| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹6.1 L+₹75,410 (14.1%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Jaison K C L2 | MANGALDAS CHANDRU NAIK L1 |
|---|---|---|---|---|---|
| 1.00 | Clearing, cutting and removal of wooden logs, trees and branches stuck to the Bandhara obstructing the normal flow of water. | 115 | Nos | 450 ₹51,750 | 404 ₹46,460 Lowest |
| 2.00 | Earthwork in excavation by desilting of river , nallahs ponds ,etc. by mechanical means in all type of strata comprising any of materials such as soil ,sand, clay, gravels, moorum of all varieties, shingles, pebbles all types of conglomerated laterite rock, soft rock ,ordinary rock, disintegrated rock , fissured/shattered, decomposed rock and all such other materials either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted including chiseling, wedging etc but blasting prohibited in all condition such as dry , moist , saturated, submerged foul condition etc. including setting out construction of shoring, strutting removal of stamp and other deleterious matter ,dressing of sides and bottom, providing barricading, danger lightning, guarding etc backfilling the excavated earth to the extent required and disposing of excavated stuff in specification areas with 50m lead and lifts etc. and as directed by engineer -in-charge etc .all complete. | 1,047 | Cum | 170 ₹1,77,990 | 140 ₹1,46,580 Lowest |
| 3.10 | Fixing of bandhara gates after monsoon including tranporting the same from Godown/shed upto bandhara site, including loading, unloading with all leads and lifts etc. Sealing of the gates with plastic sheet (as the case may be)to make in water proof including cost towards all consumables if any complete and as directed by Engineer in charge . a)Fiber reinforced plastic (FRP) Gates | 615 | Nos | 230 ₹1,41,450 | 219 ₹1,34,685 Lowest |
| 3.20 | b) Kolhapur type (KT)Gates | 60 | Nos | 420 ₹25,200 | 392 ₹23,520 Lowest |
| 4.00 | Providing and laying in position plastic sheets over the needle which is fixed between the piers for open type of bandhara to prevent leakages through the joints etc. complete. | 1,208 | sqm | 60 ₹72,480 | 42 ₹50,736 Lowest |
| 5.00 | Transportation of wooden planks from godown to bandhara site during closing operation and from bandhara site to godown after removal with an average lead of 15kms by mechanical transport including loading unloading and stacking etc complete. | 2 | Cum | 600 ₹1,200 | 565 ₹1,130 Lowest |
| 6.00 | Engaging labours for closing the bandhara by placing the wooden planks in proper position, laying plastic sheet and filling the moorum in between the wooden planks which includes manual loading and unloading. | 20 | Nos | 450 ₹9,000 | 404 ₹8,080 Lowest |
| 7.00 | Supplying and filling in plinth under floors, trenches including watering ramming consolidating, dressing, complete. | 4 | cum | 600 ₹2,400 | 581 ₹2,324 Lowest |
| 8.10 | Removal bandharas gates before onset of monsoon and transporting the same upto godown/shed, including loading, uploading and stacking with all leads and lifts etc. Complete and as directed by Engineer in charge. a)Fiber reinforced plastic (FRP) Gates | 615 | Nos | 120 ₹73,800 | 110 ₹67,650 Lowest |
| 8.20 | b) Kolhapur type (KT) Gates | 60 | Nos | 240 ₹14,400 | 222 ₹13,320 Lowest |
Tender Value
₹7.2 L
EMD Value
₹14,385
Closing Date
16 Sept 2026, 4:00 pmClosed
EE XI, WRD
Ravonfond, Navelim
Closing and opening of Bandhara by fixing of FRP needles, KT gates and wooden planks to the existing OTB across Talpona river under the jurisdiction of SD II, WD XI, WRD, Canacona-Goa for the year 2026-27
2026_WRD_31551_1
WDXI/PB/F.24/2026-27/719/Sr4
Open Tender
Miscellaneous Works
Item Rate
210 days
Ravonfond, Navelim
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹14,385
28 Sept 2026
3 Sept 2026
18 Sept 2026
3 Sept 2026
16 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing, cutting and removal of wooden logs, trees and branches stuck to the Bandhara obstructing the normal flow of water. | 115 | Nos | - | - |
| 2 | Earthwork in excavation by desilting of river , nallahs ponds ,etc. by mechanical means in all type of strata comprising any of materials such as soil ,sand, clay, gravels, moorum of all varieties, shingles, pebbles all types of conglomerated laterite rock, soft rock ,ordinary rock, disintegrated rock , fissured/shattered, decomposed rock and all such other materials either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted including chiseling, wedging etc but blasting prohibited in all condition such as dry , moist , saturated, submerged foul condition etc. including setting out construction of shoring, strutting removal of stamp and other deleterious matter ,dressing of sides and bottom, providing barricading, danger lightning, guarding etc backfilling the excavated earth to the extent required and disposing of excavated stuff in specification areas with 50m lead and lifts etc. and as directed by engineer -in-charge etc .all complete. | 1,047 | Cum | - | - |
| 3.1 | Fixing of bandhara gates after monsoon including tranporting the same from Godown/shed upto bandhara site, including loading, unloading with all leads and lifts etc. Sealing of the gates with plastic sheet (as the case may be)to make in water proof including cost towards all consumables if any complete and as directed by Engineer in charge . a)Fiber reinforced plastic (FRP) Gates | 615 | Nos | - | - |
| 3.2 | b) Kolhapur type (KT)Gates | 60 | Nos | - | - |
| 4 | Providing and laying in position plastic sheets over the needle which is fixed between the piers for open type of bandhara to prevent leakages through the joints etc. complete. | 1,208 | sqm | - | - |
| 5 | Transportation of wooden planks from godown to bandhara site during closing operation and from bandhara site to godown after removal with an average lead of 15kms by mechanical transport including loading unloading and stacking etc complete. | 2 | Cum | - | - |
| 6 | Engaging labours for closing the bandhara by placing the wooden planks in proper position, laying plastic sheet and filling the moorum in between the wooden planks which includes manual loading and unloading. | 20 | Nos | - | - |
| 7 | Supplying and filling in plinth under floors, trenches including watering ramming consolidating, dressing, complete. | 4 | cum | - | - |
| 8.1 | Removal bandharas gates before onset of monsoon and transporting the same upto godown/shed, including loading, uploading and stacking with all leads and lifts etc. Complete and as directed by Engineer in charge. a)Fiber reinforced plastic (FRP) Gates | 615 | Nos | - | - |
| 8.2 | b) Kolhapur type (KT) Gates | 60 | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
Tendernotice_2.pdf
PDF • 0.68 MB
BOQ_31935.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .