Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.9 LAccepted-AOC DARUGAMURA PARA SIDHAI MOHANPUR WEST TRIPURA 799212 | WEST TRIPURA | TRIPURA | 799212 | ₹8.9 L | 1 | Accepted-AOC AOC |
| 2 | 2₹8.9 L+₹7,526 (0.85%)Rejected-Finance | ₹8.9 L+₹7,526 (0.85%) | 2 | Rejected-Finance None |
Tender Value
₹9.4 L
EMD Value
₹18,815
Closing Date
6 Jul 2026, 3:00 pmClosed
The Executive Engineer, DWS Division, Ambassa
O/o The Executive Engineer, DWS Division, Ambassa
Construction of 08 (eight) nos. drinking water tanker filling points in identified stress pocket areas under Manu RD Block. (Group-I) (2nd Call)
2026_CEDWS_74184_1
162/EE/PWD(DWS)/AMB/2025-26
Open Tender
Civil Works - Water Works
Works
60 days
Dhalai Tripura
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹18,815
20 Aug 2026
30 Jun 2026
6 Jul 2026
30 Jun 2026
6 Jul 2026
30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. -
All kinds of soil. | 32.4 | Cum | 179.9 | ₹5,828.76 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited
layer by ramming and watering, lead up to 50 m and lift
upto 1.5 m.
-All kinds of soil cum | 30.72 | Cum | 161.3 | ₹4,955.14 |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 3 | Cum | 1,177.3 | ₹3,531.9 |
| 4Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level: | |||||
| 4.01 | 1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 20 mm nominal size) | 12.8 | Cum | 10,570.6 | ₹1,35,303.68 |
| 5First class brick work in foundation and plinth including cost of all materials as required complete:- | |||||
| 5.01 | In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 29.12 | Cum | 9,845.2 | ₹2,86,692.22 |
| 6 | 15 mm cement plaster of mix: Cement mortar 1:4 (1 cement : 4 fine sand) | 140.8 | Sqm. | 260.6 | ₹36,692.48 |
| 7 | Neat cement punning. | 140.8 | Sqm. | 56.8 | ₹7,997.44 |
| 8 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete-
Hot finished welded type tubes | 0.4 | Kg. | 146.2 | ₹58.33 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_75504.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.38 MB
DNIeT.pdf
Tender Documents • 3.03 MB
BOQ_75504.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .