Loading…
Loading…
Tender ID
Tender Value
₹20.5 L
EMD Value
₹21,000
Closing Date
6 Apr 2026, 6:00 pmClosed
Executive Engineer, Panchayat R&B Dn. Gandhinagar
Construction Of Compund Wall At Social & Education Complex At Dungari Garasiya Seva Samaj Trust At Alampur Village Under MP Fund 2025-26 , Ta.- Gandhinagar, Dist.- Gandhinagar..
290821
38 of 2025-26/06
Open
Civil - All
Works
Gandhinagar
7 documents required · 7 mandatory
₹900
Yes
Executive Engineer Panchayat (R & B) Division, Gandhinagar
₹21,000
Yes
27 Mar 2026
27 Mar 2026
27 Mar 2026
6 Apr 2026
27 Mar 2026
Item Rate In
(with brief specification and reference to Quantity Unit Amount
No. figures
book of specifications)
Excavation for foundation upto 1.5 m depth
including sorting out and stacking of useful
1 materials and disposing off the excavated 7.000 123.13 Cum
stuff upto 50 Meter lead.(A) Loose or soft soil
Excavation for foundation for depth from
m to 3.0 m including sorting out and
2 stacking of useful materials and disposing 3.00 170.50 Cum
off the excavated stuff upto 50 Meter
lead.(B) Dense or Hard soil
Providing and laying Odinary cement concrete
M150 for curing complete including cost of
3 formwork but excluding the cost of 2.00 3976.40 Cum
reinforcement for reinforced concrete work in
Providing and laying Odinary cement concrete
M.250 and curing complete including the cost
of formwork and excluding reinforcement for
reinforced concrete work in (A) Foundations,
footings, and Mass concrete. footing
Providing and laying Odinary cement concrete
M200 and curing complete including the cost
of form work but excluding the cost of
5 reinforcement for reinforced concrete work in 34.00 6707.70 Cum
Plinth Slab, Columns, Beam, Chhajja, Lintal,
Slab, Stair, RCC Wall, Coping etc. For All
Brick work using common burnt clay building
bricks having crushing strength not less than
6 35 kg./Sq.Cm. in foundation and plinth in 53.00 4244.85 Cum
Cement Mortar 1:5. (1- Cement : 5 -fine sand)
(B) Conventional All Floor
Providing IS Mark TMT FE 500D bar
reinforcement for RCC work including bending
& placing in position complete up to All floor
20 mm Thick sand faced cement gutka plaster
on walls upto height 10 meters above ground
level consisting of 12 mm Thick backing coat
of c.m. 1:3 (1 cement : 3 sand) and 8 mm
Thick finishing coat of c.m. 1:1 (1 cement :
sand) with 1x1cm Groves at juction of
structure member etc. comp.etc. complete.
Description of Item
Item Rate In
(with brief specification and reference to Quantity Unit Amount
No. figures
book of specifications)
Wall Painting (Two coats) with weather proof
acraylic emulsion paint of approved brand and
manufacture and of required shade on
exterior wall surface to give an even shade
9 over and including primery coat with Alkaly 1389.00 83.18 sqmt.
resistance primer of approved brand after
thoroughly brushing surface to remove all
dust and remains of loose powdered material
etc. copm. for all height
Constructing providing and fabricating cattle
guard using channel section frame of size
ISMC series 100 mm x 50 mm (Weight
kg/Rmt) and ISMC section 100 mm x 75mm
(weight 11.50 kg/Rmt) intermediate support
for welding G.I.pipe at 12 Cm C/C of size
mm in a frame made of Channel section size
10 100 mm x 50 mm all round including fixing the 12.00 4973.24 sqmt.
unit on prepared chamber of masonary wall
using MS hold fast embeded in masonary wall
top as directed by Engineer in charge and as
per drawing and necessary required
arrangement etc complete.
Providing and fixing decorative entrance gate
made out of cast iron and various mild steel
tabular section combination , the Ornamental
entrance gate should be fixed at compound
wall including pattern and die making , cutting
, welding , grinding, fabrication , fixing in
11 position at compound wall with necessary 1470.00 167.66 Kg
pedestal, bearing block and other locking
arrangement. The entrance gate should be
painted with two coats of priming coat of paint,
and two coat of oil paint etc complete. As per
detail design and instruction of architect.
Description of Item
Item Rate In
(with brief specification and reference to Quantity Unit Amount
No. figures
book of specifications)
Providing and fixing concertina coil fencing
with punched tape concertina coil 600 mm dia
10 mt openable length having 50 no rounds
per 6 mt length, upto 3mt height of wall with
existing angle iron (50mm x50mm x5mm
)requird shaped As per Directed Engeenier in
charge. placed 2.4mt or 3.00mt apart and with
4 horizontal R.B.T. reinforced barbed wire(3
mm) , stud tied with G.I. staples and G.I. clips
to retain horizontal, including necessary bolts
or G.I.barbed wire tied to angle iron, all
complete as per direction of Engineer-in-
charge, with reinforced barbed tape
(R.B.T.)/Spring core (2.5 mm thick) and
weight 43.478 gm/meter at compound wall for
ESR M4/ intakewell.
Total Rs.
Rupees Twenty Lakh FiftyOne Thousand Nine Hundred Seventy and Paisa SeventySix Only
I / We / am/are willing to carry out the work at ________________________________% above / below
percent (should be written in figure and words) of the estimated rates mentioned above. Amount of
my/our tender Works out as under.
Estimated Amount Estimated Amount
put to tender Rs. _________ put to tender Rs. _________
Deduct_______% below Add_______% above
Net Rs._________ Net Rs._________
in words ___________ in words ___________
The Contractor shall exhibit a board with detailed specification and details of work as directed by
the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills.
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.
G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in
4 R.C.C. items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate mentioned
in all the tender.
Dismentalling of Credit materials amounting of Rs. 0.00 must be recovered from Contractor's
respective R.A. Bill.
Signature of Contractor
Dy. Executive Engineer Executive Engineer
R & B (P) Sub Division Panchayat R.&B.Division
Gandhinagar Gandhinagar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ - Compund Wall At Alampur Village Gng..pdf
BUILDING WORK BOOKLET.pdf
General Specification - Building.pdf
GR - 1.pdf
GR - 2.pdf
SBD Book_ Compund Wall At Alampur Village Gng..pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .