Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.9 LAccepted-AOC B 43 CIVIL LINES 1ST FLOOR NAYAPURA KOTA RAJASTHAN 324001 UDYAM RJ 24 0019224 08ABKPA3675N1Z9 R M | KOTA | RAJASTHAN | 324001 | 1 | Accepted-AOC L1 | |
| 2 | 2₹10.1 L+₹19,496.99 (1.96%)Rejected-AOC H NO 159 VILL AND P O BHAUWALA NEAR S N PUBLIC SCHOOL RAJAWALA ROAD DEHRADUN UTTARAKHAND 248007 | DEHRADUN | UTTARAKHAND | 248007 | 2 | Rejected-AOC L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical GURGAON | GURUGRAM | HARYANA | 122001 | - | Not Admitted-Fee/PreQual/Technical Others-EMD AND TENDER FEE NOT SUBMITTED |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
14 Jun 2023, 6:00 pmClosed
SE O AND M CIRCLE DDUN
SE O AND M CIRCLE YAMUNA COLONY DDUN
Work of AMC Preventive of 220 KV Jhajhra Khodri Line 220 KV Chibro Khodri I Line 220 KV Chibro Khodri II Line 132 KV Jhajhra Kulhal Line and 132 KV Jhajhra Dhalipur Lines
2023_PTCUX_58563_1
T 08 SE O and M CR D Dun 2023 24
Open Tender
Electrical Works
Item Rate
365 days
WORK
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE O AND M DIVISION PTCUL YAMUNA COLONY DDUN
₹30,000
3 Aug 2023
16 May 2023
16 Jun 2023
16 May 2023
14 Jun 2023
16 May 2023
Amount
Work of Patrolling of 220kV Jhajhra - Khodri line (Tower to Tower) for one year, and submitting the Patrolling Report in prescribed Performa to related Sub Division four times in a year. Clearance of Patrolling Path by cutting & removing thorned bushes etc below the line in dense forest area & removing the same away from the 35 meter wide gallery. Checking Points during patrolling are as per site requirements and as per JE/AE Incharge.
Lopping and Chopping of tree branches near & under the gallery of 220kV Jhajhra - Khodri Line from the 35 metre wide gallery of the line safely with rope for the safety of line conductors and to minimise future trippings.
Work of Patrolling of 220kV Chibro Khodri line I (Tower to Tower) for one year, and submitting the Patrolling Report in prescribed Performa to related Sub Division four times in a year. Clearance of Patrolling Path by cutting & removing thorned bushes etc below the line in dense forest area & removing the same away from the 35 meter wide gallery. Checking Points during patrolling are as per site requirements and as per JE/AE Incharge.
Lopping and Chopping of tree branches near & under the gallery of 220kV Chibro Khodri Line I from the 35 metre wide gallery of the line safely with rope etc for the safety of line conductors and to minimise future trippings.
Work of Patrolling of 220kV Chibro Khodri line II (Tower to Tower) for one year, and submitting the Patrolling Report in prescribed Performa to related Sub Division four times in a year. Clearance of Patrolling Path by cutting & removing thorned bushes etc below the line in dense forest area & removing the same away from the 35 meter wide gallery. Checking Points during patrolling are as per site requirements and as per JE/AE Incharge.
Lopping and Chopping of tree branches near & under the gallery of 220kV Chibro Khodri Line II from the 35 metre wide gallery of the line safely with rope etc for the safety of line conductors and to minimise future trippings.
Work of Patrolling of 132 kV Jhajhra Kulhal Line (Tower to Tower) for one year, and submitting the Patrolling Report in prescribed Performa to related Sub Division four times in a year. Clearance of Patrolling Path by cutting & removing thorned bushes etc below the line in dense forest area & removing the same away from the 27 meter wide gallery. Checking Points during patrolling are as per site requirements and as per JE/AE Incharge.
Lopping and Chopping of tree branches near & under the gallery of 132kV Jhajhra - Kulhal Line from the 27 metre wide gallery of the line safely with rope etc for the safety of line conductors and to minimise future trippings.
Work of Patrolling of 132 kV Jhajhra Dhalipur Line (Tower to Tower) for one year, and submitting the Patrolling Report in prescribed Performa to related Sub Division four times in a year. Clearance of Patrolling Path by cutting & removing thorned bushes etc below the line in dense forest area & removing the same away from the 27 meter wide gallery. Checking Points during patrolling are as per site requirements and as per JE/AE Incharge.
Lopping and Chopping of tree branches near & under the gallery of 132kV Jhajhra - Dhalipur Line from the 27 metre wide gallery of the line safely with rope etc for the safety of line conductors and to minimise future trippings.
Note:- The Contractor will provide 06 person team (01 number Supervisor, 02 number skilled lineman and 03 number semiskilled labour) along with 01 number Jeep at 220KV Substation, Jhajhra, Dehradun. All the required T&P and it's transporation will be provided by the contractor.
MSN CONSTRUCTION COMPANY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .