| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.3 LAccepted-AOC | L1 | Accepted-AOC Commitee approved rates as L1 | |
| 2 | L2₹23.3 L+₹1.2 L (5.56%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹23 L
EMD Value
₹23,000
Closing Date
5 Dec 2023, 3:00 pmClosed
SE EUDC
35-B RAMPUR GARDEN BAREILLY
ELECTRICAL WORK UNDER EUDD-III BAREILLY
2023_MVVNL_861561_1
T-103/EUDCB/2023-24
Open Tender
Electrical Works
Item Rate
60 days
EE EUDD-III BAREILLY
AS PER TENDER FORM
3 documents required · 3 mandatory
₹3,540
SE EUDC
₹23,000
8 Aug 2024
11 Nov 2023
5 Dec 2023
11 Nov 2023
5 Dec 2023
11 Nov 2023
Amount
For the work of Replacement of Jarjar & damaged AB Cable in the areas of Koharapeer , Civil Lines-3 & Sahadana S/s under EUDD-III, Bareilly for system strengthening for providing uninterrupted 24*7 power supply under the head of AIIB SCHEME ( B.P. 2023-2024).
The work of safe carriage of the following material from CB Ganj store center to work site under the jurisdiction of EUDD-III Bareilly Including safe loading and unloading.
ABC (3X120X+1X 95+1X16) sqmm.
03 Phase Distribution Box
LT SHACKLE INSULATOR (100*115)
Piercing Connector
PG Clamps for Distribution Box
LT Clamps
Erection Work
Laying & Sagging of ABC (3X120X+1X 95+1X16) sqmm.
Erection of 03 Phase Distribution Box alongwith making all connections
Erection & Fixing of LT SHACKLE INSULATOR (100*115)
Piercing Connector
PG Clamps for Distribution Box
LT Clamps
For the work of Guarding of 11 KV Lines in the different areas of EUDD-III, Bareilly for system strengthening for providing uninterrupted 24*7 power supply under the head of AIIB SCHEME ( B.P. 2023-2024).
The work of safe carriage of the guarding materials from CB Ganj store center to work site under the jurisdiction of EUDD-III Bareilly Including safe loading and unloading.
Erection Work
Guarding work of 11 KV Lines including work mounting of Guarding angle and stringing of Guarding wire after binding of string, complete in all respect.
Providing and fixing of Eye Bolts .
For the work of Replacement of damaged Pole / additional Pole for 33 KV Lines & 11 KV Lines of different S/s under EUDD-III, Bareilly for system strengthening for providing uninterrupted 24*7 power supply under the head of AIIB SCHEME ( B.P. 2023-2024).
The work of safe carriage of the following material from CB Ganj store center to work site under the jurisdiction of EUDD-III Bareilly Including safe loading and unloading.
New PCC Pole (8.5 Meter Long)
New ST Pole (9.0 Meter Long)
New ST Pole (13 Meter Long)
03 Phase Distribution Box with clamps.
Other associated materials .
Erection Work
Erection of 13 Meter Long ST Pole including digging of pit, & grouting work complete and fitting of all accessories complete for 33 KV Lines .
Erection of 9 Meter Long ST Pole including digging of pit, & grouting work complete and fitting of all accessories complete for 11 KV Lines .
Erection of 8.5 Meter Long PCC Pole including digging of pit, & grouting work complete and fitting of all accessories complete for 11 KV Lines
Earthing of Pole by MS Earthing rod .
For the Work of Construction of 02 Nos. New LT 250 KVA S/S, (at Near Rahguveer Dyala Chakki on 11 KV IVRI Feeder & Baccho Wala Kabristaan on 11 KV Joginaawda Feeder) of under EUDD-III, Bareilly for system strengthening for providing uninterrupted 24*7 power supply under the head of AIIB SCHEME ( B.P. 2023-2024).
The work of safe carriage of the following material from CB Ganj store center to work site under the jurisdiction of EUDD-III Bareilly Including safe loading and unloading.
New S.T. Pole 11 Meter long.
ACSR Weasel Conductor.
New 250 KVA T/F
LT XLPE Cable (1400 sqmm)
3-Phase Distribution Box with clamps
Other associated materials
Erection Work
Erection of S.T. Transformer D / Pole including digging of pit & grouting work complete and fitting of all accessories complete
Earthing of Poles .
Erection of Stay set complete with grouting
Construction of plinth complete (2.0x2.0x1.5) meter, by providing first class Bricks work as per RESPO norms. (Material will be supplied by Contractor
The work of fabrication /construction and grouting of wire mesh fencing of 16 meter running length/as per site requirement in rectangular shape height 2 meter with angle size of 45x45x05 m.m including gate at one side as per RESPO norms. (Material will be supplied by Contractor).
Erection of 250 KVA T/F on plinth by laying of cable ,Jumpering & commissioning of T/F .
Earthing of distribution T/F upto water level with GI Pipe of 1.5" Dia. Including mild steel strip size 35x6 mm. (Material will be supplied by Contractor).
Stringing and sagging ACSR weasel conductor
Laying & Fixing of LT Xlpe Cable (1x400 sqmm).
Erection and fixing 3-phase Distribution Box and making all Connections
Providing and Fixing of Tell-Less Unit (500 Amp.)
Providing and Fixing Al. lugs (for 400 sqmm.)
Providing and Fixing Piercing Connector
For the Work of Increasing Capacity of 250 KVA to 400 KVA Distribution T/F( Mukhiya, MB Inter College, Near Nawada Shekhan, Nera Rikkhi Singh School , Near M. Khan 2 & Near Shahdana P10) of Different Capacity under EUDD-III Bareilly for system strengthening for providing uninterrupted 24*7 power supply under the head of AIIB SCHEME ( B.P. 2023-2024)..
The work of safe carriage of the following material from CB Ganj store center to work site under the jurisdiction of EUDD-III Bareilly Including safe loading and unloading.
New 250 KVA T/F
LT XLPE Cable (1x630 sqmm)
Erection Work
Dismantling of old 250 KVA T/F from site and Back Carriage from site to E.S.CS store C.B Ganj including loading & unloading
Erection of new 400 KVA T/F on Plinth by laying of cable ,Jumpering & commissioning of T/F
Chemical Earthing of distribution T/F for body & neutral (Material will be supplied by Contractor).
Providing and Fixing of Tell-Less Unit (500 Amp.)
Providing and Fixing Al. lugs (for 630 sqmm.) Cable
Construction of plinth complete (2.0x2.0x1.5) meter, by providing first class Bricks work as per RESPO norms. (Material will be supplied by Contractor
The work of fabrication /construction and grouting of wire mesh fencing of 16 meter running length/as per site requirement in rectangular shape height 2 meter with angle size of 45x45x05 m.m including gate at one side as per RESPO norms. (Material will be supplied by Contractor).
For the Work of replacement/upgrading of High Loss LT Conductor at various places under Different Capacity in the different area of under EUDD-III, Bareilly for system strengthening for providing uninterrupted 24*7 power supply under the head of AIIB SCHEME ( B.P. 2023-2024)..
The work of safe carriage of the following material from CB Ganj store center to work site under the jurisdiction of EUDD-III Bareilly Including safe loading and unloading.
ABC (3X120X+1X 95+1X16) sqmm.
03 Phase Distribution Box with Clamps
Other Line materials.
Erection Work
Laying & Sagging of ABC (3X120X+1X 95+1X16) sqmm
Erection of 03 Phase Distribution Box alongwith making all connections
Supply & Fixing of piercing connector
Supply & Fixing of PG Clamps
M/S RAHAT & BROTHERS ELECTRICALS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .