Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance EDOLIKUNNATH H CHENNAMANGALUR PO MUKKAM VIA CALICUT 673602 | KOZHIKODE | KERALA | 673602 | Admitted-Finance |
| 2 | Admitted-Finance KOZHIKALPARAMBATH H KOTTAPARAMBA PO KOZHIKODE 673008 | KOZHIKODE | KERALA | 673008 | Admitted-Finance |
Tender Value
₹3.3 L
Closing Date
6 Jan 2022, 6:00 pmClosed
Director
NIT, Calicut, Kerala - 673601
urgent maintenance work of collapsed compound wall at Ladies Hostel near recreation club
2021_NITC_663517_1
Engg/D1/178/2021-22
Open Tender
Civil Works
Item Rate
30 days
Calicut
Please refer Tender documents.
8 documents required · 8 mandatory
₹590
Director, NITC
Exempted
17 Feb 2022
16 Dec 2021
10 Jan 2022
16 Dec 2021
6 Jan 2022
16 Dec 2021
Amount
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
Providing and laying in position cement concrete of grade 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centering and shuttering - All work up to plinth level
Providing and laying in position reinforced cement concrete of 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) grade, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement for R.C.C. work in Thermo-Mechanically Treated bars of grade Fe-500D or more.including straightening, cutting, bending, placing in position and binding all complete upto plinth leve
Laterite masonary in cement mortar 1:6 (1 cement : 6 coarse sand) in superstructure above plinth level up to floor V level using neatly dressed laterite stones including cost and conveyance of all materials and labour charges etc, complete
Laterite masonary with dismantled laterite in cement mortar 1:6 (1 cement : 6 coarse sand) in superstructure above plinth level up to floor V level using neatly dressed laterite stones including cost and conveyance of all materials and labour charges etc, complete (excluding the cost of Laterite)
Random rubble masonry with hard stone in cement mortar 1:6 (1 cement : 6 coarse sand) in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with
Random rubble masonry with availaible dismantled hard stone in foundation and plinth in cement mortar 1:6 (1 cement : 6 coarse sand) including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :
Plastering with C.M. 1:4 (one cement four sand), 12mm thick for walls inside and outside with necessary scaffolding and thread lines, including cost and conveyance of all materials and labour charges etc. complete.
Demolishing brick/laterite work in cement mortar manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
Demolishing stone rubble in cement mortarmasonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge
Fencing with G.I. barbed wire angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.
Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.
kp mohankumar
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .