| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | L1 | Accepted-AOC Due to L1 | |
| 2 | L2₹2.4 L+₹2,948 (1.24%)Rejected-Finance 2ND FLOOR 76A PHUL SARAI RANCHI ROAD DISTT RAMGARH JHARKHAND | RAMGARH | JHARKHAND | L2 | Rejected-Finance Due to L2 | |
| 3 | L3₹2.4 L+₹4,718 (1.99%)Rejected-Finance | L3 | Rejected-Finance Due to L3 |
Tender Value
₹2.8 L
EMD Value
₹3,500
Closing Date
22 Dec 2023, 6:00 pmClosed
Project Engineer (Excv), Tapin North OCP
Office of Project Engineer (Excv.), Tapin North OCP, Hazaribagh Area
Repairing of wiring circuit of Swing generator and resistance panel and wiring harness of LVCR assembly to propel motor and steering system in shovel HMB-563 and at Tapin North OCP, Hazaribagh Area.
2023_CCL_295893_1
PE(X)/Tapin (N) OCP/NIT/23-24/058 Dated 12.12.2023
Open Tender
Excavation Department Work
Item Rate
15 days
Tapin North OCP
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,500
18 Feb 2024
12 Dec 2023
23 Dec 2023
12 Dec 2023
22 Dec 2023
12 Dec 2023
12 Dec 2023 - 18 Dec 2023
Amount
Harness of swing generator to DC panel (Q50mm2) – 14 meter X 2 nos. Harness of Propel motor to LVCR - (Q50mm2) – 15 meter X 2 nos.
Harness of swing generator to DC panel (Q6mm2) – 14 meter X 11 nos. Harness of field of propel motor to LVCR (Q6mm2) – 15 meter X 02 nos.
Harness of steering motor and steering system (Q6mm2) – 15 meter X 05 nos. Harness for supplementary wire (Q6mm2) – 15 meter X 01 nos.
Cutting electrode for gauging of cracked portion of DC panel structure and bulged portion. electrode- L-602)
Suitable steel electrode for material filling and welding of support plate of DC panel structure (electrode- Lomelt-205)
Crowd motor ckt. (Q6mm2) – 5mtr X 5nos.
Hoist motor ckt. (Q6mm2) – 5mtr X 5nos.
Swing motor ckt. (Q6mm2) – 5mtr X 6nos.
Propel motor ckt. (Q6mm2) – 5mtr X 2nos.
Trip motor ckt. (Q6mm2) – 5mtr X 3nos.
Supplementary ckt. (Q6mm2) – 5mtr X 1no.
Conduit kit
Replacement of copper lugs and binding cords.
Highly skilled – 01 person per shift X 07 days
skilled – 02 person per shift X 07 days
Welder-02 person per shift X 03 days
Semi-skilled – 03 person per shift X 07 days
Total impact of GST for the purpose of CTC
VIDYA ENTERPRISES
M/S R.S ENTERPRISES
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .