Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
10 Dec 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
TRD
15 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnover of V or V/N crore, whichever is less; were V= Advertised value of the tender in crore of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet
The tenderer must have successfully completed or substantially completedany one of the following categories of work(s) during last 07 (seven) years,ending last day of month previous to the one in which tender is invited:(i) Three similar works each costing not less than the amount equal to 30% ofadvertised value of the tender, or(ii) Two similar works each costing not less than the amount equal to 40% ofadvertised value of the tender, or(iii) One similar work costing not less than the amount equal to 60% of advertisedvalue of the tender.
10 conditions · 9 needing a document upload
At the time of submission of bid, if you have any special Condition then upload in scanned pdf copy.
Please furnish list of personal, organization available on hand and proposed to be engaged for the subject work.
Please furnish list of plant and Machinery available on hand own and proposed to be inducted own and hired to be given separately for the subject work.
Please furnish list of Works completed in last Seven years (Ending last day of month previous to the one in which tender is invited) giving Description of Work, Organization for whom executed, approximate value of contract at time of award, Date of award and Date of Completion. Date of actual Start, Actual Completion and Final value of Contract shall also be given.
Please furnish list of works on hand indicating description of works, contract value, Approximate value of balance work yet to be done and date of award.
Please furnish list of works on hand indicating description of works, contract value, Approximate value of balance work yet to be done and date of award.
Tenderer has to submit attested copy of valid electrical contractor's license, which can be in his own name or in the name of his firm issued by any as per Clause 31 of compilation of Regulation of CEA2023 or as amended from time to time. They shall keep valid license throughout the period of execution of work by getting it renewed at suitable intervals and submit an attested copy of the same to the Railways.
The tenderer whether sole proprietor/ a company or a partnership firm / joint venture (JV) / registered society / registered trust/HUF/ LLP etc. if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person specifically authorizing him/them to sign the tender, submit the tender, and further to deal with the Tender/Contract up to the stage of signing the agreement except in case where such specific person is authorized for above purposes through a provision made in the partnership deed/ Memorandum of understanding/ Article of Association/ Board resolution, failing which tender shall be summarily rejected.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderer has to submit attested copy of valid electrical contractor's license, which can be in his own name or in the name of his firm issued by any as per Clause 31 of compilation of Regulation of CEA2023 or as amended from time to time. They shall keep valid license throughout the period of execution of work by getting it renewed at suitable intervals and submit an attested copy of the same to the Railways.
OHE Modification, Slewing and Re-Slewing Works in Connection with Regirdering, Replacement of Existing Steel Girder Bridges by RCC Boxes, Provision of PSC Slabs in Lieu of Steel Girders and Providing Additional Openings at Various Locations in Rajkot Division.
DRM-RJT-EL-TRD-2026-27-26~WR
DRM-RJT-EL-TRD-2026-27-26
Open
Works - General
8 Months
Rajkot, Gujarat
₹0
₹2.8 L
12 Nov 2026
12 Nov 2026
26 Nov 2026
194 items across 6 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 73,88,004.14 | ||
| — | 1.00 | — | — | ||
| Survey, Design and preparation of OHE layout plan and SED as per technical specifications | — | — | — | 18,051.95 | |
| — | 15.00 | — | — | ||
| Supply of fabricated galvanised steel structure and SPS as per technical specifications | — | — | — | 21,82,810.5 | |
| — | 15.00 | — | — | ||
| Erection of fabricated galvanised steel structure and SPS as per explanatory notes | — | — | — | 1,97,532.3 | |
| — | 75.00 | — | — | ||
| Concrete for foundation and plinth in all types of soil incl. hard/ rocky soil (incl. excavation and supply of materials viz. cement, sand and ballast) | — | — | — | 5,83,520.25 | |
| — | 20.00 | — | — | ||
| Supply of Single cantilever assembly complete with insulator as per technical specifications. | — | — | — | 5,48,053.6 | |
| — | 20.00 | — | — | ||
| Erection of cantilever/Bracket assembly complete with insulators as per explanatory notes | — | — | — | 62,673.2 | |
| — | 3.00 | — | — | ||
| Supply of regulating equipment 3 pulley type complete with all accessories as per technical specifications | — | — | — | 1,86,350.25 | |
| — | 3.00 | — | — | ||
| Erection of Regulating equipment 3 pulley type complete with all accessories as per technical specifications and explanatory notes. | — | — | — | 43,003.23 | |
| — | 20.00 | — | — | ||
| Supply of new droppers complete with clips etc. for the new span for modification and shifting of OHE to new structure/cantilever as per technical specifications | — | — | — | 1,01,028.8 | |
| — | 20.00 | — | — | ||
| Modification and shifting of OHE to new structure, removal of old droppers and erection of new droppers as per explanatory notes. | — | — | — | 1,22,523.8 | |
| — | 1.00 | — | — | ||
| Supply of section insulator assembly including core and cut in insulator as per technical specifications | — | — | — | 65,083.46 | |
| — | 1.00 | — | — | ||
| Erection of Section insulator assembly including core and cut in insulator as per explanatory notes | — | — | — | 7,652 | |
| — | 3.00 | — | — | ||
| Supply of material for termination of Double conductor (including supply of 9 ton cut in insulator) as per technical specifications | — | — | — | 45,378.21 | |
| — | 3.00 | — | — | ||
| Erection of material for termination of Double conductor (including supply of 9 ton cut in insulator) as per explanatory notes | — | — | — | 6,883.62 | |
| — | 5.00 | — | — | ||
| Supply of Guy Rod assembly complete as per technical specification for high rise OHE | — | — | — | 57,003 | |
| — | 5.00 | — | — | ||
| Erection of Guy Rod assembly complete as per explanatory notes for high rise OHE | — | — | — | 11,205.75 | |
| — | 10.00 | — | — | ||
| Supply of 9 ton cut in insulator as per technical specifications. | — | — | — | 73,123.5 | |
| — | 3.00 | — | — | ||
| Erection of 9 tonne cut in insulator as per explanatory notes. | — | — | — | 3,282.3 | |
| — | 10.00 | — | — | ||
| Supply of Post/Support insulator as per technical specifications | — | — | — | 1,09,139.4 | |
| — | 100.00 | — | — | ||
| Supply of various types of jumpers with fittings as per technical specifications | — | — | — | 2,69,267 | |
| — | 1.00 | — | — | ||
| Supply of anti-creep arrangement as per technical specifications | — | — | — | 42,210.92 | |
| — | 1.00 | — | — | ||
| Erection of anti-creep arrangement as per explanatory notes | — | — | — | 5,868.46 | |
| — | 0.50 | — | — | ||
| Erection of overhead equipment including catenary, contact, jumper and dropper wires, fixing of number plates and various types of board as per explanatory notes | — | — | — | 40,233.54 | |
| — | 500.00 | — | — | ||
| Supply of all types of galvanized bonds as per technical specifications | — | — | — | 1,64,830 | |
| — | 500.00 | — | — | ||
| Erection of all types of galvanized bonds as per explanatory notes | — | — | — | 30,020 | |
| — | 50.00 | — | — | ||
| Supply of different types of caution boards as per technical specifications | — | — | — | 67,804.5 | |
| — | 20.00 | — | — | ||
| Supply of retro reflective number plates as per technical specifications | — | — | — | 17,638.2 | |
| — | 20.00 | — | — | ||
| Erection of retro reflective number plates as per technical specifications | — | — | — | 1,923.2 | |
| — | 10.00 | — | — | ||
| Supply of Earthing stations as per technical specifications | — | — | — | 48,686.4 | |
| — | 10.00 | — | — | ||
| Erection of Earthing stations as per explanatory notes | — | — | — | 17,080.6 | |
| — | 8.00 | — | — | ||
| Dismantling of mast, portal, TTC & other small part steel as per explanatory notes | — | — | — | 74,728.72 | |
| — | 4.00 | — | — | ||
| Dismantling and removal of Guy rod assembly and terminations as per explanatory note | — | — | — | 5,319.4 | |
| — | 20.00 | — | — | ||
| — | 2.00 | — | — | ||
| — | 2.00 | — | — | ||
| — | 2.00 | — | — | ||
| — | — | — | 16,830.42 | ||
| — | 10.00 | — | — | ||
| — | — | — | 15,795 | ||
| — | 10.00 | — | — | ||
| — | — | — | 45,487.9 | ||
| — | 100.00 | — | — | ||
| — | — | — | 30,034 | ||
| — | 100.00 | — | — | ||
| — | — | — | 25,028 | ||
| — | 25.00 | — | — | ||
| — | — | — | 8,503.25 | ||
| — | 25.00 | — | — | ||
| — | — | — | 16,316.25 | ||
| — | 25.00 | — | — | ||
| — | — | — | 16,958 | ||
| — | 25.00 | — | — | ||
| Supply of Contact wire splice toothed type complete assembly with fasteners as per RDSO Drg. -No ETI-OHE-P1080 -1- Mod-B and part Drg. no ETI-OHEP- 1081 - 1 mod C or latest. | — | — | — | 31,574 | |
| Each Span | 100.00 | — | — | ||
| Slewing/ Dismantling of OHE as per explanatory notes | — | — | — | 4,19,108 | |
| Each Span | 100.00 | — | — | ||
| Re-slewing/Re-erection of OHE as per explanatory notes | — | — | — | 4,53,305 | |
| — | 50.00 | — | — | ||
| ATD locking and unlocking as per explanatory notes | — | — | — | 1,21,262.5 | |
| Each Span | 110.00 | — | — | ||
| Tower wagon checking and adjustment of OHE, Overlaps, Turnout and Crossovers etc. as per site conditions. | — | — | — | 2,82,748.4 | |
| Lumpsum 570340.14 | 1.00 | — | — | ||
| Power block charges for Erection of item no. 3 6 8 10 12 14 16 18 23 31 32 35 36 37 45 46 47 48 | — | — | — | 5,70,340.14 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCApril2022.pdf
ATTACHMENT
GCCACS1to11.pdf
ATTACHMENT
TenderDocs26.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .