Loading…
Loading…
Tender Value
₹7.0 L
EMD Value
₹17,600
Closing Date
20 Jun 2026, 6:30 pmClosed
Similar tender results from the same govt authority in the past 3 years.
EXECUTIVE ENGINEER, TDB, MAVELIKKARA
OFFICE OF THE EXECUTIVE ENGINEER, TDB, MAVELIKKARA-690101
Kanatharkunnam Devaswom In Karunagappally Group-Maintenance To The Damaged Anakottil (Recast Estimate) Reg RETENDER
2026_TDB_854635_2
EEM/ET-37/2026-27
Open Tender
Repair and Maintenance Works
60 days
Mavelikkara
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,711
₹17,600
17 Jun 2026
17 Jun 2026
22 Jun 2026
17 Jun 2026
20 Jun 2026
17 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1.01 | Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | - | M3 | 3,671.89 | - | BI01010001010000000000000515BI0100001113 |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | M3 | 9,235.97 | - | BI01010001010000000000000515BI0100001114 |
| 1.03 | 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | - | M2 | 369.76 | - | BI01010001010000000000000515BI0100001115 |
| 1.04 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes | 1 | kg | 194.27 | ₹194.08 | BI01010001010000000000000515BI0100001116 |
| 1.05 | Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 0.8 | kg | 182.51 | ₹145.83 | BI01010001010000000000000515BI0100001117 |
| 1.06 | Supplying and fixing M P (Mangalore pattern) roofing Tiles 410 mm X 235 mm or nearest available. | - | M2 | 596.48 | - | BI01010001010000000000000515BI0100001118 |
| 1.07 | Roofing with 400 mm or nearest available size M P hip & ridge tiles first class set in C M 1:4 including finishing the edges. | 1 | Mtr | 340.55 | ₹340.21 | BI01010001010000000000000515BI0100001119 |
| 1.08 | Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface | - | M2 | 139.96 | - | BI01010001010000000000000515BI0100001120 |
| 1.09 | Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) | - | M2 | 209.26 | - | BI01010001010000000000000515BI0100001121 |
| 1.1 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | - | M2 | 357.38 | - | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
priliminaryagreement.pdf
Tender Documents • 0.32 MB
07.pdf
Tender Documents • 0.58 MB
BOQ_1447536.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid