| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Fee/PreQual/Technical/Finance | -30.03% | ₹2.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.5 L+₹11,960.41 (5.05%)Admitted-Fee/PreQual/Technical/Finance | -26.50% | ₹2.5 L+₹11,960.41 (5.05%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.9 L+₹50,924.91 (21.5%)Admitted-Fee/PreQual/Technical/Finance | -15.00% | ₹2.9 L+₹50,924.91 (21.5%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Affidavit not uploaded |
Tender Value
₹4 L
EMD Value
₹8,000
Closing Date
2 Apr 2026, 4:30 pmClosed
Executive Engineer PMGSY Division Baramulla
Executive Engineer PMGSY Division Baramulla
Permanent Restoration of road from T03 Potkhah Km 42nd of Srinagar Baramulla Uri NHWay to Mangam_Package No. JK03 2016
2026_KSRRD_146993_2
33/EE/PMGSY/Bla-e-Tendering of 2025-26
Open Tender
CIVIL
Percentage
30 days
Baramulla
Please refer Tender documents.
9 documents required · 9 mandatory
₹200
Executive Engineer PMGSY Division Baramulla
₹8,000
20 Apr 2026
14 Mar 2026
3 Apr 2026
14 Mar 2026
2 Apr 2026
14 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PCC Drain | - | - | - | - |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil | 22.95 | cum | 225.21 | ₹5,168.57 |
| 3 | Type B (First class bedding) Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii) including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) | 5.1 | cum | 1,532.48 | ₹7,815.65 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) M-10 grade including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) | 3.83 | cum | 5,505.61 | ₹21,086.49 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) M-15 grade including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) | 13.77 | cum | 6,273.25 | ₹86,382.65 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) | 61.2 | Sqm | 251.07 | ₹15,365.48 |
| 7 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate. including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) | 20.4 | Sqm | 517.6 | ₹10,559.04 |
| 8 | PCC Edge Wall | - | - | - | - |
| 9 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil | 8.8 | cum | 225.21 | ₹1,981.85 |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) M-15 grade including cost and carriage of all materials from approved source to site of work, with all leads, lifts, loading, unloading, stacking and octori.(Finished work to be measured, complete) | 28.6 | cum | 6,273.25 | ₹1,79,414.95 |
stage.html
html • 0.02 MB
finance_228044.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_228044.xls
BOQ • 0.33 MB
corrigendum33.pdf
PDF • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .