| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹73.9 LAccepted-AOC 601 6TH FLOOR BLDG NO 9 GIGAPLEX PLOT NO IT 5 MIDC TTC INDS AREA AIROLI WEST THANE MAHARASHTRA 400708 | THANE | MAHARASHTRA | 400708 | ₹73.9 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹99.2 L+₹25.3 L (34.3%)Rejected-AOC 5 A 5TH FLOOR NEPTUNE TOWER PRODUCTIVITY ROAD ALKAPURI VADODARA GUJARAT 390007 UDYAM GJ 24 0001307 | VADODARA | GUJARAT | 390007 | ₹99.2 L+₹25.3 L (34.3%) | L2 | Rejected-AOC Being L2 |
Tender Value
Refer Docs
Closing Date
1 Feb 2022, 3:00 pmClosed
Head Procurement
ONGC Mangalore Petrochemicals Ltd Mangalore Special Economic Zone Permude Village-574509
carrying out various specialized shutdown jobs in block-1 at OMPL
2022_OMPL_102703_1
1050L22013
Limited
Miscellaneous Services
Works
180 days
OMPL Mangalore
As per tender document
4 documents required · 4 mandatory
₹0
Exempted
9 Feb 2022
21 Jan 2022
2 Feb 2022
21 Jan 2022
1 Feb 2022
21 Jan 2022
Amount
Item details
Unloading, Screening and Re-loading of NHT Reactor (10DC-02) in Block-01 as per detailed scope of work. For Working 24hrs/Day Shift Basis charges etc complete
Skimming/Unloading of catalyst guard bed (appx up to 1.33M) from Top of the bed of NHT Reactor 10DC01 & Loading fresh catalyst guard bed as per detailed scope of work. For Working 24hrs/Day Shift Basis
Additional Skimming/Unloading of catalyst from 1.33M (> 1.33M up to free flow of catalyst), and loading fresh catalyst of NHT Reactor 10DC01 as per detailed scope of work.
Hourly rate for equipment & crew for carrying out additional jobs if not covered under scope of work
Overhauling & maintenance of Cold combined and Hot combined Heat exchangers For Working 24hrs/Day Shift Basis
Vent Gas cooler (12-EA03) cone, Inlet and Outlet line replacement For Working 24hrs/Day Shift Basis
Additional Welding of SS Piping up to 12.7mm Thk. if any which is not covered in the scope including cutting of joints
Re-Torqueing of CCR reactor reduction zone flange including Mobilization & De-mobilization of resources (Tools & Manpower) required for torqueing
Hourly rate for tools & manpower, to be kept on stand-by during start-up of the plant. (24 Hrs Round the clock.)
Decoking and cleaning of NHT Heater (10-BA01) Tubes (Two Pass) by Mechanical Pigging as per the detailed scope of Work on Round the clock basis using ONE single Pump Unit including Mobilization and Demobilization
Standby/Idle charges for decoking equipment setup and crew(Applicable for delay in heater handover )
Hourly Rate for Equipment & Crew for carrying out additional Jobs if any not covered under the detailed Scope of work.
Chemical cleaning of NHT compressor suction lines along with cleaning & demister inspection of recycle compressor suction compressor drum & make up gas suction drum For Working 24hrs/Day Shift Basis
Radiant Hitech Eng Pvt. Ltd.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .