Loading…
Loading…
Tender Value
₹74.5 L
EMD Value
₹75,000
Closing Date
29 Jul 2026, 6:00 pmClosed
Executive Engineer, Sauni Yojana Division, Rajkot
THIRD-PARTY INSPECTION/PROJECT MANAGEMENT AGENCY FOR THE SERVICES OF PROJECT MANAGEMENT, CONSTRUCTION, SUPERVISION AND DESIGN REVIEW INSITE/OFFSITE INSPECTION & TESTING OF MATERIALS, MACHINERY, EQUIPMENTS, REVIEW OF QAP FOR PROVIDING IRRIGATION WATER FOR FILLING OF VARIOUS PONDS (34-VILLAGES) OF WANKANER TALUKA OF DISTRICT-MORBI THROUGH PIPELINE BY LIFTING WATER FROM L3P3 (NEAR L3P3 PUMPING STATION) INCLUDING SUPPLYING AND LAYING M.S AND H.D.P.E. PIPELINE OF DIFFERENT DIA WITH ALL ALLIED WORKS ETC.
323797
SBD-07 of 2026
Open
Miscellaneous Works
Works
Rajkot
18 documents required · 18 mandatory
₹2,400
Executive Engineer, Sauni Yojana Division, Rajkot
₹75,000
14 Jul 2026
14 Jul 2026
14 Jul 2026
29 Jul 2026
14 Jul 2026
Addenda/Amendments to the above, for the INSPECTION SERVICES OF THE ABOVE WORK,
we the undersigned offer our inspection services from the date of commissioning including
defects liability period as given in Conditions of Contract and in conformity with the
Schedules, Annexure, Bidding Documents, including Addendum Nos. _____________ (insert
numbers) for Lump Sum fixed price mention in the summary cost. Our financial proposal shall
be fixed and firm binding upon us subject to the modifications resulting from contract
negotiations up to expiration of the validity period of the proposal. The amount of consultancy
services is inclusive of all taxes, duties, service charges etc.
2. We undertake, if our Bid is accepted, to complete and deliver the Works in accordance with
the Contract within 24 months or till the Project Implementation period, inclusive of
monsoons, from the date of receipt of work order to us by you. We will observe the laws
applicable to perform the services.
3. We agree to abide by this Bid for a period of 120 days from of opening of online Bid the date
fixed for receiving the same and it shall remain binding upon us and may be accepted at any
time before the expiry of that Period.
4. In the event of our Bid being accepted, we agree to enter into a formal Contract Agreement
with you incorporating the conditions of Contract thereto annexed and conditions of form “C”
but until such agreement is prepared this Bid together with your written acceptance thereof
shall constitute a binding Contract between us.
5. We agree, if our Bid accepted, to furnish Performance Bond / Security in the forms and of
value specified in the Conditions of Contract of a sum equivalent to Rs. 7.452 Lakh for due
performance of the Contract.
6. We understand that you are not bound to accept the lowest or any Bid you may receive.
(Name of the person)
(In the capacity of)
Duly authorized to sign Bid for and on behalf of
(Fill in block capitals)
The bid is lump sum bid for DRAFT TENDER PAPER FOR THE WORK OF THIRD-PARTY
INSPECTION/PROJECT MANAGEMENT AGENCY FOR THE SERVICES OF PROJECT MANAGEMENT,
CONSTRUCTION, SUPERVISION AND DESIGN REVIEW INSITE/OFFSITE INSPECTION & TESTING
OF MATERIALS, MACHINERY, EQUIPMENTS, REVIEW OF QAP FOR PROVIDING IRRIGATION
WATER FOR FILLING OF VARIOUS PONDS (34-VILLAGES) OF WANKANER TALUKA OF DISTRICT-
MORBI THROUGH PIPELINE BY LIFTING WATER FROM L3P3 (NEAR L3P3 PUMPING STATION)
INCLUDING SUPPLYING AND LAYING M.S AND H.D.P.E. PIPELINE OF DIFFERENT DIA WITH ALL
ALLIED WORKS ETC.
The bidder shall quote his firm and fixed lump sum price for the entire work under this
Contract, defined in more details in various sections of this bid document & form “C” of Lump
1. The rates and prices shall be submitted in the formats given in the enclosed Price
Schedules. Rates and prices received in any other formats will be rejected and the Bids
will be disqualified.
2. It will be entirely at the discretion of the NWRWS & KD to accept or reject the bidder’s
proposal, without giving any reasons whatsoever and the bidder shall not be permitted
to withdraw his bidon this account.
in Schedule only will be considered for price evaluation & shall form a part of the
Contract Agreement.
4. Each item is to be individually priced and the amounts shall be added up to arrive at
blank except where the item description requires the item to be priced on "as
applicable" basis. The item shall not be priced if it is "not applicable" to the bidder's
design, in which case the bidder shall add the words "NOTAPPLICABLE". The wording
in the item description is for subject matter guidance only: clause references are
indicative only and all other relevant clauses shall also be referred to. The prices shall
allow for all the works covered under the bid and all liabilities and contractual
obligations whether separately specified or not. Items against which no prices are
quoted shall not be separately paid for and the bidder shall be deemed to have covered
the cost for execution of such items (according to the requirements of the bid
document) in the prices quoted for the other items.
satisfactory working of the system as specified, will not be separately paid for by the
NWRWS & KD when executed and shall be deemed to be already covered by other
items and rates listed in the price sheets and Lump sum prices quoted in Schedule.
6. Interim payment will be made as per break up given in the Price document.
Schedules shall be the basis to work out a schedule of Interim payments during
construction with the successful bidder.
8. The Consultant shall be deemed to have allowed in his price for provision,
maintenance and final removal of all temporary works of whatsoever nature required
for the inspection services for the proper execution of works. The rates shall be
deemed to include any works and setting out that may be required to be carried out for
laying out of all the works involved.
9. Prices shall be entered online and shall be entered in figures and in words. Where
there is a discrepancy between the unit rates and the amount entered, the latter shall
Specifications and the other sections of these bid documents and these documents are
to be taken as mutually explanatory of one another.
11. Prices quoted by the Consultant shall be firm for the entire consultancy work of
Contract without any escalation or extra payment than tendered cost. The Quoted
price should be match with Annexure E and COST SUMMARY SCHEDULE.
12. The Consultant shall interpret the data furnished if any additional survey work or
investigation required shall be carried out by EPC Contractor.
13. The Consultant should acquaint himself with the site conditions including the access to
Work site. The successful bidder shall have to make suitable access to work sites at his
own cost. These accessed will be used by the other contractors working for NWRWS &
KD/ Government.
COST SUMMARY SCHEDULE
FORM OF FINANCIAL PROPOSAL
4.0 Summary of costs (Lump - sum fix price)
Description of Services Amount in Rs. lacs
In Figure In words
DRAFT TENDER PAPER FOR THE WORK OF
THIRD-PARTY INSPECTION/PROJECT
MANAGEMENT AGENCY FOR THE SERVICES OF
PROJECT MANAGEMENT, CONSTRUCTION,
SUPERVISION AND DESIGN REVIEW
INSITE/OFFSITE INSPECTION & TESTING OF
MATERIALS, MACHINERY, EQUIPMENTS,
Rupees seventy four
REVIEW OF QAP FOR PROVIDING IRRIGATION
1 Rs. 74,50,400.00 lakhs fifty thousand
WATER FOR FILLING OF VARIOUS PONDS (34- four hundred only
VILLAGES) OF WANKANER TALUKA OF
DISTRICT-MORBI THROUGH PIPELINE BY
LIFTING WATER FROM L3P3 (NEAR L3P3
PUMPING STATION) INCLUDING SUPPLYING
AND LAYING M.S AND H.D.P.E. PIPELINE OF
DIFFERENT DIA WITH ALL ALLIED WORKS ETC.
General Manager ````` Authorized person of Inspecting Firm.
Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Division
Construction Inspection of materials Post Construction
Pre Design Review &
Supervision & allied machineries and Activities & Defect Total
Construction Approval
activities equipment Correction Period
Title Minimum experience required
Remunerati Remunerati Remunerati Remunerati Remunerati Remunerati
Requirem Duration Duration Duration Duration Duration
on per on per on per on per on per on per
ents in engageme engagement( engagemen engagemen engageme Months Total
month,(allin month,(alli month,(alli month,(alli month,(allin month,(allin
Project nt(Days) Days) t(Days) t(Days) nt(Days)
clusive) nclusive) nclusive) nclusive) clusive) clusive)
Part-A(Personals)
Graduate In Civil / Mechanical engineering with over 15 years’ experience
in M.S. / Steel pipeline project monitoring of water supply projects,
preferably having design/office experience and having handled projects
of similar nature.
2 Senior Structural Engineer Master's degree in Structural Engineering with 10 years of Experience
Graduate Mechanical engineer with over 10 years’ experience in design &
3 Senior Mechanical Engineer inspection of pipe manufacturing, valve and instrument etc.
Water Supply & Pipeline Graduate in Hydraulics/Civil/ Mechanical Engineering with over 10 years of
4 experience of similar nature.
Graduate Instrumentation Engineer with over 3 year experience in design
5 Instrumentation Engineer and inspection of pumping machineries etc.
Graduate Civil / Mechanical engineer /B.Sc with over 10 years’ experience
6 Safety Engineer as Safety Engineer.
Graduate with over 2 years of experience or diploma with over 5 years’
7 Site Supervision Staff experience of site pipeline work of similar nature.
(ii) Mechanical (Mini. Two Engineer should have ASNT level-II in UT(PAUT)
as per SNT-TC-1A OR ASNT Level III in UT
8 Legal Advisor
9 Financial Analyst
10 Additional Staff
B.C.A. with 1 year experience
Computer Operator
Surveyor Diploma Civil with minimum of 2 years of Experience of experience or
ITI Surveyor having 2 years of experience
Office Assistant B.A. / B.Com
ROU Supervisor Experience in ROU or similar nature of work
Part-B(Other Expanses)
1 TRANSPORTATION(i) Two wheeler
TRANSPORTATION(ii) Four wheeler
2 COMMUNICATION L.S.
3 OFFICEEXPANCESINCLUDINGRENTANDOTHEROVERHEADS L.S.
4 STATIONERYEXPANCESINCLUDINGALLCONSUMABLES L.S.
5 Any other expenses if any L.S.
GST , other prevailing
Schedule of Payment
The breakup of consultancy services shall be as under:
Sr. L.S. quoted
Name of activity Amount in Rs.
A Pre contract activity 2%
B Design Review / Approval 10 %
Construction supervision
& allied activity
Inspection of the material,
D machineries and
Post construction & defect 10 %
correction activity
Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Division
Schedule of Payment
A. Pre-construction Activity:2 % of quoted price
Total Amount: _________________
Total Amount: _________________
Percentage to be
Particulars released of total amount
Particulars released of total amount
On submission of review report on 10%
On submission of methodology &
work plan with pert chart &
required formats of various
progress report
On setting out for project with
3 required facility at site with 60%
deployment of staff
On review of working survey &
setting out the lineout of the work
5 Any other matter require to perform 10%
Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Division
Schedule of Payment
B. Design Review / Approval:10 % of quoted price
Total Amount: _________________
Total Amount: _________________
Percentage to be
Particulars released of total
B1 On approval of G.A. 20 %
On approval of structural drawing of End 10%
structure & Road crossing, etc.
Design of pipe line, Thrust block,
Supporting 70 %
structure, Valve chambers, Surge devices if
Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Division
C. Construction & Supervision, scrutiny of design & allied activity
of work: 50% of quoted price
Total Amount: ________________
Total Amount: ________________
Further Break up of Activities for pipe line
Percentage to be
Sr. No Particulars released
of total amount
of total amount
C - A.1 MS/HDPE Pipeline work 50 %
C - A.2 Mechanical work 30 %
C - A.3 RCC Work 5%
C - A.4 Instrumentation work 5%
C - A.5 After Finalization of ROU 10 %
Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Division
Further Breakup of above activity C
C-A.1 Pipeline work:50 % of C-A Amount: ____________
Particulars to be Amount in Rs
Inspection, Transportation and 15 % of C-
inside & outside coating of pipe A1
Excavation, bedding, lowering,
laying &jointing by welding of 40 % of C-
pipeline including manifold and A1
joint with trunk main
3 Ultrasonic Test
4 Inside & outside joint coating
6 Refilling & other items
1. The amount is to be paid on running meter basis. Per meter rate is to be arrived
by dividing the total length of transmission main. Payment is to be made as per
progress of work done. The hydro test payment is to be made after carrying out
2. The Contractor shall submit the copy of attendance sheet for the period of Signed
by competent authority of department.
Note. The Contractor shall submit the copy of attendance sheet for the period of Signed
by competent authority of department.
Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Division
C-A.2 Mechanical Items: 30 % of C Amount: ___________
Percentage to be
Sr. No Particulars released Amount in Rs
1 On erection of B.F. valves 15% of C-A.2
2 On erection of Air valves 20% of C-A.2
On erection of Scour &
miscellaneous devices.
commissioning of Pipeline
Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Division
C-A.3 RCC work: 5 % of C-A Amount: ____________
Sr. Percentage to be
Particulars Amount in Rs.
1 Setting Out 15 % of C-A3
2 Work up to ground level 30 % of C-A3
3 Work up to plinth level 30 % of C-A3
4 On completion of work 25 % of C-A3
Total 100 % of C-A3
Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Division
C-A.5 After Finalization of ROU: 10 % of C Amount: ___________
Sr. Percentage to
Particulars Amount in Rs
1 After Finalization of ROU 100 % of C-A.5
Total 100% of C-A.5
Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Division
D. Inspection of material, machineries and equipment: 28 %quoted
Total Amount: _________________
Total Amount: _________________
Sr. No . Particulars Percentage to be Amount in Rs.
D-1 Inspection of MS/HDPE 40 % of quoted
Pipeline amount for D
D-2 Inspection of valves 25 % of Quoted
water control hammer amount for D
devices related to
D-3 Inspection of other 25 % of quoted
Mechanical equipment. amount for D
D-4 Instrumentation & Material 10% of quoted
Note: The Consultant shall submit the copy of inspection report.
Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Division
D-4 Inspection of Mechanical Equipments:25 % of D Amount:
(MECHANICAL& PERCENTAGE OF QUOTED
INSTRUMENTATION of Pipeline) AMOUNT
1. Butterfly valve (P.H. valves) 20 % of quoted amount
2. Sluice valves 20% of quoted amount
3. Air valves 40 % of quoted amount
4. Remaining Miscellaneous 20 % of quoted amount
Items (Surge Equipment, Expansion
Manifold, etc.)
Total Total 100 % of quoted amount
Note: the amount is to be paid on basis of quantities of mechanical and
instrumentation items.
Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Division
E. Post Construction Activity & Defect Correction Activity: 10 % of quoted
Price Total Amount: __________________
Price Total Amount: __________________
Schedule of Payment
(a) Post Correction Activity: 25 % of E Amount_____________
Sr. No . Particulars Percentage to be Amount in Rs.
1 After Completion of testing 95 % of E (a)
during commissioning Stage
2 After clearing and tiding of sites 5 % of E (a)
by the contractor to complete &
carry out all works required to
finalize the construction contract
administratively
Total 100 % of E (a)
(b) Defect Correction Activity: 25 % of E Amount: ___________
Sr. No Particulars Percentage to be Amount in Rs.
1 On completion of outstanding 25 % of E(b)
work at time of taking over
2 After rectification of any defect 25 % of E(b)
observed during the running of
3 Proportionate payment to be 25 % of E(b)
made during defect liability period
4 After end of defect liability Period 25 % of E(b)
Total 100 % of quoted
(c) ROU Activity: 50 % of E Amount: ___________
Sr. No Particulars Percentage to be Amount in Rs.
1 On completion of ROU Payment as per 100 % of E(c)
all Govt. Section
Total 100 % of quoted
Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
vol - 1 Pre Qualification and technical Proposal.pdf
Vol - 2 Financial Bid - Price bid TPI.pdf
Vol.-3 Technical Bid TPI.pdf
5. F Vol-2 Part-2C Form TPI.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .