60cmX3 mm buried directly in ground vertically at a depth not less than 2.25 metre below normal ground level with top edge of earth plate at a depth not less than 1.5 metre below normal ground level surrounded from all sides by 15 cm thick and packed layer of charcoal dust and common salt filling in alternate layers etc and connected to and including copper strip of size 20x3 mm up to 7.5 mtr by means of bolts, nuts, check nuts and washers made of brass and protected by light grade GI pipe 40mm dia upto 2.7 mtr long GI pipe and connected to main control board and GI pipe light grade 20mm bore for watering and including funnel, wire mesh, RCC pit cover 50mm thick and PCC chamber pit with PCC 1:2:4 type C2 (including excavation and earth work disposal of surplus soil to a distance not exceeding 50 metre) and testing after completion all as specified complete.
M&L for earthing complete with GI earth plate electrode of size 60cmX60cmX6 mm buried directly in ground vertically at a depth not less than 2.25 metre below normal ground level with top edge of earth plate at a depth not less than 1.5 metre below normal ground level surrounded from all sides by 15 cm thick and packed layer of charcoal dust and common salt filling in alternate layers etc and connected to and including GI wire of size 4.0 mm dia up to 7.5 mtr by means of bolts, nuts, check nuts and washers made of brass and protected by light grade 20mm dia upto 2.7 mtr long GI pipe and connected to main control board and GI pipe light grade 20mm bore for watering and including funnel, wire mesh, RCC pit cover 50mm thick and PCC chamber pit with PCC 1:2:4 type C2 (including excavation and earth work disposal of surplus soil to a distance not exceeding 50 metre) and testing after completion all as specified complete. Notes for srl item No. 6 & 7 1.The rates for earthing under items includes the cost of followings: (a) Earth electrode. "(b) Main earthing lead from earth electrode to test point upto 7.5 metre" "(c) Material and labour for connecting earth electrode and earthing lead as specified." (d) Adequate quantity of charcoal dust and common salt. e) All labour involved including testing of earth net work. (f) Excavation and earth work or drilling hole for electrode. (g) P.C.C. pit and C.I. cover (h) Funnel with watering pipe, wire mesh and copper lugs etc. as specified. (j) G.I. protection pipe of size ordered specified for protection of earthing lead from mechanical injury or tempering. (k) Test point and extra length of main earthing lead beyond 7.5 metres (l) Connecting lead from test point to main switch or switch board or equipment to be earthed. 2.On testing after completion if the desired earth resistance is not obtained the earthing will be redone at no extra cost."
M&L for providing and fixing 25mm x 5 mm copper strip complete with saddles and fixing screw with gun metal or phosphorus bronze insulators on surface or in recess for connection etc as required
Dismantling of Old unserviceable lift complete with panel board by disconnecting electrical connection etc including all accessories and depositing the same in MES store yard.
MB Enterprises
CH. Ram Chander
M/S BALAJI ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .