Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC | L1 | Accepted-AOC l1 | |
| 2 | L2₹3.1 L+₹1,016.07 (0.33%)Rejected-Finance | L2 | Rejected-Finance l2 |
Tender Value
₹2.8 L
EMD Value
₹6,990
Closing Date
29 Dec 2023, 6:00 pmClosed
Assistant Engineer
Assistant Engineer LID EW Section Nenmeni GP
Annual Plan-NENMENI GP-323/2023-2024-Construction of Drainage at Cheeral FHC-330000/- (CFC Tied Grant)-General Civil Work
2023_LSGD_633220_21
AE/LIDEW/NMN/04/2023-24
Open Tender
Civil Works - Buildings
Item Rate
180 days
Nenmeni GP
Please refer Tender documents.
8 documents required · 8 mandatory
₹620
₹6,990
Yes
14 Mar 2024
20 Dec 2023
1 Jan 2024
20 Dec 2023
29 Dec 2023
20 Dec 2023
Amount
CONSTRUCTION OF DRAINAGE
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.18.9.17.1:Providing and fixing PVC pipes including fixing the pipe with clamps/ clip at 1.00 m spacing . This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 63 mm dia 6 Kgf/cm2 - External work - Exposed on wall
OD285223/2023-2024:Providing and fixing NAME BOARD of average size 60cmx45cm fixing with 40mm GI pipe post including bottom concreting ,painting ,lettering etc complete as detailed below .Earth work excavation in all classes of soil,PCC 1;4;8of size 20x20x50 size ,2nos 40mm GI Pipe as main post average length 160cm, support strut with 25mm GI pipe 2 nos 50cm,1mm thick MS board of frame with 40x40x6 mm angle iron and 3mm thick MS gusset plates at junctions over all painting with synthetic enamel and lettering with synthetic enamel paint.
KUNHIMUHAMMED C A
Bidder Name
KUNHIMUHAMMED C A
RAJAN K R
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .