| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹81.6 LAccepted-AOC | 1 | Accepted-AOC Accept | |
| 2 | 2₹86.0 L+₹4.5 L (5.46%)Rejected-AOC | 2 | Rejected-AOC Reject |
Tender Value
₹99.2 L
EMD Value
₹50,000
Closing Date
15 Jul 2024, 5:00 pmClosed
BaijuT P
Forest Industries Travancore Limited , Aluva
Construction of pond
2024_FITL_679773_1
FIT/CP-04/2024-25
Open Tender
Civil Works - Others
Item Rate
540 days
KADALUNDI, KOZHIKKODE
Refer Tender Document
8 documents required · 8 mandatory
₹2,950
₹50,000
Forest Industries Travancore Limited Thaikkattukar
1 Aug 2024
8 Jul 2024
16 Jul 2024
8 Jul 2024
15 Jul 2024
8 Jul 2024
8 Jul 2024 - 11 Jul 2024
10 Jul 2024
Amount
BEAUTIFICATION OF KAVUKULAM POND
od28461/2024_2025 : Clearing the Jungle and the Waste deposit inside the pond. The Sludge, debris and slurry shall be removed with continuous dewatering. The Sludge or slurry shall be removed with floating excavator or any other means and depositing the same with a lead of 1 Km from the location as directed by the engineer in charge.
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
50.2.25.1 : Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
16.79 : Providing , laying spreading and compacting graded stone aggregate ( size range 53 mm to 0.075 mm) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub - base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer - in- Charge.
15.3 : Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
SABANI ENGINEERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .