| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.2 LAdmitted-Fee/PreQual/Technical/Finance NANDANAM ALATHUKAVU KILIMANOOR PONGANADU P O PIN 695601 | KILIMANOOR | THIRUVANANTHAPURAM | KERALA | 695601 | ₹16.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹17.4 L+₹1.2 L (7.60%)Admitted-Fee/PreQual/Technical/Finance | ₹17.4 L+₹1.2 L (7.60%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SMEERAJ B S L2 | NANDU L1 |
|---|---|---|---|---|---|
| 1.00Civil works | |||||
| 1.00 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | 27 | each | 385 ₹10,395 | 200 ₹5,400 Lowest |
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 1.14 | cum | 2,570 ₹2,929.8 | 2,500 ₹2,850 Lowest |
| 1.00 | 15.24:Demolishing dry brick pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material with in 50 metres lead: | 25.8 | cum | 1,390 ₹35,862 | 1,000 ₹25,800 Lowest |
| 1.00 | 14.82:Dismantling W.C. Pan of all sizes including disposal of dismantled materials i/c malba all complete as per directions of Engineer-in-Charge | 33 | no | 141 ₹4,653 Lowest | 200 ₹6,600 |
| 1.00 | 15.52:Dismantling of flushing cistern of all types (C.I. / PVC/ Vitrious China) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead | 33 | each | 950 ₹31,350 | 100 ₹3,300 Lowest |
| 1.01 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 232.75 | sqm | 77 ₹17,922.14 | 50 ₹11,637.75 Lowest |
| 1.01 | 22.5:Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours. b) Second layer of slurry of cement @ 0.242 kg /sqm mixed with water proofing cement compound @ 0.126 kg/ sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. | 159 | sqm | 660 ₹1,04,940 Lowest | 1,000 ₹1,59,000 |
| 1.01 | 4.2.2:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:1½:3 (1 cement : 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources | 15.9 | cum | 12,300 ₹1,95,570 | 8,000 ₹1,27,200 Lowest |
| 1.01 | OD72672/2026-2027:Providing and laying brick bats of approved quality in sunken portion of toilet floor, laid in cement mortar 1:5 (1 cement : 5 coarse sand), including filling joints, ramming, dressing to required slopes and levels, surface ready for waterproofing/screed etc. complete as directed by Engineer-in-Charge. | 25.8 | cum | 3,750 ₹96,750 | 2,000 ₹51,600 Lowest |
Tender Value
Refer Docs
EMD Value
₹43,643
Closing Date
20 Jul 2026, 4:00 pmClosed
EE trivandrum Division KSHB Santhinagar
Office of Executive Engineer KSHB Santhinagar TVM
Maintenance of Toilet at Nedumangad Revenue tower
2026_KSHB_857366_2
TVDN/DB/02/2026-27
Open Tender
Civil Works - Buildings
Item Rate
120 days
Nedumangad Revenue Tower
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹43,643
Yes
22 Jul 2026
13 Jul 2026
22 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil works | |||||
| 1.001 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | - | each | - | - |
| 1.002 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 1 | cum | - | - |
| 1.003 | 15.24:Demolishing dry brick pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material with in 50 metres lead: | - | cum | - | - |
| 1.004 | 14.82:Dismantling W.C. Pan of all sizes including disposal of dismantled materials i/c malba all complete as per directions of Engineer-in-Charge | - | no | - | - |
| 1.005 | 15.52:Dismantling of flushing cistern of all types (C.I. / PVC/ Vitrious China) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead | - | each | - | - |
| 1.006 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 1 | sqm | - | - |
| 1.007 | 22.5:Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours. b) Second layer of slurry of cement @ 0.242 kg /sqm mixed with water proofing cement compound @ 0.126 kg/ sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. | - | sqm | - | - |
| 1.008 | 4.2.2:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:1½:3 (1 cement : 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources | - | cum | - | - |
| 1.009 | OD72672/2026-2027:Providing and laying brick bats of approved quality in sunken portion of toilet floor, laid in cement mortar 1:5 (1 cement : 5 coarse sand), including filling joints, ramming, dressing to required slopes and levels, surface ready for waterproofing/screed etc. complete as directed by Engineer-in-Charge. | - | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
PA.pdf
Other Document • 0.26 MB
nit1.pdf
Other Document • 0.55 MB
BOQ_1454724.xls
BOQ • 0.33 MB
biddoc.pdf
Other Document • 9.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .