NITHIN C S
SM (P and P)-CD
REPLACEMENT OF DAMAGED STRUCTURAL IN OFFSITE, FACT CD
2026_FACT_928307_1
4096/2026-2027/E34244
Limited
Miscellaneous Works
Item Rate
365 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD)
4 documents required · 4 mandatory
₹0
₹5,000
Yes
30 Sept 2026
30 Sept 2026
16 Oct 2026
30 Sept 2026
15 Oct 2026
30 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1REPLACEMENT OF DAMAGED STRUCTURAL IN OFFSITE, FACT CD | |||||
| 1.01 | REPLACEMENT OF DAMAGED STRUCTURAL IN OFFSITE, FACT CD
Work involves: Collection of required materials from FACT-CD stores / offsite area and transport to the work site at Offsite area. All types of structural items like platforms, ladders, staircases, handrails, roofs, pipe bridges, equipment supports, pipe & duct supports, columns, walkways, etc. shall be fabricated as per the instruction of the Officer-in-Charge to meet the site requirement. Existing damaged structures in various locations in Offsite shall be dismantled / removed and replaced with newly fabricated or modified structures to meet the site requirement. Damaged structural elements shall be transported to the scrap yard / area earmarked as per the instruction of the Officer-in-Charge. Erected structural elements shall be painted with two (02) coats of zinc chromate primer of approved make / quality and two (02) coats of synthetic enamel paint of distinct colours of approved make / quality. The surfaces to be painted are to be cleaned manually using a wire brush to the extent that the entire surface is free from dirt, dust, oil, grease, or any foreign material.
The structural steel, after transporting from the store to the worksite, shall immediately be cleaned and the first coat of primer shall be applied. The structural elements, after fabrication and erection, shall be applied with a second coat of zinc chromate primer after necessary cleaning at all heights and elevations. Two coats of synthetic enamel paint of distinct colours shall be applied one after the other, allowing sufficient curing time after each coat is applied at all elevations. Any area inaccessible after erection shall be painted beforehand. All costs incurred in painting, including the cost of paints, primers, painting equipment, cleaning equipment, handling charges, scaffolding, and any other incidental expenses, will be within the contractor's scope. | 15 | MT | - | - |
| 1.02 | REPLACEMENT OF ENCLOSURES AND PROTECTIVE ELEMENTS OF VARIOUS EQUIPMENTS IN OFFSITE
Work involves: Fabrication and replacement of damaged enclosures and protective elements like dummies, doors, casings, stiffeners, covers, guards, shrouds, etc. of various static and rotating equipment situated at OFFSITE .
The activity includes collection of required materials from FACT-CD stores / area and transportation to the work site at the OFFSITE area. All types of enclosures and protective elements of the various equipment shall be fabricated as per the instruction of the Officer-in-Charge to meet the site requirement. Existing damaged items in various locations in the OFFSITE shall be dismantled / removed and replaced with newly fabricated ones to meet the site requirement. Damaged enclosures and protective elements shall be transported to the scrap yard / area earmarked as per the instruction of the Officer-in-Charge. Erected enclosures and protective elements shall be painted with two (02) coats of zinc chromate primer of approved make / quality and two (02) coats of synthetic enamel paint of distinct colours of approved make / quality. The surfaces to be painted are to be cleaned manually using a wire brush to the extent that the entire surface is free from dirt, dust, oil, grease, or any foreign material. All costs incurred in painting, including the cost of paints, primers, painting equipment, cleaning equipment, handling charges, scaffolding, and any other incidental expenses, will be within the contractor's scope. | 4 | MT | - | - |
| 1.03 | FABRICATION & ERECTION OF NEW STRUCTURAL IN OFFSITE , FACT CD
Work involves: Collection of required materials from FACT-CD stores / area and transport to the work site at OFFSITE area. All types of structural items like platforms, ladders, staircases, handrails, roofs, pipe bridges, equipment supports, pipe & duct supports, columns, walkways, etc. shall be fabricated and erected as per the instruction of the Officer-in-Charge to meet the site requirement. Erected structural elements shall be painted with two (02) coats of zinc chromate primer of approved make / quality and two (02) coats of synthetic enamel paint of distinct colours of approved make / quality. The surfaces to be painted are to be cleaned manually using a wire brush to the extent that the entire surface is free from dirt, dust, oil, grease, or any foreign material.
The structural steel, after transporting from the store to the worksite, shall immediately be cleaned and the first coat of primer shall be applied. The structural elements, after fabrication and erection, shall be applied with a second coat of zinc chromate primer after necessary cleaning at all heights and elevations. Two coats of synthetic enamel paint of distinct colours shall be applied one after the other, allowing sufficient curing time after each coat is applied at all elevations. Any area inaccessible after erection shall be painted beforehand. All costs incurred in painting, including the cost of paints, primers, painting equipment, cleaning equipment, handling charges, scaffolding, and any other incidental expenses, will be within the contractor's scope. | 8 | MT | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_975566.xls
BOQ • 0.24 MB
Compliance.pdf
Tender Documents • 0.09 MB
SpecialConditions.pdf
Tender Documents • 0.08 MB
Tenderdocuments.pdf
Tender Documents • 1.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .