| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹1.2 CrRejected-Finance | ₹1.2 Cr | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | P P ABDUL KABEER L2 | MAHSHOOK M. L1 |
|---|---|---|---|---|---|
| 1.00Drainage work | |||||
| 1.00 | 2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means | 78.96 | cum | 847.31 ₹66,903.60 | 803.1 ₹63,412.78 |
| 1.00 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m) | 734.25 | cum | 69.67 ₹51,155.20 | 66.03 ₹48,482.53 |
| 1.00 | OD261426/2025-2026:Filling up low laying and water logged area with Granular material , spreading in layers ,leveling top at site and consolidation by ramming etc for improving CBR value of subgrade. | 469.6 | cum | 1,849.63 ₹8.7 L | 1,753.12 ₹8.2 L |
| 1.00 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 201.38 | cum | 7,773.72 ₹15.7 L | 7,368.14 ₹14.8 L |
| 1.00 | 12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br> | 10.5 | cum | 8,995.5 ₹94,452.75 | 8,526.17 ₹89,524.79 |
| 1.01 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 37.75 | MT | 1,06,350.03 ₹40.1 L | 1,00,801.34 ₹38.1 L |
| 1.01 | 12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork) | 135.38 | cum | 9,394.07 ₹12.7 L | 8,903.95 ₹12.1 L |
| 1.01 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer | 419.44 | cum | 9,769.83 ₹41.0 L | 9,260.1 ₹38.8 L |
| 1.01 | OD261427/2025-2026:Bailing out water using 5HP engine and pump set including conveyance to site and
erection, cost of fuel , lubrication oil and other stores, pay of staff etc complete.(60.2.2 irrigation OD) | 50 | hour | 502.8 ₹25,140 | 476.57 ₹23,828.50 |
Tender Value
₹1.1 Cr
EMD Value
₹50,000
Closing Date
5 Feb 2026, 2:00 pmClosed
Office of the Superintending Engineer, PWD Roads ,
The Superintending Engineer, PWD, Roads , North Circle, Kozhikode
GENERAL Providing leading drain collecting water from Feroke chungam farook college road and achankulam towards thodu drain bet Ch 0/000 and 0/470 General Civil Work
2026_PWD_831440_1
PWD/RB/TR/23857/2025_5_1_1/1
Open Tender
Civil Works - Roads
180 days
Kozhikode
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,515
Yes
₹50,000
Yes
2 Mar 2026
28 Jan 2026
7 Feb 2026
28 Jan 2026
5 Feb 2026
28 Jan 2026
Drainage work
2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
OD261426/2025-2026:Filling up low laying and water logged area with Granular material , spreading in layers ,leveling top at site and consolidation by ramming etc for improving CBR value of subgrade.
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br>
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
OD261427/2025-2026:Bailing out water using 5HP engine and pump set including conveyance to site and erection, cost of fuel , lubrication oil and other stores, pay of staff etc complete.(60.2.2 irrigation OD)
OD261566/2025-2026:Wrought iron and mild steel welded work (Using angles square bars, tees and channel grills, grating frames, gates and tree quads of any size and design etc including cost and screens and welding rods or bolts and nuts complete fixed in position but without the cost of excavation and concrete for fixing which will be paid separately(derived from 11.18)
OD261567/2025-2026:OD Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/return wall with 75 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1397010.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 1.64 MB
Download all tender documents and submit your bid