Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC 103 B PARI NAGAR CHINNAANDAN KOVIL ROAD KARUR 639 001 | KARUR | TAMIL NADU | 639001 | ₹1.5 Cr | L1 | Accepted-AOC Rate quoted below estimate rate |
| 2 | L2₹1.5 Cr+₹2.7 L (1.82%)Rejected-AOC | ₹1.5 Cr+₹2.7 L (1.82%) | L2 | Rejected-AOC Rate quoted above estimate rate |
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
1 Nov 2023, 3:00 pmClosed
District Collector/Chairman
IInd Floor, DRDA Collectorate, Karur
Strengthening the road from Nellikombai Road to Odapatti road via Kumarapalayam
2023_RDTN_378268_10
DRDA Karur - NABARD XXIX 2023-24
Open Tender
Civil Works - Roads
Item Rate
180 days
Karur
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.6 L
IInd Floor, DRDA Collectorate, Karur
8 Jan 2024
20 Oct 2023
1 Nov 2023
20 Oct 2023
1 Nov 2023
20 Oct 2023
25 Oct 2023
Amount
Name of the work :.Strengthening the road from Nellikombai Road to Odapatti road via Kumara palayam Km 0/0-2/0 (R-109) in Aravakuruchi Block
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Picking 5cm and 10cm old metalled surface and sectioning 1sqm including all labour charges etc complete
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of Prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous surface
Provision for cautionary board (60cm equilatoral traingle)
Provision for KM Stones
Provision for HM Stones
Provision for Cost of reflectors
Provision for Name Board
Construction ofpiped causeway km1/4 at Nellikombai Road to Odapatti road via Kumara palayam Km 0/0-2/0
Earth work excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with initial lead and lift asper SS20 B
CC1:4:8 using 40MM ISS. Size HBG metal including cost and conveyance of all materials to site all labour charges etc. complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc Complete
Below GL
Above GL
Cement Concrete in C.M. 1:3:6 using 40MM ISS. Size HBG metal including cost and conveyance of all materials to site all labour charges etc. complete
Collection and supply of griity gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc., complete
Construction of un -reinforced , dowel joinyted at expansion and construction joint only , plain cement concrete pavement, thickness as per design over a prepared
CC1:1.5:3 using 20MM ISS. Size HBG metal including cost and conveyance of all materials to site all labour charges etc. complete
CC 1:2:4 using 20MM ISS. Size HBG metal including cost and conveyance of all materials to site all labour charges etc. complete
Supplying and Fabricating and placing in the position MS or RTS reinforcemnt works including etc complete
Rough stone dry packing ISS metal including cost and conveyance of the all materials to the site all labour charges etc. complete
Supplying of NP3 class RCC pipe confirming to IS 458/2003 including cost of pipi as a finished work including all other incidential charges , testing charges including loading, unloading, transport and delivery in good condition at work site etc complete
Hosting and fixing NP3 CLASS RCC pipe and collars in proper gradient including all labour charge and all other incidintal charges etc
Provision for bitumen pad including etc complete
Construction of 1.5 m RCC slab culvrt at km 0/8 of strengthening the road Nellikombai Road to Odapatti road via Kumara palayam Km 0/0-2/0
Earth work excavation and depositing on bank within initial lead and lift inordinary soil except hard rock as per ss20b for foundation
CC 1:4:8 using 40MM ISS. Size HBG metal including cost and conveyance of all materials to site all labour charges etc. complete
CC 1:3:6 using 40MM ISS. Size HBG metal including cost and conveyance of all materials to site all labour charges etc. complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc Complete
Below sill level
Above sill level
Supplying anf fabricating and placing in postion mild steel or ribbed T or steel for all reinforced cement concrete works as per design given including cost of steel binding wiring in all forces complying with standarad specification
CC1:2:4 using 20MM ISS. Size HBG metal including cost and conveyance of all materials to site all labour charges etc. complete
Reinforced Cement concrete 1:1.5:3 mix using 20mm HBG metal for foundation including watering wherver necessary and laid in layers of not more than 15 cm thick., comnpacting etc., complete complying with standard and as directed
Gravel filling between body wall including cost and conveyanve of gravel , labour for filling , watering and compacting etc complete complying with standard specification and as directed by the departmental officer
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
Bharathi Construction
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .