Tender Value
₹76.7 L
EMD Value
₹77,000
Closing Date
27 Mar 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Drainage Division Gandhinagar, Gandhinagar
Constructing 2 Nos. New R.C.C. Box Culvert with using Precast Box across Unava Radheja Vavol drain at chainage 6180 meter near Village Radheja Ta. Gandhinagar, Dist. Gandhinagar and Saij Hajipur drain at chainage 0 meter near Village Dhanaj, Ta. Kalol, Dist. Gandhinagar. (2nd Attempt)
287677
16 (2nd Attempt) of 2025 – 2026
Open
Civil Works
Gandhinagar
12 documents required · 12 mandatory
₹2,400
Yes
Executive Engineer Drainage Division Gandhinagar
₹77,000
Yes
18 Mar 2026
18 Mar 2026
18 Mar 2026
27 Mar 2026
18 Mar 2026
Name of Work: Constructing 2 Nos. New R.C.C. Box Culvert with using Precast Box across Unava-Radheja-Vavol drain
at chainage 6180 meter near Village Radheja Ta. Gandhinagar, Dist. Gandhinagar and Saij-Hajipur drain at chainage
meter near Village Dhanaj, Ta. Kalol, Dist. Gandhinagar.(2nd attempt)
Item No. Item Description Qty Unit Rates Amount
Dismentalling masonary in lime or cement &
stacking of useful and unuseful material from
1 dismentalled materials as directed under details in 101.00 Cum 497.20
lead upto 200 mt. as directed under detailed
specifications etc. comp. (a) Brick
Dismentalling of RCC work viz. slab, beam, lintel,
barrel,staircase etc. including removing the steel
from the dismentelled portion without damage to
2 reinforcement sorting & stacking of useful and 69.00 Cum 1,514.90
unuseful material from the dismentalled materials
as directed under the detailed specification etc.
Excavation in all sorts of soil (including wet and
slushy condition of soil) with yellow, sandy, gravelly
soil including soft murrum & H.M. including sorting
& stacking and depositing the excavated stuff in
3 uniform layers as and where directed upto lead of 417.00 Cum 79.00
30 m and lift as shown below including clearing the
site etc. compute (including dewatering)
(B) For foundation trenches of C.D. work (a) 0 to
Providing and laying in position cement concrete
M15 using cement, Sand and machine crushed
4 course aggregate including providing necessary 464.00 Cum 4,439.00
form work, compaction, finishing and curring as
required etc. completed.
Providing and placing in position FE 500D bar
reinforcement for following items including cutting
bending hooking and tying complete as per detailed
drawing. For well :- curb, staining, cap and RCC Raft.
Providing and laying in position reinforce cement
concrete using crushed aggregate including
providing necessary form work, centering, vibrating,
6 smooth specified finishing, curring as required for 130.00 Cum 5,996.00
specified leads and all lifts etc complete in M-20
grade(c) for walls, including top and bottom slab of
outlet sluice etc complete.
Providing, Laying and Installation of ISO/BIS
Certified factory made Precast Box Culvert units of
3000 mm x 3000 mm, 1000 mm length with all
transportation, loading, unloading, fixing, etc.
charges confirming to Japanese Industrial Standards
(JIS) or meeting IS requirements, made by using
advanced Technology having High Performance Self
Compacting Concrete of M50 Grade concrete cube
strength and using Fe 500/Fe 500D reinforcement
bar designed for 70 R loading with 0.0 m to 0.5 m
earth cushion above it. Product also includes, male &
7 female jointing system, groove for fixing rubber 35.00 Nos. 1,15,706.00
gasket, flange coupling jointing arrangements and
special in-built hanging brackets at appropriate
locations for faster & safe installation of the product.
In no case the casting shall be allowed to be
prepared at site.The Factory /Industry such
producting shall have steam curing facility and all
products shall be steam cured as per codal
provisions. It should be casted in the stringent
atmospheric & pre-defined condition, as per
approved QAP as by Engineer In charge. Box Culvert
3000 *3000 (B*H) mm in to in dimension
Providing weep holes 100 or 110 mm dia. pipe in the
retaining wall etc complete.(b) P.V.C.Pipe
Earth work in embankment from borrow pits in all
sorts of soil and soft murrum or other suitable strata
as directed including breaking the clods and
9 dressing to the design sections including cutting the 898.00 Cum 88.00
proud section with lead as under and all lift
including clearing the site including dewatering etc.
comp.(A) For all canal capacity.(c) 200 to 1000 Mt
Providing and Fixing post and pipe railing as per
10 detailed drawing including 3 coats of painting to 37.00 Rmt 1,200.43
steel works complete.
Informatory Signs:-Providing and fixing sing boards
made out of 2 mm aluminium sheet; size 80 x
cms. rectangle as per the design of IRC-67-1977 pre
treated with phospheting process & acidteching;
coated with one coat of epoxy primer and two coats
of best quality epoxy paint; reflectorised with retror
efiective sheeting as per latest M.O.S.T.
Specifications; 3.1 m long stand postand frame
fabricated from suitable sizeiron angle of 35 x 35 x
mm 75x75x6 mm as required; painted with best
quality epoxy coatings in black and white bends. the
details of symbol for each board shall details of
symbol for each board shall be as per the instruction
of engineer incharge. The fixing at site shall be in
1:2:4 CC block of size 45x45x60cms. for each leg.
including excavation curing tec. complete under the
supervision of engineer in charge. (A)
Engineer Grade (VR)...
Rupees Seventy Six Lakh Seventy Two Thousands Nine Hundreds Eight Rupees and Fifteen Paisa Only/-
I/We am/are willing to carry out the work at…………………………………….% above/below percent (Should be written in figures
and words) of the estimated rate mentioned above. Amount of my /our tender works out as under.
Estimated amount put to tender Rs. Estimated amount put to tender Rs.
Deduct………………………. % below Rs. Add……………………………% Above Rs.
Net Rs. Net Rs.
In words :: In words ::
* (Please strike out whichever is not applicable)
NOTE 1: All work shall be carried out as per Public Works Department Handbook and other specifications of division or as
NOTE 2: All the columns in schedule should be filled in ink and the total of the entries in the last column should be struck by
the contractor under his signature. Site, moisture, weather etc.
NOTE 3: Rates quoted include clearance of site (Prior to commencement of work and at tis close) in all respects and hold
good for work under all conditions.
NOTE 4: To be on additional sheets, if found necessary.
Signature of Contractor Deputy Executive Engineer Executive Engineer
Drainage Sub Division Drainage Division
Gandhinagar Gandhinagar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
03-SBD-DTP-PRECAST-BOX-CULVERT-40226(2nd attempt).pdf
04-TECHNICAL-SPECIFICATION-DTP-PRECAST-BOX-CULVERT-40226(2nd Attempt).pdf
05-ALL-Drawings-PRECAST-BOX-CULVERT-40226.pdf
Schedule-B- Box Culvert.pdf
NOTICE NO 16 2025 2026.pdf
Download all tender documents and submit your bid