SRI VARA SIDDI VINAYAKA SWAMY DEVASTHANAM, KANIPAKAM, CHITTOOR DIST
Kanipakam
Execution of certain necessary works related to Annual Bramhosthavams 2026 and laying of CC ramp at parking area belongs to SVVSD
969261
SSVVSD-EQ1/148/2026
OPEN - NCB
Civil Engineering Works
CHITTOOR
7 documents required · 7 mandatory
₹297
₹8,385
14 Aug 2026
29 Jul 2026
29 Jul 2026
Engaging Unskilled Labour for earth work excavation in ordinary soils AT SITE with initial lead & initial lift and breaking clods and sectioning for formation Levelling the road (RSSR)
Collection , suplying of the Stone Dust (HBG Stone chips 2.36 mm and Below ) for irrespective layers including watering and ramming and cost and conveyance of all materials charges etc complete
Engaging unskilled labour for spreading the collected Stone dust / sand / Selected earth and sectioning to sub base & shoulders (RSSR)
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size M/C Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days , all incidental charges i.e bailing out water etc complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH, including overhead charges & Contractors profit but excluding GST & Seignorage Charges for Leveling Coarse
Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.22 M20(Grade), course and fine agregates conforming to IS:383 with 60% of 20mm and 40% of 12mm size of course agregate not exceeding 20mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, laid over a polythene sheet of 125 micron thick on a prepared surface in a form work, spreading the concrete with shovels, rakes, compacted using vibrators and finished in continous operation including provision of contraction and expansion, construction joints and curing of concrete slabs for 14 days as per technical specifications clause 1501.
Supply of machinery in desilting works guide lines for engaging excavator -loader (JCB) (capacity/out put of machine 0.24/1 cum The rate per hour is inclusive of all the costs like POL, Transportation of Machine, Driver Batta and other incident charges. The Escavator-loader(JCB) should have the Tacho metre and it should function properly.
Supply of Tractor with truck on hire basis where ever necessary the rate per hour is inclusive of all the costs like POL, Transportation to site, Driver Batta and other incident charges. Complete
Filling with Gravel in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental ,labour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work(APSS NO.309&310)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
RAmp M20 Condi.doc
TENDER_DOCUMENT • 0.04 MB
Ramp Minor work BOQ.xlsx
TENDER_DOCUMENT • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .