| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹16.9 L+₹73,483.26 (4.55%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹14.7 L
EMD Value
₹36,742
Closing Date
24 Aug 2023, 3:30 pmClosed
Executive Engineer
PH DIVISION SOUTH KWA TVPM
O M Water Supply Schemes ANNUAL MAINTENANCE II ANNUAL MAINTENANCE I WATER SUPPLY DISTRIBUTION NETWORK OF LEFT SIDE OF THIRUVALLOM PACHALLOOR KOVALAM AND MUTTACAUD AREA UNDER WW SECTION VANDITHADAM FOR THE YEAR 2023 24 Pipeline Work
2023_KWA_596711_1
TR/13136/2023_26_1_1/1
Open Tender
Civil Works - Water Works
Item Rate
365 days
PH DIVISION SOUTH KWA TVPM
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,760
₹36,742
Yes
25 Oct 2023
18 Aug 2023
26 Aug 2023
18 Aug 2023
24 Aug 2023
18 Aug 2023
Amount
LEAK RECTIFICATION OF AC PIPELINE
100.46.1.1:Repairing leakage/breakage of 80mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
100.46.1.2:Repairing leakage/breakage of 100mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
100.46.1.4:Repairing leakage/breakage of 150mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
LEAK RECTIFICATION OF PVC PIPELINE-ALL SOCKETED JOINTS
OD57217/2023-2024:Leak rectification work in 20/25 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with out causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe in to the trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or or any available joint and testing the pipe line by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic controlling etc.complete as per the direction of Departmental officers including the cost of pipe and PVC specials; PVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
100.47.1.1:Leak rectification work in 32mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
100.47.1.2:Leak rectification work in 40mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
100.47.1.3:Leak rectification work in 50mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
100.47.1.4:Leak rectification work in 63mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
100.47.1.5:Leak rectification work in 75mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
100.47.1.6:Leak rectification work in 90mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
LEAK RECTIFICATION OF PVC PIPELINE- SOCKETED&;CIR JOINTS
OD57218/2023-2024:Leak rectification work in 75 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, Earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar Cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with Out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, Smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the Trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the Existing pipe with solvent cement or repairable joint and testing the pipe line by operating the Valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not Exceeding 20cm depth including consolidating each layers by ramming, watering, charges for Removing surplus soil from work site without causing any damages to the existing utilities, including Hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution Boards,lighting, ribbon fencing, watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of CIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & CIR Jointing.
100.47.2.1:Leak rectification work in 90mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing.
100.47.2.2:Leak rectification work in 110mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing.
100.47.2.3:Leak rectification work in 140mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing.
100.47.2.4:Leak rectification work in 160mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing.
100.47.2.5:Leak rectification work in 180mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing.
100.47.2.6:Leak rectification work in 200mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing.
100.47.2.7:Leak rectification work in 250mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing.
100.47.2.8:Leak rectification work in 280mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing.
LEAK RECTIFICATION OF PVC PIPELINE-CIR JOINTS
OD57219/2023-2024:Leak rectification work in 75 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, Earth work excavation in all kinds of soil for for exposing leak portion of the pipe including tar Cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipe line with Out causing any damages to the balance portion, dismantling and lifting the pipe from trenches, Smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe in to the Trenches,placing in position aligning the pipe to line and level and jointing the new pipe with the Existing pipe with solvent cement or repairable joint and testing the pipe line by operating the Valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not Exceeding 20cm depth including consolidating each layers by ramming, watering, charges for Removing surplus soil from work site without causing any damage to the existing utilities, including Hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution Boards, ribbon fencing, lighting,watching, traffic control etc.complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of CIR Joints; PVC Pipes and specials shall be of good quality and conforming to relevant standards: CIR Jointing.
100.47.3.1:Leak rectification work in 90mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: C.I.R. Jointing.
100.47.3.2:Leak rectification work in 110mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: C.I.R. Jointing.
100.47.3.3.a:Leak rectification work in 140 mm PVC (Class 2 to 6) pipe line including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: C.I.R. Jointing.
100.47.3.4:Leak rectification work in 160mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: C.I.R. Jointing.
100.47.3.5:Leak rectification work in 180mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: C.I.R. Jointing.
100.47.3.6:Leak rectification work in 200mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: C.I.R. Jointing.
100.47.3.7:Leak rectification work in 250mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: C.I.R. Jointing.
100.47.3.8:Leak rectification work in 280mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damage to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, ribbon fencing, lighting, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: C.I.R. Jointing.
LEAK RECTIFICATION OF CI PIPELINE-CID JOINTS
100.48.1.1:Rectification of leakages in 80mm C.I. Pipe of all classes by replacing a length up to 1.5m including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting and removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with the C.I. pipe and conveying and jointing with C.I.D. joint / suitable mechanical joint of suitable size or any other available size suitable joints after cleaning the ends, grinding if necessary, centering the pipe, inserting the joints, tightening to make a water tight joint, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc., complete.
100.48.1.2:Rectification of leakages in 100mm C.I. Pipe of all classes by replacing a length up to 1.5m including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting and removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with the C.I. pipe and conveying and jointing with C.I.D. joint / suitable mechanical joint of suitable size or any other available size suitable joints after cleaning the ends, grinding if necessary, centering the pipe, inserting the joints, tightening to make a water tight joint, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc., complete.
100.48.1.3:Rectification of leakages in 125mm C.I. Pipe of all classes by replacing a length up to 1.5m including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting and removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with the C.I. pipe and conveying and jointing with C.I.D. joint / suitable mechanical joint of suitable size or any other available size suitable joints after cleaning the ends, grinding if necessary, centering the pipe, inserting the joints, tightening to make a water tight joint, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc., complete.
100.48.1.4:Rectification of leakages in 150mm C.I. Pipe of all classes by replacing a length up to 1.5m including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting and removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with the C.I. pipe and conveying and jointing with C.I.D. joint / suitable mechanical joint of suitable size or any other available size suitable joints after cleaning the ends, grinding if necessary, centering the pipe, inserting the joints, tightening to make a water tight joint, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc., complete.
100.48.1.5:Rectification of leakages in 200mm C.I. Pipe of all classes by replacing a length up to 1.5m including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting and removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with the C.I. pipe and conveying and jointing with C.I.D. joint / suitable mechanical joint of suitable size or any other available size suitable joints after cleaning the ends, grinding if necessary, centering the pipe, inserting the joints, tightening to make a water tight joint, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc., complete.
LEAK RECTIFICATION OF CI PIPELINE-MINOR LEAKS
100.48.2.1:Rectification of minor joint leakages in 80mm C.I. Pipe including earthwork excavation in all kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line and specials, cleaning the joints including raking out the damaged lead wool, conveying and inserting hemp and lead wool and caulking after cleaning the ends, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc., complete.
100.48.2.2:Rectification of minor joint leakages in 100mm C.I. Pipe including earthwork excavation in all kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line and specials, cleaning the joints including raking out the damaged lead wool, conveying and inserting hemp and lead wool and caulking after cleaning the ends, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc., complete.
100.48.2.3:Rectification of minor joint leakages in 125mm C.I. Pipe including earthwork excavation in all kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line and specials, cleaning the joints including raking out the damaged lead wool, conveying and inserting hemp and lead wool and caulking after cleaning the ends, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc., complete.
100.48.2.4:Rectification of minor joint leakages in 150mm C.I. Pipe including earthwork excavation in all kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line and specials, cleaning the joints including raking out the damaged lead wool, conveying and inserting hemp and lead wool and caulking after cleaning the ends, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc., complete.
100.48.2.5:Rectification of minor joint leakages in 200mm C.I. Pipe including earthwork excavation in all kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line and specials, cleaning the joints including raking out the damaged lead wool, conveying and inserting hemp and lead wool and caulking after cleaning the ends, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc., complete.
100.48.2.6:Rectification of minor joint leakages in 250mm C.I. Pipe including earthwork excavation in all kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line and specials, cleaning the joints including raking out the damaged lead wool, conveying and inserting hemp and lead wool and caulking after cleaning the ends, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc., complete.
100.48.2.7:Rectification of minor joint leakages in 300mm C.I. Pipe including earthwork excavation in all kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line and specials, cleaning the joints including raking out the damaged lead wool, conveying and inserting hemp and lead wool and caulking after cleaning the ends, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc., complete.
LEAK RECTIFICATION OF GI PIPELINE
OD57221/2023-2024:Rectification of leakages of 15 mm, 20 mm & 25 mm GI Pipes by replacing lengths up to 1.0m Including earth work excavation in all kindss of soil for exposing leak portion of the pipe including Tar /concrete cutting, by cutting,removing and stacking the damaged portion from the existing line Without causing any damages to the remaining portion and specials and conveying and replacing With GI Pipes of suitable size and jointing by thraded coupler and union of suitable size including Threading, alignment, laying and jointing to make a water tight joint, testing the line to the required Pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers Not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the Surplus soil from the work site, without causing any damages to any other utilities, including the Charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, Lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials But excluding cost of pipe and as per the direction of departmental officers etc. Complete.
100.50.1.1:Rectification of leakages of 32mm, 40mm & 50mm G.I. Pipes by replacing lengths up to 1.0m including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.
100.50.1.2:Rectification of leakages of 65mm G.I. Pipes by replacing lengths up to 1.0m including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.
100.50.2.1:Rectification of leakages of 50mm G.I. Pipes in exposed portions by replacing lengths up to 1.0m by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignement, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, necessary scaffolding including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.
OTHER MAINTENANCE WORKS
OD57222/2023-2024:Leak rectification work in all AC/PVC/GI/CI/DI pipe lines upto 200 mm including detecting and Locating leak, earth work excavation in all kinds of soil for for exposing leak portion of the pipe Including tar cutting / concrete cutting, rectifying leakage with saddle piece and testing the pipe line By operating the valves concerned, and rectifying the defects if noticed and without causing any Damages to the existing utilities and refilling the trenches using excavated earth in layers not Exceeding 20 cm depth including consolidating each layers by ramming, watering, charges for Removing surplus soil from work site, including hire for tools and plant, conveyance of tools and Materials, bailing out water, providing caution boards,lighting,watching, ribbon fencing, traffic Controlling etc.complete as per the direction of Departmental officers including the cost of PVC/MS/GI saddle piece. Saddle piece shall be of good quality and conforming to relevant Standards: Providing Saddle piece
100.51.1: Disconnecting water connection from service mains along earthern road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting if any, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete.
100.51.2:Disconnecting water connection from service mains along Concrete road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete.
100.51.3:Disconnecting water connection from service mains along Asphalt road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete.
OD57223/2023-2024:Rectifying the leakages in boring point of House connection/public tap connection including earth work excavation in all kinds of soil for exposing the boring point including concrete / tar cutting, dismantling the damaged saddle piece,cutting and removing damaged portion of pipe line,fixing new saddle piece,laying 20/25 mm PVC 10Kg/cm2 pipe in place of damaged portion of pipe and connecting with existing pipe line,testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and saddle piece and as per the direction of departmental officers etc. Complete.
100.56.1:Supplying and fixing 15 / 20 mm PVC public tap after dismantling the damaged tap including all cost of materials, labour charges, hire for tools and as per the direction of the department officers etc complete.
100.9.1:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 20 mm nominal outside diameter pipes.
100.9.2:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 25 mm nominal outside diameter pipes.
100.9.5:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 50 mm nominal outside diameter pipes.
100.9.6:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 63 mm nominal outside diameter pipes.
100.9.7:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 75 mm nominal outside diameter pipes.
100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes.
100.9.9:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 110 mm nominal outside diameter pipes.
OD66874/2023-2024:Minor rectification of Pipe line 15/20/25/32/63/90/110/200 sizes of pvc pipe and 25/40/50/100/150 GI pipe-including earth work and labour charges etc
15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road
15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.1.2:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 1.5m but not exceeding 3m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.98.1008:Engaging Coolie.
100.98.1009:Engaging Fitter ( grade 1).
100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete.
100.41.39:Supply, stacking, spreading and consolidating of Quarry Muck in the trench of pipe line, including carriage, loading, unloading & stacking up to any lead.
100.41.40:Supply, stacking, spreading and consolidating of Red earth in the trench of pipe line for cushion including carriage, loading, unloading & stacking up to any lead.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
OD57225/2023-2024:Restoration of the Tar cut portion using instant road repair mix after removing debris, consolidating, ramming existing surface and placing in position repair mix as required, ramming, levelling, finishing to the existing road level including cost of instant road repair mix, all labour, hire of tools and plants etc complete as per the direction of departmental officers.
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
LEAK RECTIFICATION OF DI PIPE LINE - JOINT LEAK
100.49.1.5:Rectification of joint leakages in 300mm D.I. Pipe (cutting, removing and laying back a length of 1.0m from one side of the joint) including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing a portion of pipe from the damaged joint without causing any damages to the remaining portion of the line and specials and replacing the pipe with mechanical and tyton joint after cleaning the ends, centering the pipe, providing the joints, testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of mechanical joint and as per the direction of departmental officers etc., complete.
K RAVEENDRAN NAIR
Bidder Name
K RAVEENDRAN NAIR
Balachandradas
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .