Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23.7 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹27.8 L+₹4.1 L (17.5%)Admitted-Fee/PreQual/Technical/Finance IRRIGATION COLONY PENJISAHI PENISAHI KANDHAMAL | KANDHAMAL | ODISHA | 761108 | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹33.9 L
EMD Value
₹34,000
Closing Date
21 Sept 2026, 5:00 pmClosed
Divisional Officer
O/o The Superintending Engineer, Phulbani (R and B) Division, Phulbani, Kandhamal, 762001
Construction of Record room and renovation and alternation of DIC Office Building at Phulbani
2026_EICCL_140172_1
SERBPLB2-07-2026-2027
Open Tender
Civil Works - Buildings
Percentage
120 days
Kandhamala, Phulbani
2 documents required · 2 mandatory
₹6,000
₹34,000
Yes
22 Sept 2026
7 Sept 2026
22 Sept 2026
7 Sept 2026
21 Sept 2026
7 Sept 2026
7 Sept 2026 - 19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORKS:
Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge.
Record Room
ColumnPeripheri
Pinht protection key
wall | 86.56 | cum | 282.9 | ₹24,486.98 |
| 2 | Supplying filling in foundation and plinth with sand in 23.5cm(9 INCH) thick layers including watering and ramming with the cost conveyance royalties taxes of the materials and labour with T&P required for the work etc. complete (Measurement will be taken on finished compacted section only.)
Record Room
ColumnPeripheri
Pinht protection key
wall | 60.06 | cum | 580.2 | ₹34,845.65 |
| 3 | Cement concrete of proportion (1:3:6) in foundation and floors using 4cm (3/2 inch) size clean hard black hand broken granite stone metal of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15cm (6 inch) thick to the required level ramming, watering and curing etc. complete including cost and conveyance of all materials with and royalties and all labour with T&P required for the work etc. complete including dewatering if required.
Floor
Plinth Protection | 32.25 | cum | 7,009.71 | ₹2,26,028.1 |
| 4 | R.C.C (M20) using 20mm and down graded H.G. chips including cost, vonveyance, roylty of all materils, labour and T & P require fo rht ework etc. complete.
(a) Footing
Pedstal | 23.9 | cum | 7,399.2 | ₹1,76,840.88 |
| 4.01 | (b) Plinth Beam | 5.18 | cum | 8,273.57 | ₹42,857.09 |
| 4.02 | © Column Below P.L | 2.43 | cum | 16,782.02 | ₹40,780.31 |
| 4.03 | (d) Column Above P.L | 6.68 | cum | 16,782.02 | ₹1,12,103.89 |
| 4.04 | (e) Lintel | 1.41 | cum | 15,112.92 | ₹21,309.22 |
| 4.05 | (f) Chajja | 8.64 | sqm | 1,259.81 | ₹10,884.76 |
| 4.06 | (g) Shelve | 54.18 | sqm | 1,109.54 | ₹60,114.88 |
stage.html
html • 0.02 MB
finance_608138.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 0.80 MB
Tendernotice_1.pdf
PDF • 1.73 MB
BOQ_608138.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .