Loading…
Loading…
Tender Value
₹72.9 L
EMD Value
₹73,000
Closing Date
16 Sept 2026, 6:00 pmClosed
Executive Engineer, Electrical and Mechanical Division, Vadodara
Supply of Different types of spares for Operation & Maintenance of different electrification work with one year of defect liability period on as and when required basis at Ekta Nagar
341490
05 of 2026-27
Open
Electrical - All
Works
Vadodara
19 documents required · 16 mandatory · 3 optional
₹2,832
Executive Engineer, NPHP, Vadodara
₹73,000
2 Sept 2026
2 Sept 2026
2 Sept 2026
16 Sept 2026
2 Sept 2026
acquired the experience of execution of all major items of work under the proposed contract. In
case a project has been executed by a joint venture, weight towards experience of the project
would be given to each joint venture in proportion to their financial participation in the joint
venture. if work executed jointly otherwise as per the scope of work define in Joint Venture
Substantially completed works means those works which are at least 90 % completed
as on the date of submission (i.e. gross value of work done up to the last date of submission is
90 % or more of the original contract price) and continuing satisfactorily.
For these, a certificate from the employers shall be submitted along with the
application incorporating clearly the name of the work, contract value, billing amount, date of
commencement of works, satisfactory performance of the contractor and any other relevant
information. (the experience certificate should be signed by the officer not below the rank of
4.5.4. Personnel Capabilities.
Availability for his work of personnel with adequate experience as required; as per Appendix.
4.5.5. Equipment Capabilities
Based on the studies carried out by the Engineer, the minimum suggested major equipment to attain
the completion of works in accordance with the prescribed construction schedule are shown in the
The bidders should, however, undertake their own studies and furnish with their bid, a detailed
construction planning and methodology supported with layout and necessary drawings and
calculations to allow the employer to review their proposals. The numbers, types and capacities of
each plant/equipment shall be shown in the proposals along with the cycle time for each operation
for the given production capacity to match the requirements.
4.5.6. Financial Position
The Applicant should give undertaking that he has access to, or has available, liquid assets
(aggregate of working capital, cash in hand and uncommitted bank guarantees) and / or credit
facilities up to 25 percent of the value of the contract / contracts applied.
4.5.7. The audited balance sheets for the last five years should be submitted, which must demonstrate the
soundness of the applicant’s financial position, showing long – term profitability including an
estimated financial projection for the next two years If necessary, the employer will make inquiries
with the applicant’s bankers.
4.5.8. Litigation History
The Applicant should provide accurate information on any litigation or arbitration resulting from
contracts completed or under execution by him over the last five financial years. A consistent history
of awards against the Applicant or any partner of a joint venture may result in failure of the applicant.
4.5.9. Disqualification
Even though the applicants meet the above criteria, they are subject to be disqualified if they have:
Made misleading or false representation in the forms, statements submitted, and / or Record of poor
performance such as abandoning the work, rescinding of contract for which the reasons are
attributable to the non – performance of the contractor; consistent history of litigation awarded
against the applicant or financial failure due to bankruptcy. The rescinding of contract of a joint
venture on account of reasons other than non – performance, such as Most Experienced partner of
joint venture pulling out, court directions leading to breaking up of a joint venture before the start
of work, which are not attributable to the poor performance of the contractor will, however, not
affect the qualification of the individual partners.
4.5.10. The bidder who have applied for corporate Debt Restructuring (CDR) / facing recovery proceedings
from financial institutions / facing winding up processing / those under BIFR in the last 5 financial
year shall be considered for bid qualification. However if the bank / financial institution has accepted
the proposal of debt restructuring on or before the last date of online submission, the same shall be
considered for further evaluation. An affidavit by bidder along with certificate from bank must be
produced in such cases. In case of Joint Venture agreement, this provision shall be applicable for
both lead partner and JV partner.
4.6. JOINT VENTURE: (Maximum 3 Members i.e. 1 Lead & 2 Others)
(Applicable only for estimated project cost of 50 Crore and above)
4.6.1. Joint ventures must comply with the following requirement:
(a) Following are the minimum qualification requirements:
(i) The lead partner shall meet not less than 50 percent of all criteria given in para 4.5.3 & 4.5.6
above. The joint venture must collectively satisfy the criteria of para 4.5.3 & 4.5.6 above. The
experience of the other joint venture partners shall be considered if it is not less than 30 percent
of the qualifying criteria in para 4.5.3 &4.5.6 above.
(ii) Individually each member must satisfy the requirements of para 4.5.7 & 4.5.8 above.
(b)Bid shall be signed so as to legally bind all partners, jointly and severally, and shall be submitted
with a copy of the joint venture agreement providing the joint and several liabilities with respect
to the contract.
4.6.2. Qualification of a joint venture does not necessarily qualify any of its partners individually or as a
partner in any other joint venture. In case dissolution of a joint venture, each one of the constituent
firms may qualify if they meet all the qualification requirements, subject to the written approval of
4.7. Bid Capacity
Applicants who meet the minimum qualification criteria will be qualified only if their available bid
capacity at the expected time of bidding is more than the total estimated cost of the works. The
available bid capacity will be calculated as under:
Assessed Available Bid Capacity = (A*N*2-B), where
A = Maximum value of works executed in any one year during the last five years
(updated to the price level of the year indicated in appendix) taking into
account the completed as well as works in Progress.
B = Value at current price level of the existing commitments and ongoing works
to be completed during the next 12 (Twelve) months ( period of completion
of work for which bids are invited );
N = Number of years prescribed for completion of the works for which the bids are
Note :- In Case of joint venture, the available bid capacity will be applied for
each partner to the extent of his proposed participation in the execution
4.8. Even though the bidders meet the above qualifying criteria, they are subject to be
disqualified if they have:
- Made misleading or false representation in the forms, statements and Attachments the submitted
in proof the qualification requirements; and / or
- Record of poor performance such as abandoning the works, not properly completing the contract,
inordinate delay in completion, litigation history, or financial failures etc.; and/ or
- Participated in the previous bidding for the same work and had quoted unreasonably high bid prices
and could not furnish rational justification to the employer.
5. One bid per bidder
5.1. Each bidder shall submit only one bid for one package. A bidder who submits or participates in
more than one bid (other than as a subcontractor or in cases of alternatives that have been permitted
or requested) will cause all the proposals with the bidder’s participation to be disqualified.
6. Cost of Bidding
6.1. The bidder shall bear all costs associated with the preparation and submission of his Bid, and the
Employer will in no case be responsible and liable for those costs.
7.1. The Bidder, at the Bidder’s own responsibility and risk is encouraged to visit and examine the Site
of work and its surrounding and obtain all information that may be necessary for preparing the Bid
and entering into a contract for construction of the Works.
The costs of visiting the site shall be at the Bidder’s own expense.
B. BIDDING DOCUMENTS
8. Content of Bidding Documents
8.1. The set of bidding documents comprises the documents listed below and addenda issued in
accordance with Clause 10:
Particulars Volume
- Invitation for Bids
1) Instructions to Bidders
2) Qualification Information, and other forms I
3) Conditions of Contract
4) Contract Data
5) Technical Specifications II
7) Bill of Quantities III
8) Securities and other forms
10) Documents to be furnished by bidder V
8.2. Volumes I, II, III and IV are available online and documents to be furnished by the bidder in
compliance to Section 2 will be prepared by him and furnished as Volume- V in two parts (refer
8.3. The bidder is expected to examine carefully all instructions, conditions of contract, contract data,
forms, terms, technical specifications, bill of quantities, forms, Annexes and drawings in the Bid
Document. Failure to comply with the requirements of Bid Documents shall be at the bidder’s own
risk. Pursuant to Clause 26 hereof, bids which are not substantially responsive to the requirements
of the Bid Documents shall be rejected.
9. Clarification Bidding Documents
9.1. A prospective bidder requiring any clarification of the bidding documents may notify the Employer
in writing or through E-mail at the Employer’s address indicated in the invitation to bid. The
Employer will respond to any request for clarification which he received earlier than 15 Days prior
to the deadline for submission of bids. Employer’s response will be published on website including
a description of the enquiry but without identifying its source.
9.2. Pre-bid meeting
9.2.1. The bidder or his official representative is invited to attend a pre-bid meeting which will take place
at the address, venue, time and date as indicated in the appendix.
9.2.2. The purpose of the meeting will be to clarify issues and to answer questions on any matter that may
be raised at that stage.
9.2.3. The bidder shall be required to submit any questions in writing or e-mail to reach the Employer not
later than 03 days before the meeting.
9.2.4. Minutes of the meeting, including the question raised (Without identifying the source of enquiry)
and the responses given will be published without delay on the tender website i.e.
www.nprocure.com Any modification of the bidding documents listed in sub-Clause 8.1 which may
become necessary as a result of the pre-bid meeting shall be made by the Employer exclusively
through the issue of an Addendum pursuant to Clause 10 and not through the minutes of the pre-bid
9.2.5. Non-attendance at the pre-bid meeting will not be a cause for disqualification of a Bidder
10. Amendment of Bidding Documents
10.1. Before the deadline for submission of bids, the Employer may modify the bidding documents by
issuing addenda.
10.2. Any addendum thus issued shall be part of the bidding documents. The Employer will assume no
responsibility for the same.
10.3. To give prospective bidders reasonable time in which to take an addendum into account in preparing
their bids, the Employer may, at his discretion, extend as necessary the deadline for submission of
bids, in accordance with Sub-Clause 20.2 below.
C. PREPARATION OF BIDS
11. Language of the Bid
11.1. All documents relating to the bid shall be in the English language.
12. Documents Comprising the Bid
12.1. The bid be submitted by the bidder as Volume V of the bid document (refer Clause 8.1) shall be in
two separate parts:
Part I shall be named “Technical Bid” and shall comprise
(i) Bid Security in the form specified in Section
(ii) Qualification Information and supporting documents as specified in Section
(iii) Certificates, undertakings, affidavits as specified in Section
(iv) Any other information pursuant to Clause 4.5 of these instructions
(v) Undertaking that the bid shall remain valid for the period specified in Clause
Part II shall be named “Financial Bid” and shall comprise
(i) Form of Bid as specified in Section
(ii) Priced Bill of Quantities for items specified in Section
12.2. The Bidder shall submit the details / information pertaining to each part i.e. technical as well as
financial and must be submitted online only.
12.3. Following documents will be deemed to be part of the bid.
Section Particulars Volume No.
Invitation for Bids (IFB)
1 Instruction to Bidders
3 Conditions of Contract
4 Contract Data
5 Specifications Volume II
9 Drawings Volume IV
13.1. The Contract shall be for the whole works as described in Sub-Clause 1.1, based on the priced Bill
of Quantities submitted by the Bidder.
13.2. The bidder shall fill in rates and prices and line item total (both in figures and words) for all items
of the Works described in the Bill of Quantities along with total bid price (Both in figures and
words). Items for which no rate or price is entered by the bidder will not be paid for by the Bill of
13.3. All duties, taxes, and other levies except GST payable by the contractor under the contract, or for
any other cause shall be included in the rates, prices and total Bid Price submitted by the Bidder.
(GST will be paid extra)
13.5. The rates and prices quoted by the bidder are subject to adjustment during the performance of the
Contract in accordance with the provisions of Clause 47 of the Condition of Contract (Irrespective
of the time limit and Bid Amount)
14. Currencies of Bid and Payment
14.1. The unit rates and the prices quoted by the bidder shall be entirely in Indian Rupees. All payments
shall be made in Indian Rupees.
15. Bid Validity
15.1. Bids shall remain valid for a period of not less than 120 days after the deadline date forbid
submission specified in Clause
15.2. In exceptional circumstances, prior to expiry of the original time limit, the Employer may request
that the bidders may extend the period of validity for a specified period. A bidder may refuse the
request without forfeiting his bid security. A bidder agreeing to the request will not be required or
permitted to modify his bid, but will be required to extend the validity of his security for a period of
the extension, and in compliance with Clause 16 in all respects.
16. Bid Security
16.1. The Bidder shall furnish, as part of his Bid, a Bid security in the amount as shown in Column 4 of
the table of IFB for this particular work. This Bid security shall be in favor of Employer as named
in Appendix and may be in one of the following forms;
(a) Bank Guarantee from any scheduled Indian bank, in the format given in Volume III (Bank
Guarantee is applicable only for Bid Estimated Amount of 01 Crore and above) and Bank
Guarantee of Schedule and Private Banks shall be considered as per GoG Finance Department’s
Circular No. FD/MSM/e-file/4/2025/2712/DMO Date 01/04/2026 or as per their latest amendment.
(b) Fixed Deposit Receipt issued by any Scheduled Indian Bank or a foreign Bank approved by the
Reserve Bank of India.
A Valid Bid Security / EMD Exemption Certificate issued by (1) Road & Building Department or
(2) Narmada Water Resources, Water Supply and Kalpsar Department of Govt of Gujarat.
Exemption Certificate is applicable only when Registration Certificate of Appropriate Class
and Category of Approved Contractors is required as eligible criteria of bidder.
16.2. Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall be
valid for 45 days beyond the validity of the bid i.e. total validity of 120+45 = 165 Days.
16.3. Any bid not accompanied by an acceptable Bid Security and not secured as indicated in Sub-Clauses
16.1 and 16.2 above shall be rejected by the Employer as non-responsive.
16.4. The Bid Security of unsuccessful bidders will be returned within 28 days of the end of the bid
validity period specified in Sub-Clause
16.5. The Bid Security of the successful bidder will be discharged when the bidder has signed the
Agreement and furnished the required Performance Security.
16.6. The bid Security may be forfeited
(a) If the Bidder withdraws the bid after Bid opening during the period of Bid validity.
(b)If the Bidder does not accept the correction of the Bid Price, if any or
(c) In the case of a successful Bidders, if the Bidder fails the specified time limit to
(i) Sign the Agreement; or
(ii) Furnish the requirement Performance Security.
(d) If found necessary, the bidder will be intimated for negotiation, He will be intimated maximum
three times within the validity period for negotiation, If contractor does not respond in time, his
Bid Security (EMD) will be forfeited and his tender will be rejected. Punitive action will be taken
on such contractors. (As per GoG R&B Dept’s Gr. No. S/22/2017/6369/D, Dt.08/06/2018)
17. Alternative Proposals by Bidders.
17.1. Bidders shall submit offers that fully comply with the requirements of the bidding documents,
including the conditions of contract (including mobilization advance or time for completion), basic
technical design as indicated in the drawing and specifications. Conditional offers or alternative
offers will not be considered further in the process of tender evaluation.
18. Format and Signing of Bid
18.1. The Bidder shall prepare documents comprising the bid as described in Clause 12 of these
Instructions to bidder as the “Technical Bid” and “Financial Bid” in separate parts to be uploaded.
D. SUBMISSION OF BIDS
20. Deadline for Submission of the Bids
20.1. Complete Bids must be received online by the Employer at the tender website specified above not
later than the date indicated in appendix.
20.2. The Employer may extend the deadline for submission of bids by issuing an amendment in
accordance with Clause 10, in which case all right and obligation of the Employer and the bidders
previously subject to the original deadline will then be subject to the new deadline.
22. Modification and Withdrawal of Bids
22.1. Bidders may modify or withdraw their bids online before the deadline prescribed in Clause 20 or
pursuant to Clause
22.3. No bid shall be modified or withdrawn after the deadline for submission of Bid.
22.4. Withdrawal or modification of a bid between the deadline for submission of ids and the expiration
of the original period of bid validity specified in Clause 15.1 above or as extended pursuant to Clause
15.2 may result in the forfeiture of the Bid security pursuant to Clause
E. BID OPENING AND EVALUATION
23. Bid Opening
23.1. The Employer will open all the Bids received including modifications made pursuant to Clause
in the presence of the Bidders or their representatives who choose to attend at time, date and the
place specified in Appendix in the manner specified in Clauses 20 and 23.3, In the event of the
specified date of Bid opening being declared a holiday for the Employer, the Bids will be opened at
the appointed time and location on the next working day.
23.3. The “Technical Bid” shall be opened. The amount, form and validity of the bid security furnished
with each bid will be announced. If the bid security furnished does not conform to the amount and
validity period as specified in the invitation for bid (ref. Column 4 and Paragraph 3), and has not
been furnished in the form specified in Clause 16, the technical bid will not be opened.
(i) Subject to confirmation of the bid security by the issuing Bank, the bids accompanied with valid bid
security will be taken up for evaluation with respect to the Qualification information and other
information furnished in Part-I of the bid pursuant to Clause 12.1.
(ii) If required, the bidder will be asked in writing to clarify his Qualification Documents with respect
to any required clarification.
(iii)The bidders will respond in not more than 7 days of issue of the clarification letter.
(iv) Immediately (usually within 3 or 4 days), on receipt of these clarification the Evaluation Committee
will finalize the list of responsive bidders whose financial bids are eligible for consideration.
23.6. At the time of opening of “Financial Bid”, the names of the bidders were found responsive in
accordance with Clause 23.4(iv) will be announced. The bids of only these bidders will be opened.
The responsive Bidders’ names, the Bid prices, the total amount of each bid, any discount and such
The responsive Bidders’ names, the Bid prices, the total amount of each bid, any discount and such
other details as the Employer may consider appropriate, will be announced by the Employer at the
23.7. The time of opening of “Financial Bid”, the names of the bidders were found responsive in
accordance with Clause 23.4(iv) will be announced. The bids of only these bidders will be opened.
The responsive Bidders’ names, the Bid prices, the total amount of each bid, any discount, and such
The responsive Bidders’ names, the Bid prices, the total amount of each bid, any discount, and such
other details as the Employer may consider appropriate, will be announced by the Employer at the
23.8. In case bids are invited for more than one package, the order for opening of the “Financial Bid”
shall be in order of estimated amount of Bids from highest to lowest.
23.9. The Employer shall prepare minutes of the Bid opening, including the information disclosed to those
present in accordance with Sub-Clause 23.6.
24.1. Information relating to the examination, clarification, evaluation, and comparison of Bids and
recommendations for the award of a contract shall not be disclosed to Bidders or any other persons
not officially concerned with such process until the award to the successful Bidder has been
announced. Any effort by Bidder to influence the Employer’s processing of Bids or award decisions
may result in the rejection of his Bid.
25. Clarification of Financial Bids
25.1. To assist in the examination, evaluation, and comparison of Bids, the Employer may, at his
discretion, ask any Bidder for clarification of his Bid, including breakdowns of unit rates. The
request for clarification and the response shall be in writing or by e- mail, but no change in the price
or substances of the Bid shall be sought, offered, or permitted except as required to confirm the
correction of arithmetic errors discovered by the Employer in the evaluation of the Bids.
25.2. Subject to Sub-clause 25.1, no Bidder shall contact the Employer on any matter relating to his Bid
opening to the contract is awarded. If the Bidder wishes to bring additional information to the notice
of the Employer, it should do so in writing.
25.3. Any effort by the Bidder to influence the Employer in the Employer's bid evaluation, bid comparison
or contract award decision may result in the rejection of the Bidders’ bid.
26. Examinations of Bids and Determination of Responsiveness
26.1. During the detail evaluation of "Technical Bid", the Employer will determine whether each Bid (a)
meets the eligibility criteria defined in Clause 3 and 4; (b) has been properly signed; (c) is
accompanied by the required securities and; (d) is substantially responsive to the requirements of
the Bidding document. During the detailed evaluation of the “Financial Bid”, the responsiveness of
the bids will be further determined with respect to the remaining bid conditions, i.e., priced bill of
quantities, technical specifications, and drawings.
26.2. A substantially responsive “Financial Bid” is one which confirms all the terms, conditions and
specifications of bidding documents, without material deviation or reservation. A material deviation
or reservation is one (a) which affects in any substantial way the scope, quality, or performance of
the Works; (b) which limits in any substantial way, inconsistent with the Bidding documents, the
Employer’s rights or the Bidder’s obligations under the Contract; or (c) whose rectification would
affect unfairly the competitive position of other Bidders presenting substantially responsive Bids.
26.3. If a “Financial Bid” is not substantially responsive, it will be rejected by the Employer, and may not
subsequently be made responsive by correction or withdrawal of the non-conforming deviation or
29. Evaluation and Comparison of Financial Bids
29.1. The Employer will evaluate and compare only the Bids determined to be substantially responsive in
accordance with Sub-Clause 26.2.
29.3. The Employer reserves the right to accept or reject any variation or deviation. Variation and
deviations and other factors, which are in excess of the requirements of the Bidding documents or
otherwise result in unsolicited benefits for the Employer, shall not be taken in to account in Bid
29.4. The estimated effect of the price adjustment conditions under Clause 47 of the Conditions of
Contact, during the period of implementation of the Contract, will not be taken in to account in Bid
29.5. If the Bid of the successful Bidder is seriously unbalanced in relation to the Engineer’s estimate of
the cost of work to be performed under the contract the Employer may require the Bidder to produce
detailed consistency of those prices with the construction methods and schedule proposed. After
evaluation of the price analyses, the Employer may require that the amount of the performance
security set forth in Clause 34 be increased at the expense of the successful /bidder to a level
sufficient to protect the Employer against financial loss in the event of default of the successful
Bidder under the Contract.
29.6. A bid which contains several items in the bill of Quantities which are unrealistically priced low and
which cannot be substantiated satisfactorily by the bidder may be rejected as non-responsive.
F. AWARD OF CONTRACT
31. Award Criteria
31.1. Subject to Clause 32, the Employer will award the contract to the Bidder whose Bid has been
(i) to be substantially responsive to the Bidding documents and who has offered the lowest
evaluated Bid Price; and
(ii) to be within the available bid capacity adjusted to account for his bid price which is the lowest
evaluation in any of the packages opened earlier than the one consideration.
In no case, the contract shall be awarded to any bidder whose available bid capacity is less than
the evaluated bid price, even if the said bid is the lowest evaluated bid. The contract will in such
cases be awarded to the next lowest bidder at his evaluation bid price.
32. Employer’s Right to Accept any Bid and to Reject any or all Bids
32.1. Notwithstanding Clause 31, the Employer reserves the right to accept or reject any Bid, and to cancel
the Bidding process and reject all Bids, at any time prior to the award of contract, without thereby
incurring any liability to the affected bidder or Bidder or any obligation to inform the affected Bidder
or Bidders of the grounds for the Employer’s action.
33. Notification of Award and Signing of Agreement
33.1. The Bidder whose Bid has been accepted will be notified of the award by the Employer prior to
expiration of the Bid validity period by cable, telex or facsimile confirmed by registered letter. This
letter (hereinafter and in the condition of contract called the “Letter of Acceptance”) will state the
sum that the Employer will pay the Contractor in consideration of the execution, completion, and
maintenance of the Works by the Contractor as prescribed by the Contract (hereinafter and in the
Contract called the “Contract Price”).
33.2. The notification of award will constitute the formation of the contract, subject only to the furnishing
of a performance security in accordance with the provisions of Clause.
33.3. The Agreement will incorporate all agreements between the Employer and the successful Bidder. It
will be signed by the Employer and to the successful Bidder, within 28 days following the
notification of award along with the Letter of Acceptance. Within 21 days of receipt, the successful
Bidder will sign the Agreement and deliver it to the Employer.
33.4. Upon the furnishing by the successful Bidder of the Performance Security, the Employer will
promptly notify the other Bidders that their Bids have been unsuccessful.
34. Performance Security
(A) Within 10 (Ten) days of receipt of Letter of Acceptance, the successful Bidder shall furnish to the
Employer an irrevocable and unconditional guarantee from a Bank in the form set forth in Section-
8 (the “Performance Security”) for an amount equal to 5% (five percent) of its Contract Price. In
case of bids mentioned below, the successful Bidder, along with the Performance Security, shall
also furnish to the Authority an irrevocable and unconditional guarantee from a Bank in the same
form given at Section 8 towards an Additional Performance Security (The “Additional Performance
Security”) for an amount calculated as under:
(a) If the Contract Price offered by the Selected Bidder is lower than 10% but up to 20% of the
Estimated Project Cost, then the Additional Performance Security shall be calculated @ 20%
of the difference in the (i) Estimated Project Cost (as mentioned in Bid Document) - Minus
10% of the Estimated Project Cost and (ii) Contract Price offered by the selected Bidder.
(b) If the Contract Price offered by the Selected Bidder is lower than 20% of the Estimated Project
Cost, then the Additional Performance Security shall be calculated @ 30% of the difference in
the (i) Estimated Project Cost (as mentioned in Bid Document) - Minus 10% of the Estimated
Project Cost and (ii) Contract Price offered by the selected Bidder.
(c) This Additional Performance Security shall be treated as part of the Performance Security.
(B) The Performance Security shall be valid beyond 60(sixty) days from the stipulated date of
completion of the Project and Additional Performance Security shall be valid beyond 28 (twenty-
eight) days of Project Completion Date.
34.2. If the performance security is provided by the successful Bidder in the form of a Bank Guarantee,
it shall be issued either (a) at the Bidder’s option, by a Nationalized/Scheduled Indian bank or (b)
by a foreign bank located in India and acceptable to the Employer. As per GoG Finance
Department’s Circular No. FD/MSM/e-file/4/2025/2712/DMO Date 01/04/2026 or as per their
latest amendment.
34.3. Failure of the successful Bidder to comply with the requirement of Sub-Clause 34.1 shall constitute
sufficient grounds for cancellation of the award and forfeiture of the Bid Security.
35. Advance Payment and Security
35.1. The Employer will provide an Advance payment on the Contract Price as stipulated in the
Conditions of Contract, subject to maximum amount, as stated in the Contract Data.
37. Corrupt of Fraudulent Practices
37.1. The Employer will reject a proposal if it determines that the Bidder recommended for award has
engaged in corrupt or fraudulent practices in completing for the contract in question and will declare
the firm ineligible, either indefinitely or for a stated period of time, to be awarded a contract with
National Highways Authority of India/ State PWD and any other agencies, if it at any time
determines that the firm has engaged in corrupt or fraudulent practices in completing for the
contractor, or in execution.
37.2. Furthermore, Bidders shall be aware of the provision stated in Sub-Clause-59.2 of the Conditions
APPENDIX TO ITB
Clause Reference With respect to Section –I
1. The Name of the Employer is is “Executive Engineer, Electrical and [ Cl.1.1]
Mechanical Division, Ekta Nagar”.
2. The last five financial years.
3. This Annual Financial Turnover Amount is Rs. 73.00 Lakhs [Cl.4.5.3(a)]
4. Value of work is Rs.
6. The cost of electric work is Rs.
7. The cost of water supply / sanitary works is Rs.
8. Liquid assets and / or availability of credit facilities is Rs.18,22,141.00. [Cl.4.5.6 ]
9. Price level of the financial year: 2026-27 [Cl. 4.5.2]
10. Deleted [Cl. 9.2.1]
11. The technical Bid will be opened on date and time as stated on online
NIT at the office of The Executive Engineer, Electrical & Mechanical
Division ,SSNNL, 2nd Floor, Block-A, Narmada Bhavan, Indira
Avenue, Vadodara -
12. Address of the Employer:
Executive Engineer, Electrical and Mechanical Division, Ekta Nagar
Sardar Sarovar Narmada Nigam Limited
New Administrative Block, 519, 5th Floor
Ekta Nagar- 393 151 (Gujarat)
14. The bid should be submitted latest by As stated on online NIT. [Cl. 20.1 &
15. The bid will be opened in the office of The Executive Engineer, [Cl. 23.1 ]
Electrical & Mechanical Division ,SSNNL,2nd Floor, Block-A,
Narmada Bhavan, Indira Avenue, Vadodara - 390001As stated on
16. The Bank Draft in favor of Executive Engineer, Narmada Project
Hydro Power, Vadodara
18. Escalation factors (for the cost of works executed and financial figure to [Cl.4.5.2]
a common base value) for works completed
Year Financial Year Multiplying factor
Base year of inviting tender 2026-2027
LIST OF KEY PLANT & EQUIPMENT TO BE DEPLOYED ON CONTRACT WORK
[Reference CL. 4.5.5]
The contractors shall also give a list of machineries in his possession and which they propose
to use on the work.
Sr. Plant or Machinery Approximate Remark
Location Make Capacity
No. machinery (maximum Value s
List of Key Personnel to be deployed on Contract Work
(Reference Cl. 4.5.4)
Employment of a qualified site Engineer by the Contractor.
The Contractor shall employ full-time technically qualified staff during the execution of this work as
1. Two graduate Civil Engineers and three diploma Civil Engineers when cost of the work to be executed
is more than Rs.50 lakhs.
2. One graduate & two Diploma, Civil Engineers when the cost of the work to be executed is more than
Rs.15 lakhs but less than Rs.50 lakhs.
3. Minimum two Diploma Civil Engineer when the cost of work is less than Rs.15 lakhs but more than
4. Minimum One Diploma Civil Engineers for the work when the cost of work to be executed is less than
Rs. 5 lakhs. The Engineer so employed for the Government work must have sufficient experience to
handle the work independently. Such an Engineer shall have to stay at the site of work and he shall
not be entrusted with other duty except this work.
In case the contractor or partner of the contractor firm is a Civil Graduate Engineer, Employment of a
separate Engineer will not be necessary provided that the Engineer partner himself attends the execution
of the work on the site.
Within 15 days of issue of work-order the Contractor will have to furnish to the Deputy Executive
Engineer-in-charge of the work the Name, Qualifications, copy of mark sheet, Colour Photograph and
the appointment order issued such engineers engaged for this contract work. If 15 days after issue of
work order such designated Site Engineers do not resume or do not remain present on site of work, the
recovery at the rate of Rs.15, 000-00 per month per Engineer will be made from the bills/deposit/dues of
the contractor. Such recovery shall be non-refundable.
THIS PAGE HAS BEEN KEPT BLANK
QUALIFICATION INFORMATION
THIS PAGE HAS BEEN KEPT BLANK
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for the purpose
of post qualification as provided for in Clause-4 of the Instruction to Bidders. This information will not
be incorporated in the Contract.
1. For Individual Bidders
1.1. Constitution or legal status of Bidder (Attach Copy)
Place of registration
Principal place of business
Power of attorney of signatory of Bid
1.2. Total value of Supply of electrical Works performed in the 2025-26
last five years
(in Rs. Lakhs) 2022-23
1.3.1. Work performed as prime contractor, work performed in the past as a nominated sub-contractor will
also be considered the sub-contract involved execution of all main items of work described in the
bid documents, provided further that all other qualification criteria are satisfied (in the same name)
on works of a similar nature over the last five years** and in current year before the submission of
Value of of Actual date
Name of Stipulated reasons
Project Description Contract contract issue of
the period of for delay&
Name of work No. (Rs. of completion
Employer completion work
*Attach certificate(s) from the Engineer(s)-in-charge
** Immediately preceding the financial year in which bids are received.
1.3.2. Quantities of work executed as prime contractor, work performed, in the past as a nominated sub-
contractor, will also be considered provided the sub-contract involved execution of all main items
of work described in the bid document, provided, further that all other qualification criteria are
called (in the same name and style) in the last five years** and in current year before the submission
Quantity of Work Performed
Name of Cement Masonary Earth Bituminous
Name of Concrete Works Work (Indicate
Year the (Item 2)
Project/work (iuncluidng Contract
Employer (Item (Item 4)
1.4. Information on Bid Capacity (works for which bids have been submitted and works which are yet to
be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
Place Name & Value Stipulated Anticipated
Description Contract remaining
& Address of Contract Period of of
of works No. to be
State Employer (Rs. Cr) Completion completion
*Attach certificate (s) from the Engineer(s) in-charge
** Immediately preceding the financial year in which bids are received.
1.5. Availability of key items of Contractors Equipment for carrying out the works (Ref. Clause 4.5.5).
The Bidder should list all the information requested below.
Requirement Remarks
Availability Proposal
Item of (from whom
Equipment Owned/Leased Nos./ Age/ to be
to be procured Capacity Conditions purchased)
1.6. Qualifications and experience of key personnel required for administration and execution of the
contract. Attach biographical data. Refer also to Sub Clause 9.1 of the Conditions of Contract.
Year of Year of experience
Position Name Qualification Experience in the proposed
(General) position
Project Manager
Diploma Civil Engineer
1.7. Proposed sub-contract and firms involved.
Sections of Value of Sub- Experience in
the works Contractor similar work
Attach copies of certificates on possession of valid license for executing water supply/ sanitary work/
building electrification works.
1.8. Financial reports for the last five years: balance sheets, profit and loss statements, auditors’ reports
(in case of companies/corporations), etc. List them below and attach copies.
1.9. Evidence of access to financial resources to meet the qualification requirements: cash in hand, lines
of credit, etc. List them below and attach copied documents.
1.10. Name, address, and telephone, telex, Email address and fax numbers of the Bidders bankers who
may provide references if contacted by the Employer.
1.11. Information on Litigation history in which the Bidder is involved.
Other Party/ Cause of Amount
Employer showing Present
(ies) Dispute Involved
1.12. Statement of compliance under the requirements of Sub-Clause 3.2 of the instruction to Bidders.
(Name of Consultant engaged for project preparations is *…………………..)
* Fill the name of Consultant
1.13. Proposed work method and schedule. The Bidder should attach descriptions, drawings and charts as
necessary to comply with the requirements of the Bidding documents. (Refer ITB Clause 4.1)
1.14. Programme
3. Additional Requirements
3.1. Bidders should provide any additional information required to fulfill the requirements of Clause
of the Instructions to the Bidders, if applicable.
(ii) Undertaking
SAMPLE FORMAT FOR EVIDENCE OF ACCESS TO OR AVAILABILITY OF
CREDIT FACILITIES
(CLAUSE 4.5.6 OF ITB)
BANK CERTIFICATE
This is to certify that M/s._________________is a reputed company with a good financial standing.
If the contract for the work, _____________________________________namely is awarded to the above
firm, we shall be able to provide overdraft/credit facilities to the extent of Rs.______________to meet
their working capital requirements for executing the above during the contract period.
Senior Bank Manager
Address of the Bank
1. I, the undersigned, do hereby certify that all the statements made in the required attachments are
true and correct.
2. The undersigned also hereby certifies that neither our firm M/s.
abandoned any work of Government of Gujarat/Government of India/any Board or Corporation
under Government of Gujarat/Government of India nor any contract awarded to us for such works
have been rescinded, during last five years prior to the date of this bid.
3. The undersigned hereby authorize(s) and request (s) any bank, person, firm or corporation to furnish
pertinent information deemed necessary and requested by the Department to verify this statement
or regarding any (our) competence and general reputation.
4. The Undersigned understands and agrees that further qualifying information may be requested, and
agrees to furnish any such information at the request of the Department/ Project implementing
(Signed by an Authorized Officer of the Firm)
Title of Officer
I, the undersigned do hereby undertake that our firm
minimum cash up to 25% of the value of the work during implementation of the contract.
(Signed by an Authorized Officer of the Firm)
Title of Officer
THIS PAGE HAS BEEN KEPT BLANK
CONDITIONS OF CONTRACT
Conditions of Contract
Table of Contents
A. General Page D. Cost Control Page
1. Definitions 48 37. Bill of Quantities
2. Interpretation 49 38. Changes in the Quantities
3. Language and Law 50 39. Variations
4. Engineer’s Decisions 50 40. Payments for Variations
5. Delegations 50 41. Cash Flow Forecasts
6. Communications 50 42. Payment Certificates
7. Sub-Contractors 50 43. Payments
8. Other Contractors 50 44. Compensations Events
9. Personnel 50 45. Tax
10. Employer’s & Contractor Risk 51 46. Currencies
11. Employers Risks 51 47. Price Adjustment
12. Contractor’s Risk 51 48. Retention
13. Insurance 51 49. Liquidated damages
14. Site Investigations Reports 52 50. Bonus
15. Queries about the Contract 52 51. Advance Payment
16. Contractors to Construct the works 52 52. Securities
17. The Works to be Completed By the 53. Deleted
Intended Completion Date
18. Approval by the Engineer 52 54. Cost of Repair
19. Safety 52 E. Finishing the Contract
20. Discoveries 53 55. Completion
21. Possession of the Site 53 56. Taking Over
22. Access to the Site 53 57. Final Account
23. Instructions 58. Operating and Maintenance
24. Disputes 53 59. Terminations
25. Procedure for Disputes 54 60. Payment upon Terminations
26. Deleted 54 61. Property
B. Time Control 62. Release from Performance
27. Programme 55 F. Special Conditions of Contract
28. Extensions of the Intended completion 63. Labour
29. Deleted 64. Compliance with labour
30. Delays Ordered by The 65. Arbitration
31. Management Meetings
32. Early Warning
C. Quality Control
33. Identifying Defects
35. Correction of Defects
36. Uncorrected Defects
CONDITIONS OF CONTRACT
1.1. Terms which are defined in the Contract Data are not also defined in the Conditions of Contract but
keep their defined meaning.
Bill of Quantities means the priced and completed Bill of Quantities forming part of the Bid
Compensation Events are those defined in Clause 44 hereunder
The Completion Date is the date of completion of the Works as certified by the Engineer in
accordance with Sub Clause
The Contract is the contract between the Employer and Contractor to execute, complete and
maintain the Works till the completion of Defects Liability Period. It consists of the documents
listed in Clause 2.3 below.
The Contract data defines the documents and other information which comprise the Contract. The
Contractor is a person or corporate body whose Bid to carry out the Work has been accepted by
The Contractor’s Bid is the completed Bidding document submitted by the Contractor to the
Employer and includes Technical and Financial Bids.
The Contract Price is the price stated in the Letter of Acceptance and thereafter as adjusted in
accordance with the provisions of the Contract.
Days are calendar days: months are calendar months.
The Defects Liability Period is the period named in the Contract Data and calculated from the
Completion Date.
The Employer is the party who will employ the Contractor to carry out the Works.
The Engineer is the person named in the Contract Data (or any other competent person appointed
and notified to the contractor to act in replacement of the Engineer) who is responsible for
supervising the Contractor, administering the Contract, certifying payments due to the Contractor,
issuing and valuing Variations to the Contract, awarding extensions of time, and valuing the
Compensations Events.
Equipment is Contractor’s machinery and vehicles brought temporarily to the site to construct the
The Initial Contract Price is the Contract Price listed in the Employer’s Letter of Acceptance. The
Intended Completion Date is the date on which it is intended that the Contractor shall complete
the Works. The Intended Completion Date is specified in the Contract Data. The Intended
Completion Date may be revised only by the Engineer by issuing an extension of time.
Materials are all supplies, including consumables, used by the contractor for incorporation in the
Plant is any integral part of the work which is to have mechanical, electrical, electronic or chemical
or biological functions.
The Site is the area defined as such in the Contract Data.
Site Investigation Reports are those which were included in the Bidding documents and are factual
interpretive reports about the surface and subsurface conditions at the site.
Specifications means the Specifications of the works included in the Contract and any modification
or addition made or approved by the Engineer.
The Start Date is given in the Contract Data. It is the date when the Contractor shall commence
execution of the works. It does not necessarily coincide with any of the Site Possession Dates.
A Subcontractor is a person or corporate body who has a Contract with the Contractor to carry out
a part of the work in the Contract which includes work on the Site.
Temporary Works are works designed, constructed, installed, and removed by the Contractor
which are needed for construction or installation of the Works.
A Variation is an instruction given by the Engineer, which varies the Works.
The Works are what the Contract requires the Contractor to construct, install, and turn over to the
Employer, as defined in the Contract Data.
2. Interpretation
2.1. In interpreting these Conditions of Contract, singular also means plural, male also means female or
neuter and the other way around. Heading have no significance. Words have their normal meaning
under the language of the Contract unless specifically defined. The Engineer will provide
instructions clarifying queries about Conditions of Contract.
2.2. If sectional completion is specified in the Contract Data, references in the Conditions of Contract to
the Works, the Completion date, and Intended Completion Date apply to any Section of the Works
(other than references to the Completion Date and Intended Completion date for the whole works)
2.3. The documents forming the Contract shall be interpreted in the following order of priority
(2) Letter of Acceptance, notice to proceed with works
(3) Contractor’s Bid
(4) Contract Data
(5) Conditions of Contract including Conditions of Contract
(6) Specifications
(8) Bills of quantities and
(9) Any other document listed in the Contract Data as forming part of the Contract.
3. Language and Law
3.1. The language of the Contract and the law governing the Contract are stated in the Contract Data.
4. Engineers Decisions
4.1. Except where otherwise specifically stated, the Engineer will decide contractual matters between
the Employer and the Contractor in the role representing the Employer.
5.1. The Engineer may delegate any of his duties and responsibilities to other people after notifying the
Contractor and may cancel any delegation after notifying the Contractor.
6. Communications
6.1. Communications between parties which are referred to in the conditions are effective only when in
writing. A notice shall be effective only when it is delivered (in terms of Indian Contract Act).
7. Sub-Contracting
7.1. The Contractor may subcontract any portion of work, up to a limit specified in Contract Data, with
the approval of the engineer but may not assign the Contract without the approval of the Employer
in writing. Subcontracting shall not alter the Contractor’s obligations. Sub-contracting of supply
or specific items of work is not allowed.
7.2. The sub-contractor must be registered in appropriate class and category for the part of work to be
8. Other Contractors
8.1. The Contractor shall cooperate and share the Site with other contractors, public authorities, utilities
and the Employer between the dates given in the Schedule of other Contractor. The Contractors
shall as refer to in the Contract Data, also provide facilities and services for them as described in the
Schedule. The employer may modify the schedule of other contractors and shall notify the contractor
of any such modifications.
9.1. The Contractor shall employ the key personnel named in the Schedule of Key Personnel as referred
to in the Contract Data to carry out the functions stated in the Schedule or other personnel approved
by the Engineer. The Engineer will approve any proposed replacement of key personnel only if their
qualifications, abilities, and relevant experience are substantially equal to or better than those of the
personnel listed in the Schedule.
9.2. If the engineer asks the Contractor to remove a person who is a member of the Contractor Staff or
his work force stating the reasons the Contractor shall ensure that the person leaves the Site within
seven days and has no further connection with the work in the Contract.
10. Employer’s and Contractors Risks
10.1. The Employer carries the risk which these Contract states are Employer’s risks, and the Contractor
carries the risks which these Contracts states are Contractors risk.
11. Employer’s Risks
11.1. The employer is responsible for the excepted risks which are (a) in so far as they directly affect the
execution of the Works, the risks of war, hostilities, invasion, act of foreign enemies, rebellion,
revolution, insurrection or military or usurped power, civil war, riot commotion or disorder (unless
restricted to the Contractor’s employees), and contamination from any nuclear fuel or nuclear waste
or radioactive toxic explosive.
12. Contractor’s Risks
12.1. All risks of loss of or damages to physical property and of personal injury and death which arise
during and in consequence of the performance of the Contract other than the excepted risks are the
responsibility of the Contractor.
13.1. The Contractor shall provide, in the joint names of the Employer and the Contractor, insurance cover
from the Start date to the end of the Defects Liability Period, in the amounts and deductibles stated
in the Contract Data for the following events which are due to the Contractor’s risks:
(a) Loss of or damage to the works, Plant and materials,
(b) Loss of or damage to Equipment
(c) Loss of or damages of property (expect the Works, Plant, Materials and
Equipment) in connection with the Contract; and
(d) Personal injury or death.
13.2. Policies and certificates for insurance shall be delivered by the Contractor to the Engineer for the
Engineer’s approval before the Start Date. All such insurance shall provide for compensation to be
payable in the types and proportions of currencies required to rectify the loss or damage incurred.
13.3. If the Contractor does not provide any of the policies and certificates required, the Employer may
affect the insurance which the Contractor should have provided and recover the premiums the
Employer has paid from payments otherwise due to the Contractor or, if no payment is due, the
payment of the premiums shall be a debt due.
13.4. Alterations to the terms of an insurance shall not be made without the approval of the Engineer.
13.5. Both parties shall comply with any conditions of the insurance policies.
14. Site Investigation Report
14.1. The Contractor in preparing the Bid shall rely on any site Investigation reports referred to in the
Contract Data, supplemented by any information available to the Bidder.
15. Queries about the Contract Data
15.1. The engineer will clarify queries on the Contract Data
16. Contractor to Construct the Works
16.1. The Contractor shall construct and install the works in accordance with the specification and
17. The Works to be completed by the Intended Completion Date
17.1. The Contractor may commence execution of the Works on the Start Date and shall carry out the
Works in accordance with the programme submitted by the Contractor, as updated with the approval
of the Engineer, and complete them by the Intended Completion date
18. Approval by the Engineer
18.1. The Contractor shall submit Specifications and Drawings showing the proposed Temporary works
to the Engineer, who is to approve them if they comply with the Specifications and drawings.
18.2. The Contractor shall be responsible for design of temporary works.
18.3. The Engineer’s approval shall not alter the contractor responsibility for design of the Temporary
18.4. The Contractor shall obtain approval of third parties to the design of the Temporary works where
18.5. All Drawings prepared by the Contractors for the execution of the temporary or permanent work are
subject to prior approval by the Engineer before their use.
19.1. The Contractor shall be responsible for the safety of all activities on the Site.
20. Discoveries
20.1. Anything of historical or other interest or of significant value unexpectedly discovered on the site is
the property of the Employer. The contractor is to notify the engineer of such discoveries and carry
out the Engineer’s instructions for dealing with them.
21. Possession of the Site
21.1. The Employer shall give possession of all parts of the site to the Contractor. If possession of a part
is not given by the date stated in the Contract Data the Employer is deemed to have delayed the start
of the relevant activities and this will be a Compensation Event.
21.2. If within 25% of the time limit of the project, 80% of possession of the site is not handed over to
the Contractor, then contractor/ Employer may fore-close the contract. Contractor/Employer has to
foreclose the work within 30 days after lapse of 25%-time limit and after 30 days foreclosure option
will be closed.
22. Access to the Site
22.1. The Contractor shall allow the Engineer and any person authorized by the Engineer access to the
Site, to any place where work in connection with the Contract is being carried out or is intended to
be carried out and to any place where materials or plants are being manufactured/ fabricated/
assembled for the works.
23. Instructions
23.1. The Contractor shall carry out all instructions of the Engineer pertaining to works which comply
with the applicable laws where the site is located.
23.2. The Contractor shall permit the Employer to inspect the Contractor’s accounts and records relating
to the performance of the Contractor and to have them audited by auditors appointed by the
Employer, if so required by the Employer.
24.1. If the Contractor is of the view that a decision taken by the Engineer was either outside the authority
given to the Engineer by the Contract or that the decision was wrongly taken, the decision shall be
referred to Superintending Engineer, Electrical and Mechanical Circle, Vadodara within
days of the notification of the Engineer's decision. If the issue is not resolved, any party can refer
the matter for conciliation within 15 days from the decision given by the Superintending Engineer,
Electrical and Mechanical Circle, Vadodara.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with the decision of the
Superintending Engineer, Electrical and Mechanical Circle, Vadodara, both the parties
have to refer to the Chief Engineer, E&M, Vadodara concern for the conciliation process.
(b) For the work more than Rs.100 Cr., if any of the parties is not satisfied with the decision of the
Superintending Engineer, Electrical and Mechanical Circle, Vadodara, both the parties
have to refer to the Sardar Sarovar Narmada Nigam H.O., Block No. 12, Gandhinagar,
Government of Gujarat for the conciliation process.
If the dispute is not resolved through the conciliation process, he may refer the dispute to
Gujarat Public Works Contract Dispute Arbitration Tribunal. If the Contractor fails to refer a
claim / dispute to the Higher Authority within 14 days of the notification of the Engineer's
decision, the Contractor shall not be entitled to any additional payment/claim if he doesn’t
follow the above sequence in stipulated time and he should not stop the work.
25. Procedure for Disputers
25.1. The arbitration shall be conducted in accordance with the arbitration procedure stated in the Special
Conditions of Contract.
B. TIME CONTROL
27.1. Within the time stated in the Contract Data the Contractor shall submit to the Engineer for approval
a Programme showing the general methods, arrangements orders, and timing for all the activities in
the works along with monthly cash flow forecast.
27.2. An update of the Programme shall be a programme showing the actual progress achieved on each
activity and the effect of the progress achieved on the timing of the remaining work including any
changes to the sequence of the activities.
27.3. The Contractor shall submit to the Engineer, for approval an updated programme at intervals no
longer than the period stated in the Contract Data. If the Contractor does not submit an updated
programme within this period, the Engineer may withhold the amount stated in the Contract Data
from the next payment after the date on which the overdue programme has been submitted.
27.4. The Engineer’s approval of the programme shall not alter the Contractor’s obligations. The
Contractor may revise the programme and submit it to the Engineer again at any time. A revised
programme is to show the effect of Variations and Compensations events.
28. Extension of the Intended Completion Date
28.1. The Engineer shall extend the Intended Completion Date if a compensation Event occurs or a
Variation is issued which makes it impossible for completion to be achieved by the Intended
Completion Date without the Contractor taking steps to accelerate the remaining work and which
would cause the Contractor to incur additional cost.
28.2. The Engineer shall decide whether and by how much to extend the Intended Completion Date within
35 days of the Contractor asking the Engineer for a decision upon the effect of a compensation event
or Variation and submitting full supporting information. If the Contractor has failed to give early
warning of a delay or has failed to cooperate in dealing with a delay, the delay by this failure shall
not be considered in assessing the new Intended Completion Date.
28.3. The Engineer shall within 14 days of receiving full justification from the contractor for extension of
Intended Completion Date refer to the Employer his decision. The employer shall in not more than
21 days communicate to the engineer the acceptance or otherwise of the Engineer’s decision. If the
employer fails to give his acceptance, the Engineer shall not grant the extension and the contractor
may refer the matter under Clause
30. Delays Ordered by the Engineer
30.1. The Engineer may instruct the Contractor to delay the start or progress of any activity within the
31. Management Meetings
31.1. Either the Engineer or the Contractor may require the other to attend a management meeting. The
business of a management meeting shall be to review the plans for remaining work and to deal with
matters raised in accordance with the early warning procedure.
31.2. The Engineer shall record the business of management meetings and is to provide copies of his
record to those attending the meeting and to the Employer. The responsibility of the parties for
actions to be taken is to be decided by the Engineer either at the management meeting or after the
management meeting and stated in writing to all who attended the meeting.
32. Early Warning
32.1. The Contractor is to warn the Engineer at the earliest opportunity of specific likely future events or
circumstances that may adversely affect the quality of the work, increase the Contract price or delay
the execution of works. The Engineer may require the contractor to provide an estimate of the
expected effect of the future event or circumstance on the contract price and completion date. The
estimate is to be provided by the Contractor as soon as reasonably possible.
32.2. The Contractor shall cooperate with the Engineer in making and considering proposals for how the
effect of such an event or circumstance can be avoided or reduced by anyone involved in the work
and in carrying out any resulting instruction of the Engineer.
C. QUALITY CONTROL
33. Identifying Defects/ Defect liability period
33.1. Defect liability period: The contractor shall be responsible to make good and remedy at his own
expense any defect which may develop or may be noticed before the period mentioned hereunder
from the certified date of completion. The Engineer in charge shall give the contractor a notice in
writing about the defects and the contractor shall make good the same within 15 days of receipt of
the notice. In the case of failure on the part of the contractor, the Engineer- in-charge may rectify or
remove or re-execute the work at the risk & cost of the contractor. The Engineer-in-charge shall be
entitled to appropriate the whole or any part of the amount of security deposit towards the expenses,
if any, Incurred by him in rectification, removal or re-execution. The Defects Liability period shall
(A) For works Except Building
(a) For all works costing up to Rs. 50,000 (amount put to tender), the period shall be 3 Months
from the certified date of completion.
(1) For works likes Check Dam/ Canal / Drainage / Road Structure tender amount from RS.
to 10,00,000, the defect liability period shall be 12 months from the certified date of completion.
(2) For work except likes Check Dam/ Canal / Drainage / Road Structure tender amount from RS.
50,000 to 10,00,000, the defect liability period shall be 6 months from the certified date of
(1) For works likes Check Dam/ Canal / Drainage / Road Structure tender amount more than RS.
10,00,000, the defect liability period shall be 3 Years from the certified date of completion.
(2) For work except likes Check Dam/ Canal / Drainage / Road Structure tender amount from Rs.
10,00,000 to 1 Crore, the defect liability period shall be 12 months from the certified date of
For all works of tender amount more than RS. 1 Crore, the defect liability period shall be
Years from the certified date of completion.
(B) For Building works:-
For Building works of WRD, Follow the R&B Circular dated.03/12/2009
For original building works the defect liability period will be 4 years or elapse of 4 monsoon
period following date of possession of building taken over by user agency following the
certified date of completion, whichever is later.
For the purpose of deciding the monsoon period, the 30th September shall be treated as the last
WRD Circular No Matas/102013/MICELL(K-1) dated 13/12/2013.
33.2. For Road works :
Free maintenance guarantee period for works of Road/Bridge construction
(a) For resurfacing work of road free maintenance guarantee period one year from the date of
(b) In case of widening of the road/strengthening of the road/bridge, the contractor shall have to
give four years free maintenance guarantee from the certified date of completion. During this
period the contractor shall visit the site every six months along with the concerned Section
Officer / Deputy Executive Engineer and will examine the work already carried out in this
contract like road work, jungle cutting, side shoulders, side gutter, road furniture, patta etc. and
will prepare Km. wise inspection report duly signed by all concerned and any defect observed
shall be done within 15 days by the contractor at his risk and cost as per the direction of Engineer
in charge. The contractor needs to do videography of these visits and require to submit at the
time of release of FMG. If B.T. the surface during the maintenance period of 4 years is worn
out then agency shall have to provide renewal coating as per tender item as directed by the
Engineer-in- charge. The amount equivalent to 5% of each running bill shall be withheld and
will be released after the free maintenance guarantee period (i.e. 4 years) is over.
However, this amount shall be released against fixed deposit or bank guarantee pledged in
the name of Executive Engineer after completion certificate of work is issued.
(1) The flakiness and elongation index (combined) for coarse aggregates under no circumstances
shall exceed the allowable limit set forth in the relevant clause for the material in question.
(2) 2% of the amount eligible for the payment of bituminous items shall be withheld till the
miscellaneous items like earthwork in embankment / cutting for side shoulders, side gutters,
kilometer / indicator / guard stones, sign boards etc. are completed in all respect by the
contractor. After completion of the miscellaneous items, the above said 2% withheld amount
shall be released.
(Govt. of Gujarat's G.R. No.: TNC-10-2013-3(Part-3)/C, Dtd. 13/12/2013).
(3) Videography for the surface under Maintenance Guarantee is to be done as per Govt. letter No.:
SSR/10/2015-16/26/C, Dtd. 26/11/15 for the work costing more than Rs. 5.00 Crore.
(4) Setting up of adequate laboratory & deployment of quality engineers. The contractor shall have
to set up the laboratory with adequate equipment. Till the setting up of adequate laboratory is
completed & reported of this to the engineer (subject to due verification by engineer’s
representative) by contractor in writing, Rs.2,00,000/- shall be withheld. The qualified quality
Engineer shall be deployed exclusively for this contract by the contractors. If quality Engineer
is not deployed by contractor within one month after the date of work order, the amount
equivalent to Rs.20,000 per month shall be recovered till the actual deployment of quality
engineer. The amount so recovered towards the deployment of quality engineers shall not be
(5) Asphalt work will have to be cross checked as per G.R. No.: RGN/60/2006/35/C, dtd.31/05/07
before final bill is paid.
(6) Maintenance during Construction Period
During the Construction Period, the Contractor shall maintain, at his own risk and cost, the
existing lane(s) of the road so that the traffic worthiness and safety thereof are at no time
materially inferior as compared to their condition 10 (ten) days prior to the date of the
Agreement, and shall undertake the necessary repair and maintenance works for this purpose;
provided that the Contractor may, at his cost, interrupt and divert the flow of traffic if such
interruption and diversion is necessary for the efficient progress of works and conforms to Good
Industry Practice; provided further that such interruption and diversion shall be undertaken by
the Contractor only with the prior written approval of the Executive Engineer which approval
shall not be unreasonably withheld. For the avoidance of doubt, it is agreed that the Contractor
shall at all times be responsible for ensuring safe operation of the road.
33.3. The Engineer shall check the Contractor’s work and notify the Contractor of any defects that are
found. Such checking shall not affect the Contractor’s responsibilities the Engineer may instruct the
Contractor to search for a Defect and to uncover and test any work that the Engineer considers may
34.1. If the engineer instructs the Contractor to carry out a test not specified in the Specification to check
whether any work has a Defect and the test shows that it does, the Contractor shall pay for the test
and any samples. If there is no defect the test shall be a Compensation Event.
34.2. 1% of the amount of work done for works upto Rs. 10 crore of estimate cost should be deducted
from R.A. Bill of the contractor for testing the quality of material workmanship. Whereas for
estimated cost of works more than 10 crore, the charges for testing of quality of material
workmanship shall be deducted from R.A. bill of contractor as per actual charges. As Per GoG
NWRWS & K Department’s Circular No. PARCH/132023/401/MICELL Dated: 05/10/2023
34.3. Agency has to establish testing laboratory on site for the various test to be carried out in the work
for this purpose agency shall construct a pukka laboratory building with all facility on site at location
specified by the engineer in charge.
35. Correction of defects
35.1. The engineer shall give notice to the Contractor of any defects before the end of the defects Liability
Period, which begins at Completion and is defined in the Contract Data. The Defects Liability Period
shall be extended for as long as Defects remain to be corrected.
35.2. Every time notice of a Defect is given, the Contractor shall correct the notified defect within the
length of time specified by the Engineer’s notice.
36. Uncorrected Defects
36.1. If the Contractor has not corrected a defect within the time specified in the Engineer’s notice, the
Engineer will assess the cost of having the Defect corrected, and the Contractor will pay this amount.
D. COST CONTROL
37. Bill of Quantities
37.1. The bill of Quantities shall contain items for the constructions, installation, testing and
commissioning work to be done by the Contractor.
37.2. The bill of Quantities is used to calculate the Contract price. The Contractor is paid for the quantity
of the work done at the rate in the Bill of Quantities for each item.
38. Change in the Quantities
38.1. The Engineer shall have power to make any alterations in or addition to the original specifications
drawings, designs and instructions that may appear to him to be necessary or advisable during the
progress of the work and the contractor shall be bound to carry out the work in accordance with any
instruction in this connection which may be given to him in writing signed by the Engineer and such
alteration shall not invalidate the contract and any additional work which the contractor may be
directed to do in the manner above specified as part of the work shall be carried out by the contractor
on the same conditions in all respects on which he agreed to do the main work and at the same rate
as are specified in the tender for the main work.
38.2. Except that when the quantity of any item exceeds the quantity as in the tender by more than 130%,
the contractor will be paid for the quantity in excess of 130%, at the rate entered in the SOR of the
year during which the excess in quantity is first executed.
39.1. All Variations shall be included in updated programmes produced by the Contractor.
40. Payments for Variations
40.1. If the additional or altered work includes any class of work for which no rate is specified in this
contract, then such class of work shall be carried out as under.
(i) At the rate derived from the item within the contract which is comparable to the one involving
additional or altered class of work; where there are more than one comparable items, the item of the
contract which is nearest in comparison with regard to class or classes of the work involved shall be
selected and the decision of the Superintending Engineer as to the nearest comparable item shall be
final and binding on the contractor.
(ii) If the rate cannot be derived in accordance with (i) above, such class of works shall be carried out
at the rate entered in the Schedule of Rates of the division for the year in which the tender was
received, increased or decreased by the percentage by which the tender amount is more or less as
compared to the amount arrived at the rates in the “Schedule of Rates” of the Division in the year
in which the tender was received. If the Schedule of rates of the Division does not contain all the
items, the percentage increase or decrease of the tender shall be calculated considering such items
which were included in the “Scheduled Rates” of the division for the year and for materials
consumed on such item the rate to be charged would be the basic rate taken into account for fixing
the rate in S.O.R. referred to above.
(iii) If it is not possible to arrive at the rate from (i) and (ii) above, such class of work shall be carried
out at the rate decided by the competent authorities on the basis of detailed rate analysis after hearing
the contractor before a Committee of two Superintending Engineers stationed at the same place or
the nearest place.
40.2. If the additional or altered work, for which no rate is entered in the “Schedule of Rates” of the
Division is ordered to be carried out before the rate is agreed upon, then the contractor shall within
seven days of the date of receipt by him of the order to carry out the work, inform the Engineer-in-
charge of the rate, which it is his intention to charge for such class of work and if the Engineer in
charge does not agree to this rates, he shall by notice in writing be at liberty to cancel his order to
carry out such class of work and arrange to carry it out in such manner as he may consider it
advisable, provided always that if the contractor shall commence work or incur any expenditure in
regard thereof before the rates shall have been determined as lastly herein before mentioned, then
in such cases he shall only be entitled to be paid in respect of the work carried out or expenditure
incurred by him prior to the date of the determination of the rate as aforesaid according to such rate
or rates as shall be fixed by the Engineer-in-charge. In the event of the dispute, the decision of the
Superintending Engineer of the Circle shall be final.
Where, however, the work is to be executed according to the designs, drawings and
specifications recommended by the contractor and accepted by the competent authority, the
alternation above referred to shall be within the scope of such designs, drawings and specifications
appended to the tenders.
The time limit for the completion of the work shall be extended in the proportion that the
increase in the cost occasioned by alterations bears to the cost of the original work and the certificate
of the Engineer-in-charge as to such proportion shall be final and conclusive.
41. Cash Flow Forecasts
41.1. When the programme is updated, the contractor is to provide the engineer with an updated cash flow
42. Payment certificates.
42.1. The Contractor shall submit to the Engineer monthly statements of the estimated value of the work
completed less the cumulative amount certified previously.
42.2. The Engineer shall check the Contractor’s monthly statement within 14 days and certify the amount
to be paid to the Contractor after taking in to account any credit or debit for the month in question
in respect of materials for the works in the relevant amounts and under conditions set forth in Sub-
Clause 32.3 of the Contract Data (secured Advance).
42.3. The value of work executed shall be determined by the Engineer.
42.4. The value of work executed shall comprise the value of the quantities of the items in the Bill of
Quantities completed.
42.5. The value of work executed shall include the valuation of variations and compensation events.
42.6. The Engineer may exclude any item certified in a previous certificate or reduce the proportion of
any item previously certified in any certificate in the light of later information
43.1. Payments shall be adjusted for deductions for advance payments, retention, other recoveries in terms
of the contract and taxes at source, as applicable under the law. The Employer shall pay the
Contractor the amounts certified by the Engineer within 28 days of the date of each certificate.
43.2. Payment of GST (prevailing rates) on the amount payable under the contract to the Contractor will
be made by the Employer. Hence, it is the responsibility of the contractor to pay the GST to the
concerned Authority.
43.3. Items of the works for which no rate or price has been entered in will not be paid by the Employer
and shall be deemed covered by other rates and prices in the Contract.
Sr. No Milestone % amount of contract price
1 After successful supply of items on site 90%
2 After successful completion of first year of DLP 10%
44. Compensation events
44.1. The following are compensation Events unless they are caused by the Contractor:
(a) The Employer does not give access to a part of the Site by the site Possession date stated in
Contract Data to the Contractor
44.2. In case of compensation event occurs and it prevents the work being completed beyond the Intended
Completion Date then Authority will approve EOT with eligible contractual price escalation.
45.1. The rates quoted by the Contractor must be inclusive of all taxes prevailing on due date of bid
submission except GST. However, any subsequent changes in the tax structure by Government after
due date of bid submission will be compensated (+/-) on availability or submission of actual
documentation. Contractor will have to intimate Engineer regarding changes occurred in the tax
structure after bid submission. If the contractor fails to provide such information and if any financial
obligation may arise due to change in tax structure, same will be recovered from the contractor.
45.2. GST will be paid separately on the bills. Hence, it is the responsibility of the contractor to pay the
GST to the concerned Authority.
46. Currencies.
46.1. All payment shall be made in Indian Rupees.
47. Price Adjustment
47.1. Contract price shall be adjusted for increase or decrease in rates and price of labour, materials, fuels
and lubricants in accordance with the following principles and procedures and as per formula given
in the Contract Data:
(a) The price adjustment shall apply for the work done from the start date given in the Contract Data
up to end of the initial intended completion date or extensions granted by the Engineer and shall
not apply to the work carried out beyond the stipulated time for reasons attributable to the
(b) The price adjustment shall be determined during each month from the formula given in the
(c) Following expressions and meanings during to the work done during each month.
R = Total value of work done during the month. It would include the amount of secured advance
granted, if any, during the month less the amount of secured advance recovered, if any during
the month. It will exclude value for works executed under variations for which price
adjustment will be worked separately based on the terms mutually agreed.
47.2. To the extent that full compensation for any rise or fall in costs to the contractor is not covered by
the provisions of this or other clause in the contract, the unit rates and prices included in the contract
shall be deemed to include amounts to cover the contingency of such other rise or fall in costs.
48.1. The Employer shall retain from each payment due to Contractor the proportion stated in the Contract
Data until Completion of the whole of the Works.
48.2. On Completion of the whole of the Works half the total amount retained is repaid to the Contractor
48.2. On Completion of the whole of the Works half the total amount retained is repaid to the Contractor
and half when the Defects Liability Period has passed and the Engineer has certified that all Defects
notified by the Engineer to the Contractor before the end of this period have been corrected.
48.3. On completion of the whole works, the contractor may substitute retention money with an “on
demand” Bank guarantee.
In case, Contractor requests for refund of the Retention Money deducted by the Employer
under the provision of this clause, Employer shall consider the said request of the Contractor
provided that the refund hereunder shall be made in tranches of not less than 1% (One Percent) of
the Contract Price and Contractor furnishes an irrevocable and unconditional Bank guarantee for an
equal amount substantially in the format of Bank Guarantee for Performance Guarantee enclosed
with SBD and valid up to 60 day beyond the scheduled / extended Defects Liability Period. On
completion of the whole works, the contractor has however an option to submit a fresh irrevocable
and unconditional Bank Guarantee for an amount equal to 5% of the total value of work executed
substantially in the format of Bank Guarantee for Performance Guarantee enclosed with SBD and
valid up to 60 days beyond the Defect Liability Period and yet refund the Retention Money Bank
Guarantee submitted for refund of Retention Money.
49. Liquidated Damages
49.1. The Contractor shall pay liquidated damages to the Employer at the rate per day stated in the
Contract Data for each day that the Completion Date is later than the Intended Completion Date (for
the whole works or the milestone as stated in the Contract Data). The total amount of liquidated
the whole works or the milestone as stated in the Contract Data). The total amount of liquidated
damages shall not exceed the amount defined in the Contract Data. The Employer may deduct
liquidated damages from payment due to the Contractor. Payment of liquidated damages does not
affect the Contractor’s liabilities.
49.2. If the Intended Completion Date is extended after liquidated damages have been paid, the Engineer
shall correct any overpayment of liquidated damages by the Contractor by adjusting the next
payment certificate. The Contractor shall not be entitled for any interest on the over payment
calculated from the date of payment to the date of repayment.
49.3. If the contractor fails to comply with the time for completion as stipulated in the tender, then the
contractor shall pay to the employer the relevant sum stated in the Contract Data as Liquidated
damages for such default and not as penalty for everyday or part of day which shall elapse between
relevant time for completion and the date stated in the taking over certificate of the whole of the
works on the relevant section, subject to the limit stated in the Contract Data.
The employer may, without prejudice to any other method of recovery deduct the amount of
such damages from any monies due or to become due to the contractor. The payment or deduction
of such damages shall not relieve the contractor from his obligation to complete the works on from
any other of his obligations and liabilities under the contract.
49.4. If, before the Time for Completion of the whole of the Works or, if applicable any Section, a Taking
Over Certificate has been issued for any part of the Works or of a Section, the liquidated damages
for delay in completion of the remainder of the Works or of that Section shall, for any period of
delay after the date stated in such Taking-Over-Certificate, and in the absence of alternative
provisions in the Contract, be reduced in the proportion which the value of the part so certified bears
to the value of the whole of the Works or Section, as applicable. The provisions of this Sub-clause
shall only apply to the rate of liquidated damages and shall not affect the limit thereof.
50.1. If the contractor achieves completion of the whole of the works prior to the intended Completion
Date prescribed in Contract Data the Employer shall pay to the contractor a sum stated in Contract
Data as bonus for every completed month but subjected to maximum amount as stated in
Contract Data; which shall elapse between the date of completion of all items of works as stipulated
in the contract, including variations ordered by the Engineer and the time prescribed in Clause
50.2. Bonus shall be paid only to works amounting to above INR 5 crore with time limit of the works is
equal or more than 6 months. The bonus would be paid as under
% of Initial Contract
% of Time Saved Price entitled for
Less than 10% 0%
51. Advance Payment.
51.1. The Employer shall make advance payment (not to be paid less than two installments except in
special circumstances for which the reason to be Recorded in writing) to the Contractor of the
amounts stated in the Contract Date by the date stated in the Contract Date, against provision by the
Contactor of an Unconditional Bank Guarantee in a form and by a bank acceptable to the Employer
in amounts and currencies equal to be at least 110% of the advance payment. The guarantee shall
remain effective until the advance payment has been repaid, but the amount of the guarantee shall
be progressively reduced by the amounts repaid by the Contractor. The Mobilization advance would
be deemed as interest bearing advance at an interest rate of 10 % to be compounded, quarterly.
51.2. The Contractor is to use the advance payment only to pay for Equipment, plant and Mobilization
expenses required specifically for execution of the Works. The Contractor shall demonstrate that
advance payment has been used in this way by supplying copies of invoices or other documents to
51.3. The advance payment shall be repaid by deduction proportionate amount from payments otherwise
due to the Contractor, following the schedule of completed percentages of the Works on a payment
basis. No account shall be taken of the advance payment or its repayment in assessing valuations of
work done, variations, price adjustments, Compensation Events, or Liquidated damages.
52.1. The performance Security (including additional security for unbalanced bids) shall be provided to
the Employer no later than the date specified in the Letter of Acceptance and shall be issued in an
amount and form and by a bank or surety acceptable to the Employer, and denominated in Indian
Rupees. The performance Security shall be valid until a date 60 days from the date of expiry of
Defects Liability Period and the additional security for unbalanced bids shall be valid until a date
28 days from the date of issue of the certificate of completion.
Performance and Additional Performance Security shall become refundable/releasable within
days after project certified completion date subject to fulfillment of contractual obligation and
settlement of all dues and claims.
54. Cost of Repairs.
54.1. Loss or damage to the Works or Materials to be incorporated in the Works between the Start date
and the end of Defects Correction periods shall be remedied by the Contractor at the Contractor’s
cost if the loss or damages arises from the Contractor’s acts or omissions.
E. FINISHING THE CONTRACT
55.1. The Contractor shall request the Engineer to issue a Certificate of Completion of the works and the
Engineer will do so upon deciding that the work is completed.
56. Taking Over
56.1. The Employer shall take over the Site and the Works within seven days of the Engineer issuing a
certificate of Completion.
57. Final Account
57.1. The Contractor shall supply to the Engineer a detailed final account of the total amount that the
57.1. The Contractor shall supply to the Engineer a detailed final account of the total amount that the
Contractor considers payable as full and final settlement of all claims under the Contract for items
before the end of the Defects Liability Period. The Engineer shall issue a Defect Liability Certificate
and certify any final payment that is due to the Contractor within 56 days of receiving the
Contractor's account if it is correct and complete. If it is not, the Engineer shall issue within 56 days
a schedule that states the scope of the corrections or additions that are necessary. If the Final Account
is still unsatisfactory after it has been resubmitted, the Engineer shall decide on the amount payable
to the Contractor and issue a payment certificate, within 56 days of receiving the Contractor’s
revised account.
57.2. If reversal in characteristic of tender (L1 becoming L2) on account of excesses and savings in final
account is observed, the Engineer/Employer shall be at liberty to restrict the final payment of BOQ
items to the lowest amount evaluated of the bids considering the final quantities and the rates quoted
including the rebates if any. Payment of variation items shall however be made at the rates approved
by the Employer, within 90 days from the physical completion of work.
58. Operating and Maintenance Manuals
58.1. If “as built” drawings and/or operating and maintenance manuals are required, the Contractor shall
supply them by the dates stated in the Contract Data.
58.2. If the Contractor does not supply the Drawings and/or manuals by the dates stated in the Contract
Data, or they do not receive the Engineer’s approval, the Engineer shall withhold the amount stated
in the Contract Data from payments due to the Contractor.
59. Termination
59.1. The Employer or the Contractor may terminate the Contract if the other party causes a fundamental
breach of the Contract.
59.2. Fundamental breaches of Contract include, but shall not be limited to the following:
(1) The contractor stops work for 28 days when no stoppage of work is shown on the current
programme and the stoppage has not been authorized by the Engineer
(2) The Engineer instructs the Contractor to delay the progress of the Works and the instructions is
not withdrawn within 28 days;
(3) The Employer or the Contractor is made bankrupt or goes into liquidation other than for a
reconstructions or amalgamation
(4) A payment certified by the Engineer is not paid by the Employer to the Contractor within 56 days
of the date of the Engineer’s certificate
(5) The Engineer gives Notice that failure to correct a particular Defect is a fundamental breach of
Contract and the Contractor fails to correct it within a reasonable period of time determined by
(6) The Contractor does not maintain a security which is required;
(7) The Contractor has delayed the completion of works by the number of days for which the
maximum amount of liquidated damages can be paid as defined in the Contract Data; and
(8) If the Contractor, in the judgment of the Employer has engaged in corrupt or fraudulent practices
in competing for or in executing the Contract.
For the purpose of this paragraph: “corrupt practice” means the offering, giving, receiving or
soliciting of anything of value to influence the action of a public official in the procurement process
or in contract execution. “Fraudulent practice” means a misrepresentation of facts in order to
influence a procurement process or the execution of a contract to the detriment of the borrower, and
includes collusive practice among Bidders (prior to or after bid submission) designed to establish
bid prices at artificial non-competitive levels and to deprive the Borrower of the benefits of free and
open competition.
59.3. When either party to the Contract gives notice of a breach of contract to the Engineer for a cause
other than those listed under Sub Clause 59.2 above, the Engineer shall decide whether the breach
is fundamental or not.
59.4. Notwithstanding the above, the employer may terminate the Contract for convenience.
60. Payment upon Termination
60.1. If the Contract is terminated because of a fundamental breach of Contract by the Contractor, the
Engineer shall issue a Certificate for the value of the work done less advance payments received up
to the date of the issue of the certificate, less other recoveries due in terms of the contract, less taxes
due to deducted at source as per applicable law and less the percentage to apply to the work not
completed as indicated in the Contract Data. Additional Liquidated Damages shall not apply. If the
total amount due to the Employer exceeds any payment due to the Contractor the difference shall
total amount due to the Employer exceeds any payment due to the Contractor the difference shall
be a debt payable to the Employer.
60.2. If the Contract is terminated at the Employer’s convenience or because of a fundamental breach of
Contract by the Employer, the Engineer shall issue a certificate for the value of the work done, the
cost of balance material brought by the contractor and available at site, the reasonable cost of
removal of equipment, repatriation of the Contractor’s personnel employed solely on the works, and
the Contractor’s cost of protecting and securing the Works and less advance payment received up
to the date of the certificate, less other recoveries due in terms of the contract and less taxes due to
deducted at source as per applicable law.
61.1. All materials on the Site, Plant Equipments, Temporary Works and Works are deemed to be property
of the Employer, if the Contract is terminated because of a Contractor’s default.
62. Release from Performance
62.1. If the Contract is frustrated by the outbreak of war of by any other event entirely outside the control
of either the Employer or the Contractor the Engineer shall certify that the Contract has been
frustrated. The Contractor shall make the Site safe and stop work as quickly as possible after
receiving this certificate and shall be paid for all work carried out before receiving it and for any
work carried out afterwards to which commitment was made.
F. SPECIAL CONDITIONS OF CONTRACT
The Contractor shall, unless otherwise provided in the Contract, make his own arrangements
for the engagement of all staff and labour, local or other, and for their payment of housing, feeding
The Contractor shall, if required by the Engineer, deliver to the Engineer a return in detail, in
such form and at such intervals as the Engineer may prescribe, showing the staff and the numbers
of the several classes of labour from time to time employed by the Contractor on the site and such
other information as the Engineer may require.
64. COMPLIANCE WITH LABOUR REGULATIONS
During continuance of the contact, the Contractor and his sub- contractor shall abide at all
times by all existing labour enactments and rules made thereunder, regulations, notification and bye
laws of the State or central Government or local authority and any other labour law (including rules),
regulations, bye laws that may be passed or notifications that may be issued under any labour law
in future either by the State or the Central Government or the local authority. Salient features of
some of the major labour laws that are applicable to the construction industry are given below. The
Contractor shall keep the Employer indemnified in case any action is taken against the Employer by
the competent authority on account of contravention of any of the provisions of any Act or rules
made thereunder, regulations or notifications including amendments. If the Employer is caused to
pay or reimburse, such amounts as may be necessary to cause or observe, or for observance of the
provisions stipulated in the notifications/bye laws/Acts/Rules/regulations including amendments, if
any, on the part of the Contractor, the Engineer/employer shall have the right to deduct any money
due to the Contractor including his amount of performance security. The Employer/Engineer shall
also have the right to recover from the Contractor any sum required or estimated to be required for
making good the loss or damage suffered by the Employer.
The employees of the Contractor and the Sub-Contractor in no case shall be treated as the
employees of the Employer at any point to time.
SALIENT FEATURES OF SOME MAJOR LABOUR AND OTHER LAWS APPLICABLE TO
ESTABLISHMENTS ENGAGED IN BUILDING AND OTHER CONSTRUCTIONS WORK
A) Workmen Compensation Act 1923:-
The Act provides for compensation in case of injury by accident arising out of and during the course
B) Payment of Gratuity Act. 1972:-
Gratuity is payable to an employee under the Act on satisfaction of certain conditions on separation
if an employee has completed 5 years’ service or more on death, the rate of 15 days wages for every
completed year of service. The Act is applicable to all establishments employing 10 or more
C) Employees P.F. and Miscellaneous Provision Act 1952:-
The Act Provides for monthly contributions by the employer plus workers @ 10% or 8.33%.
The benefits payable under the Act are:
1. Pension or family pension on retirement or death, as the case may be.
2. Deposit linked insurance on the death in harness of the worker.
3. Payment of P.F. accumulation on retirement/death etc.
D) Maternity Benefit Act 1951 :-
The Act provides for leave and some other benefits to women employees in case of confinement or
miscarriage etc.
E) Contract Labour (Regulation & Abolition) Act 1970:
The Act provides for certain welfare measures to be provided by the Contractor to contract labour
and in case the Contractor fails to provide, the same are required to be provided, by the Principal
Employer by Law. The principal Employer is required to take Certificate of Registration and the
Contractor is required to take license from the designated Officer. The Act is applicable to the
establishments or Contractor of Principal Employer, if they employ 20 or more contract labour.
F) Minimum Wages Act 1948 :-
The Employer is supposed to pay not less than the Minimum Wages fixed by appropriate
Government as per provisions of the Act, if the employment is a scheduled employment.
Construction of Building, Roads, and Runways are scheduled employment.
G) Payments of wages Act 1936:-
It lays down as to by what date the wages are to be paid, when it will be paid and what deductions
can be made from the wages of the workers.
H) Equal remunerations Act 1979 :-
The Act provides for payment of equal wages for work of equal nature to Male and Female workers
and for not making discrimination against female employees in the matter of transfer, training and
promotions etc.
I) Payments of Bonus Act 1965:-
The Act is applicable to all establishments employing 20 or more employees. The Act provides for
payments of annual bonus subject to a minimum of 8.33% of wages and maximum of 20 % of wages
to employees drawing Rs. 3500/- per month or less. The bonus to be paid to employees getting Rs,
2500/- per month or above Rs. 3500/- per month shall be worked out by taking wages as Rs. 2500/-
per month only. The Act does not apply to certain establishments. The newly set-up establishments
are exempted for five years in certain circumstances. Some of the State Governments have reduced
the employment size from 20 to 10 for the purpose of applicability of this Act.
J) Industrial Disputes Act 1947 :-
The Act lays down the machinery and procedure for resolutions of Industrial disputes, in what
situations a strike or lock-out becomes illegal and what are the requirements for laying off or
retrenching the employees or closing down the establishment.
K) Industrial employment (standing Orders) Act 1946 :-
It is applicable to all establishments employing 100 or more workmen (employment size reduced
by some of the State and Central Government to 50). The Act provides for laying down rules
governing the conditions of employment by the Employer on matters provided in the Act and get
the same certified by the designated Authority.
L) Trade Unions Act 1926:-
The Act lays the procedure for registration of trade unions of workmen and employers. The Trade
Unions registered under the Act have given certain immunities from civil and criminal liabilities.
M) Child Labour (Prohibition & Regulation Act 1986 :-
The Act prohibits employment of children below 14 years of age in certain occupations and process
and provides for regulation of employment of children in all other occupations and processes.
Employment of Child labour is prohibited in Building and Construction Industry.
N) Inter – State Migrant workmen’s (Regulation of Employment & Conditions of service) Act
The Act is applicable to an establishment which employs 5 or more inter-state migrant workmen
through an intermediary (who has recruited workmen in one state for employment in the
establishment situated in another state).The inter-state migrant workmen, is an establishment to
which this Act becomes applicable, are required to be provided certain facilities such as housing,
medical aid, traveling expenses from home up to the establishment and back, etc.
O) The Building and Other Construction workers (Regulation of employment and Conditions of
Service) Act 1996 and the Cess Act of 1996:-
All the establishments who carry on any building or other constructions work and employ 10 or
more workers are covered under this Act. All such establishments are required to pay cess at the
rate not exceeding 2% of the cost of construction as may be modified by the government. The
Employer of the establishment is required to provide safety measures at the Building or construction
work and other welfare measures, such as canteens, First Aid facilities, Ambulance, Housing
accommodations for workers near the workplace etc. The Employer to whom the Act applies has to
obtain a registration certificate from the Registering Officers appointed by the Government.
P) Factories Act 1948 :-
The Act lays down the procedure for approval of plans before setting up a factory, health and safety
provisions, welfare provisions, working hours, annual earned leave and rendering information
regarding accidents or dangerous occurrences to designated authorities. It is applicable to premises
employing 10 persons or more with aid of power or 20 or more persons without the aid of power
engaged in the manufacturing process.
Q) Royalty charges –
The contractor shall pay the royalty to the competent authority as per rule. The royalty charges paid
shall be borne by the contractor and shall not be reimbursed by the Employer.
R) Following Pollution control Acts and amendments made thereof from time to time shall be
1. Water (Preservation and control of Pollution) Act,
2. Air (Prevention and Control of Pollution Act1981
3. Environmental (Protection) Act
The contractor must commit to adopting Environmental management plan for best energy use,
waste management, the reduction of pollution as in EMS (Environmental Management system) ISO-
65. ARBITRATION (GCC Clause 24)
The procedure for arbitration will be as follows: -
24.1 If the Contractor is of the view that a decision taken by the Engineer was either outside the authority
given to the Engineer by the Contract or that the decision was wrongly taken, the decision shall be
referred to Superintending Engineer, Electrical and Mechanical Circle, Vadodara (Higher
Authority) within 14 days of the notification of the Engineer's decision. If the issue is not resolved,
any party can refer the matter for conciliation within 15 days from the decision given by the
Superintending Engineer.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with the decision of the
Superintending Engineer, Electrical and Mechanical Circle, Vadodara, both the parties have
to refer to the concerned Chief Engineer, Electrical and Mechanical, Vadodara for the
conciliation process.
(b) For the work more than Rs.100 Cr., if any of the parties is not satisfied with the decision of the
Superintending Engineer, both parties have to refer to the Sardar Sarovar Narmada Nigam
H.O., Block No. 12, Gandhinagar, Government of Gujarat for the conciliation process.
If the dispute is not resolved through the conciliation process, contractor may refer the dispute
to Gujarat Public Works Contract Dispute Arbitration Tribunal. If the Contractor fails to refer a
claim / dispute to the Higher Authority within 14 days of the notification of the Engineer's decision,
the Contractor shall not be entitled to any additional payment/claim if he doesn’t follow the above
sequence in stipulated time. However, during such period, he would not stop the work in any case.
THIS PAGE HAS BEEN KEPT BLANK
THIS PAGE HAS BEEN KEPT BLANK
Item marked “N/A” do not apply to this Contract. With respect
1. The Employers is [CL.1.1]
Name: Executive Engineer, Electrical & Mechanical Division, Ekta
Address: 519, 5th floor, Administrative Building, Ekta Nagar, Dist-
Email id: [email protected]
Name of authorized Representative (will be intimated later)
2. The Engineer is - will be intimated later
Name of Authorized Representative: …………..
3. The Defects Liability Period is 1 year from the date of completion. [CL.1.1 & 33]
4. The Start Date shall be 1st days for the date of issue of the Notice to [CL.1.1]
proceed with the work.
5. The Intended Completion Date for the whole of the works is 01 years [CL.1.1, 17 &
after start of work with the following milestones: 2]
Physical works to be completed Period from the start date
Milestone1 i.e. 25% …. Days
Milestone2 i.e. 50% …. Days
Milestone3 i.e. 75% …. Days
Milestone4 i.e. 100 % …. Days
6. The Site is located at Ektanagar, Ta- Garudeshwar, Dist-Narmada, [CL.1.1]
7. The name and identification number of the Contract [CL.1.1]
8. The works consist of items as per B.O.Q. The works shall, inter alia, [CL.1.1]
include the following, as Specified or as directed:
Site clearance; setting out and Layout Construction and
Maintenance of all types of dams and its component, earthen dam;
spillway; installation of gate; excavation and earth work, approach
road, Inspection Bunglows, checkdams, bandhara, T.R., weir,
barrages, Flood Protection & Anti Sea Erosion work, canal lining
and structures, , CD Works, structure repairing, Jungale cutting,
Desilting, etc. other WRD works.
Site clearance; setting – out and layout; widening of existing
carriageway and strengthening including camber corrections;
construction of new road/ Parallel service road; bituminous
pavements remodeling/construction of Junctions, intersections,
bus bays, lay-bays; supplying and placing of drainage Channels,
flumes, guard posts and guard other related items;
construction/extension of cross drainage works, bridge, approaches
and other related stones; protective works for roads/bridge; all
aspects of quality assurance of various components of the works;
rectification of The defects in the completed works during the
Defects Liability Period; submission of “As- built’’ drawings and
any other related documents; and other item of work as may be
required to be carried out for completing the work in accordance
with the drawings and the provisions of the contract and to ensure
(C) Bridge Works
provision of foundations, piers abutments and bearing;
prestressed/reinforced cement concrete superstructure; wearing
coat, hand railings, expansion joints, approach slabs, drainages
spouts/ down take pipes, arrangements for fixing light posts, water
mains, utilities etc.; provision of suitably designed protective
works; providing wing/return walls; provision of road markings,
road signs etc.; all aspects of quality assurance; clearing the site
and handing over the works on completion; rectification of the
defects during the Defects Liability Period and submission of “As-
built” drawings and other related documents; and other items of
work as may be required to be carried out for completing the works
in accordance with the drawings and the provisions of the contract
and to Insure safety.
(D) Other Items
Any Other Items as required to fulfill all contractual obligations as per
the Bid documents.
10. The following documents also form part of the Contract: [CL.2.3(9)]
11. The law which applies to the Contract is the law of Union of India [CL.3.1]
12. The language of the Contract documents is English [CL.3.1]
13. Limit of subcontracting 25% of the Initial Contract Price [CL.7.1]
14. The Schedule of Other Contractors [CL.8]
15. The Schedule of Key Personnel As per Annex – II to Section I [CL.9]
16. The minimum insurance cover for physical property, injury and death [CL13]
is Rs. 5 lakhs per occurrence with the number of occurrences limited
to four. After each occurrence, the contractor will pay an additional
premium necessary to make insurance valid for four occurrences
17. Site Investigation report [CL.14]
18. The Site Possession dates shall be as per availability of site. [CL.21]
19. The period for submission of programme for approval of the engineer [CL. 27.1]
shall be 21 days from the issue of Letter of Acceptance.
20. The period between program updates will be ……. days [CL. 27.3]
21. The amount to be withheld for late submission of an updated [CL. 27.3]
programme shall be Rs. …….Lacs
22. The following events shall also be Compensation Events Substantially [CL. 44]
adverse ground conditions encountered during the course of execution
of work not provided for in the bidding document.
(i) Removal of underground utilities detected subsequently
(ii) Significant changes in classification of soil requiring additional
mobilization by the contractor, e.g. ordinary soil to rock
(iii) Removal of unsuitable material like marsh, debris dumps, etc.
not caused by the contractor.
(iv) Artesian conditions
(v) Seepage, erosion landslide
(vi) River training requiring protection of permanent work
(vii)Presence of historical, archeological or religious structures,
monuments interfering with the works
(viii)Restriction of access to ground imposed by civil, judicial, or
military authority
23. The currency of the Contract is Indian Rupees [CL. 46]
24. The formula (e) for adjustment of prices are as under: [CL.47]
If any of the commodities like Cement, Steel or Bitumen are not found
applicable in a work, the weight component of that commodities {i.e.
‘Cement’ (Pc), ‘Steel’ (Ps) or ‘Bitumen' (Pb) as indicated in SBD for
the purpose of Price Adjustment} shall be clubbed with the weight
component of ‘Other Material’ (Pm), such that the gross % weight of
the components shall remain as 100%.
R = value of work as defined in Clause 47.1 of Conditions of Contract
Adjustment for labour component
(i) Price adjustment for increase or decrease in the cost due to
labour shall be paid in accordance with the following
VL = Increase or decrease in the cost of work during the month
under consideration due to changes in rates for local
L0 = The consumer price index for industrial workers for the
State on 28 days preceding the scheduled date of opening
of technical Bids as published by Labour Bureau,
Ministry of Labour, Government of India
Li = The consumer price index for industrial workers for the
State for the month under consideration as published by
the Labour Bureau, Ministry of Labour, Government of
Pl = Percentage of labor component of the work.
Adjustment for cement component.
(ii) Prices adjustment for increase or decrease in the cost of
cement procured by the contractor
Vc= Increase or decrease in the cost of work during the month
under consideration due to changes in rates for cement.
C0 = The all India wholesale price index for Ordinary Portland
Cement on 28 days preceding the scheduled date of
opening of technical bid as published by the Office of the
Economic Adviser, Department for Promotion of
Industry and Internal Trade, Ministry of Commerce
Ci= The all India average wholesale price index for Ordinary
Portland Cement for the month under consideration as
published by Office of the Economic Adviser,
Department for Promotion of Industry and Internal
Trade, Ministry of Commerce & Industry.
Pc = Percentage of cement component of the work
Adjustment for steel component
(iii)Price adjustment for increase or decrease in the cost of steel
procured by the contractor shall be paid in accordance with
the following formula
Vs= Increase or decrease in the cost of work during the month
under consideration due to changes in the rates for steel
So= The all India wholesale price index for steel (Mild Steel
- Long Products Rebars) on 28 days preceding the date
of opening of Bids as published by the Office of the
Economic Adviser, Department for Promotion of
Industry and Internal Trade, Ministry of Commerce
Si= The all India average wholesale price index for steel (Mild
Steel - Long Products Rebars) for the month under
consideration as published by Office of the Economic
Adviser, Department for Promotion of Industry and
Internal Trade, Ministry of Commerce & Industry.
Ps = Percentage of steel component of the work
Note : For the application of this clause, the index of Mild Steel-
Long products Rebars has been chosen to represent the
Adjustments of bitumen component
(iv) Price adjustment for increase in the cost of bitumen shall be
paid in accordance with the following formula
Vb = Increase or decrease in the cost of work during the month
under consideration due to changes in rates for bitumen.
Bo = The official retail price of bitumen at the IOC depot at
the nearest center on the day 28 days prior to the
scheduled date of opening of technical bid.
Bi= The official retail price of bitumen of IOC depot at the
nearest center :
For the first 15 days of the month under
consideration, the price declared on the 1st day of
For the remaining days of the month under
consideration, the rate declared on the 16th day of
Pb = Percentage of bitumen component of the work
Adjustment of POL (fuel and lubricant) component
(v) Price adjustment for increase or decrease in cost of POL (fuel
and lubricant) shall be paid in accordance with the following
Vf = Increase or decrease in the cost of work during the month
under consideration due to changes in rates for fuel and
Fo = The official retail price of High Speed Diesel (HSD) at
the existing consumer pumps of IOC at the nearest center
on the day 28 prior to the date of opening of Bids.
Fi= The official retail price of HSD at the existing consumer
pumps of IOC at the nearest center for the 15th day of the
month of the under consideration.
Pf = Percentage of fuel and lubricants component of the work
Note: For the application of this clause, the price of High-Speed
diesel Oil has been chosen to represent the fuel and
lubricants group.
Adjustment for Construction Machinery
(vi) Price adjustment for increase or decrease in the cost of plant
and Machinery spare procured by the Contractor shall be paid
in accordance with the following formula
Vp= Increase or decrease in the cost of work during the month
under consideration due to changes in rates for plant and
machinery spares
P0 = The all India wholesale price index for manufacturer of
machinery for mining, quarrying and Construction
for the month under consideration as published Office of
the Economic Adviser, Department for Promotion of
Industry and Internal Trade, Ministry of Commerce
Pi= The all India average wholesale price index for
manufacturer of machinery for mining, quarrying
and Construction for the month under consideration as
published Office of the Economic Adviser, Department
for Promotion of Industry and Internal Trade,
Ministry of Commerce & Industry.
Pp= Percentage of plant and machinery spares component of
Note: For the application of this clause, index of Heavy
Machinery and parts has been chosen to represent the
Plant and Machinery Spares group.
Adjustment of other materials Component
(vii) Price adjustment for increase or decrease in cost of local
materials other than cement, steel, bitumen and POL procured
by the contractor shall be paid in accordance with the
following formula
Vm = Increase or decrease in the cost of work during the
month under consideration due to change in rates for local
materials other than cement, steel, bitumen and POL.
M0 = The All Indian wholesale price index (all commodities)
on 28 days preceding the scheduled date of opening of
technical Bids, as published by the Office of the
Economic Adviser, Department for Promotion of
Industry and Internal Trade, Ministry of Commerce
Mi= The All India wholesale price index (all commodities) for
the month under consideration as published by the Office
of the Economic Adviser, Department for Promotion
of Industry and Internal Trade, Ministry of
Commerce & Industry.
Pm = Percentage of local material components (other than
cement, steel, bitumen and POL) of the work.
The following percentage will govern the price adjustment
for the entire contract:
1. Labour -Pl 35.00%
2. Cement – Pc 0.00%
3. Steel - Ps 0.00%
4. Bitumen – Pb 0.00%
6. Plant & Machinery Spares Pp 55.00%
7. Other Materials - Pm 10.00%
Total = 100.00%
25. The proportion of payments retained (retention money) shall be 6% [CL. 48]
from each bill subject to a maximum of 5% of final contract price.
26. Amount of Liquidated damages for For Whole of work [CL.49]
delay in completion of works (1/2000)th of the Initial contract price,
rounded off to the nearest Thousand, per day.
For sectional Completion (wherever
specified In item 6 of Contract data)
(1/2000)th of initial contract price for #5 km
Section, rounded off to the nearest thousand
27. Maximum limit of liquidated damages 10 percent of the Initial [CL.49]
For delay in completion work Contract Price rounded off to the nearest
28. Amount of Bonus for early completion Amount of bonus for early completion of
work shall be given as per CL.50 of Section-
29. Maximum limit of bonus for early 5 percent of the Contract [CL.50] Price
Completion of work
30. The amount of the advance payment are [CL. 51 & 52] N/A
#Nature of Advances Amount (Rs.)
i. 10% of the On submission of
contract unconditional Bank
Price Guarantee. (to be drawn
before the end of 20% of
the contract period). The
contractor may furnish
four bank guarantees of
2.5 % of each valid for the
ii. 90% for new After equipment is
and 50% of brought to site
depreciated (provided the Engineer
value for old is satisfied That the
equipment. equipment is required
Total amount for performance of the
Total amount for performance of the
will be subject contract) and on
to a maximum submission of
unconditional Bank
of 5% of the Guarantee for amount
Contract Price of advance
Advance for Non-perishable
material Brought to site
(The advance payment will be paid to the Contractor no later than 28 days after fulfillment of
the above conditions)
31. Repayment of advance payment for mobilization and [CL. 51.3]
The advance loan shall be repaid with percentage deduction from
the interim payments certified by the Engineer under the Contract.
Deduction shall commence in the next Interim Payment Certificate
following that in which the total of all such payments to the
Contractor has reached not less than 20 percent of the Contract Price
or 6 (six) months from the date of payment of first installment of
advance, whichever period concludes earlier, and shall be made at
the rate of 20 percent (collectively for both Mobilization Advance
and Equipment Advance)of the amounts of all Interim Payment
Certificate until such time as the loan has been repaid, always
provided that the loan shall be completely repaid prior to the expiry
of the original time for completion pursuant to Clause 17 and
33. The securities shall be for the following minimum amounts [CL. 52]
As a percentage of the Contract Price:
Performance Security for 5 percent of contract price plus Rs.
…………….. (to be decided after evaluation of the bid) as additional
security in terms of ITB Clause 29.5.
The standard form of Performance security acceptable to the
Employer shall be an unconditional Bank Guarantee of the type as
presented in Section 8 of the Bidding Documents.
34. The Schedule of Operating and maintenance Manuals…... [CL. 58]
35. The date by which “as– built” drawings (in scale as directed) in 2 [CL. 58]
sets {CL. 58} are required within 28 days of the issue of certificate
of completion of the whole or section of the work, as the case may
36. The amount to be withheld for failing to supply “as built” [CL. 58]
drawings by the Date required is Rs. ……….. Lakhs.
37. The following events shall also be fundamentals breach of [CL. 59.2]
“The Contractor has contravened Sub- clause 7.1 and Clause 9 of
38. The percentage to apply the value of the work not completed [CL. 60]
representing the Employer’s additional cost for completing the
Works shall be 20 per cent.
TECHNICAL SPECIFICATION
THIS PAGE HAS BEEN KEPT BLANK
Name of work- Supply of Different types of spares for Operation & Maintenance of different electrification
work with one year of defect liability period on as and when required basis at Ekta Nagar
Scope of work include the supply of Air conditioners, Geysers of various capacity, Cables of different
sizes, Single side neon flex and SMPS to operate the neon flex etc. as per bill of quantity on as and
when required basis.
Bidder shall supply of items from the the List of Approved Electrical Products.
The contractor has to submit the item make list with rating of electrical items & equipments under this
contract and got approved from the Engineer In Charge before supplying of materials.
In case of emergency requirements, the contractor shall arrange supply within the period directed by
the Engineer-in-Charge.
The items to be supplied shall conform to the specifications, Relevant IS/BIS standard and approved
makes specified in the below list of appved Electrical products.
SSNNL reserves the right to reject any material not conforming to the approved specifications, ap-
proved make, relevant IS/BIS standards or tender requirements.
Any rejected, damaged, defective or non-conforming material shall be removed from the SSNNL
premises and replaced by the contractor at his own cost.
Trasnportation, loading-unloading,labours,Proper Packing and protection of material during the trans-
portation etc., are in the scope of the bidder. No any additional cost will be paid for the same.
The supplied items must be of the suitable size so that the items can be installed at the required loca-
Bidder can do site visit before submitting their bid at their own cost.
Bidder shall be bound to follow the safety procedure while designing/supply of all Electrical items &
Equipments as per Government norms.
Bidder shall be bound to supply standard materials and maintain work quality for execution of work.
There is a possibility that there might be significant increase / decrease in the amount of work item
quantity owing to the site conditions or instructions of the Engineer In Charge
The supplier shall carry out the entire work in the best workmanship like manner.
Contractor shall follow all the labour laws or amendment as per the government norms.
Contractor has to submit the test certificate at time of supply.
Contractor has to submit purchase proof from OEM or OEM authorized dealer at the time of
SSNNL may verify the authenticity of the supplied material with the concerned OEM/manufac-
Contractor is bound to render any technical assistance, clarifications and guidance, on technical prob-
lems if needed relating to the electrical installations supplied by the contractor.
Payment shall be paid as per actual material supplied at site.
Contractor has to supply material at SSNNL Store, Ekta Nagar.
Ratings / specifications and make of the electrical equipment’s and items shall be finalized before the
All special tools/manpower required for unloading of the materials is in scope of Contractor as obli-
gation under the contract.
Contractor has to submit the Guarantee / Warranty Certificate along with supply.
Guarantee / Warranty period:
If the supplied items are found defective due to Manufacturing defect, bad design/ materials or
poor workmanship the same should be repaired or replaced by contractor at free of cost, if reported
within 12 months from supply.
Security Deposit (SD) should be valid for full guarantee period and SD shall be valid for
The Bidder shall coordinate with the OEM/manufacturer for warranty-related defects and shall
ensure replacement/rectification of defective items during the warranty period without addi-
tional cost to the SSNNL, wherever the defect is covered under warranty.
Cables should conform to relevant IS standards IS
Cables should be 2 core, 3 core, 3.5 core and 4 core as per Bill of quantites.
Scope of work includes supply of DWC (Double walled corrugated) Polyethylene Pipes with neces-
sary connecting accessories of same material.
DWC Pipes should conform to IS 14930 II and be suitable for the specified depth and load conditions.
Properly package materials to prevent damage during transportation, Mark packages with relevant
information (i.e, material type, size, length.)
All Cables and Pipes must be ISI MARKED Positively.
The persons of the agency shall be covered by the Rules and Regulations of the SSNNL to carry out
the work, which may change from time to time and they should follow the instructions given by the
nominated officers of the SSNNL from time to time.
The agency shall abide by all the rules and regulations, codes and conducts of the employer’s laid
down by the Government from time to time.
Any SSNNL property damage by the agency then the agency is responsible for making good as before.
The cost of damage items and repair of such damage will be recovered from the agency.
Scope of work includes Supply of 24V DC, IP 65 or above Single side colored neon flex for installing
at the Circuit house, Cactus Garden, SoU Signage, Vishva van etc. (Color – Blue, Cool White, Red,
Green, Yellow, Pink, Orange etc. as per site requirement), Supply of SMPS(Driver) on as and when
required basis.
The agency shall submit relevant BIS certification/licence, applicable LM-79/LM-80 test re-
ports, IP test report/certificate and manufacturer's technical datasheet for the Neon Flex/LED
system and SMPS/driver, as applicable.
The LED light source used shall be from reputed standard manufacturers such as Cree, ams
OSRAM, Nichia, Lumileds or Seoul.
List of Approved Electrical Products
CABLE RR KABEL, HAVELLS, FINOLEX,
DWC PIPES GEMINI, DURALINE, REX
LED STREET LIGHT PHILIPS, G.E, OSRAM, WIPRO,
BAJAJ, CGL, HAVELLS,
WATER HEATERS / RACOLD, A.O.SMITH,VENUS
AIR CONDITIONERS MISTUBISHI, O-GENERAL
REFRIGERATOR LG, VOLTAS, BLUE STAR
CONDENSER FOR CEILING BAJAJ, USHA, HAVELLS,
FAN, EXHAUST FAN, CROMPTON, ORIENT
PEDESTAL FAN & TABLE
FAN REGULATOR SCHEIDER ELECTRIC, HAVELLS,
PEDESTAL FAN & EXHAUST BAJAJ, USHA, HAVELLS,
FAN CROMPTON, ORIENT
THIS PAGE HAS BEEN KEPT BLANK
THIS PAGE HAS BEEN KEPT BLANK
Description of the Works:
1. We offer to execute the Works described above and remedy any defects therein in conformity with
the conditions of Contract, specification, drawings, Bill of Quantities and Addenda for the sum (s)
2. We undertake, if our Bid is accepted, to commence the Works as soon as is reasonably possible after
the receipt of the Engineer’s notice to commence, and to complete the whole of the Works in the
Contact within the time stated in the document.
3. We agree to abide by this Bid for the period of 120 Days from the date fixed for receiving the same,
and it shall remain binding upon it and may be accepted at any time before the expiration of that
4. Unless and until a formal Agreement is prepared and executed this Bid, together with your written
acceptance thereof, shall constitute a binding contract between us.
5. We understand that you are not bound to accept the lowest or any tender you may receive.
------- duly authorized to sign bids for and on behalf of -----------------------------------
(in block capitals or typed)
BILL OF QUANTITIES
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 R1 AC tender (1).pdf
CORRIGENDUM NO 1.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .