Tender Value
₹24.8 L
EMD Value
₹25,000
Closing Date
22 May 2026, 6:00 pmClosed
Executive Engineer, Sujlam Suflam Division No.2 Visnagar
Providing Parapet Fencing & Steel Grill, Whitewashing, Colour Work on SSSC Between Ch. 185.940km to Ch. 212.070 km
302758
04/2026-27
Open
Civil Works - Lift Irrigation Schemes
Mehsana
7 documents required · 6 mandatory · 1 optional
₹900
EXECUTIVE ENGINEER SUJALAM SUFALAM DIVISION NO 2 VISNAGAR
₹25,000
7 May 2026
7 May 2026
7 May 2026
22 May 2026
7 May 2026
Name of work: Providing Parapet Fencing & Steel Grill, Whitewashing, Colour Work on SSSC
Between Ch. 185.940km to Ch. 212.070km
(A) PercentageRateTender(UptoINR50Cr.)
Item Description of Item(with brief specification Rate In
Quantity Unit Amount
No and reference to book of specifications) figures
Excavation in all sorts of soil (including wet and slushy
condition of soil) with yellow, sandy, gravelly soil
including soft murrum & H.M. including sorting &
stacking and depositing the excavated stuff in uniform
layers as and where directed upto lead of 30 m and lift
as shown below including clearing the site etc.
compute (including dewatering)
(A) for all canal capacity(a) 0 to 3 Mt. depth
Providing and laying CC 1:2:4 grade using cement,
sand and crushed metal incuding providing and
2 erecting necessary form work, centering,vibrating, 44.00 Cum 5432.86
smooth finishing,watering and curing as directed with
all leads and lifts etc complete. (a) Sub structures
Providing and laying HYSD/TMT Fe 415 steel bar
reinforcement for R.C.C. works and anchor bar with
providing binding wires including cutting, bending,
welding, binding in position hooking, placing in
position with all leads & lifts etc. complete.(C) TMT Fe
Backfill with selected earth from out side borrow area
or from excavated usefull material including watering,
ramming, consolidation etc. with pneumatic templing
and lead upto 1.0 Km. and all lift etc. completed.
Finishing wall with water proofing cement paint of on
wall surfaces (Two coats) to give an approved brand
5 and manufacture and of required shape even shade 6715.00 Sqm 65.25
after thoroughly brushing the surface to remove all
dirt and remains of loose powered materials.
Painting lines, deashes, arrows, letters etc on roads,
Air fields and like in two coats with road marking
6 paint, brushing including cleaning the surface of all 29.00 Sqm 130.08
dirt, dust and other foreign matter. (i) Over 10cm in
Providing and erecting chain link jali at 2m interval
with M.S. Angle frame(2mx2m) of size 50x50x6 mm
fixed with 2 nos MS flat 50x6mm including all cost of
material, fabrication, erection, nut ,bolts and painting
with two coats of oil paint including one coat of primer
etc complete as per drawing and as directed.
Providing and fixing gauge plate of following size of
material fiberglass reinforced plastic with engraved
bands width and figures with necessary clits and
fasteners and fixing the same at the site of work etc
complete as directed
(e)For 0.20 mt. x 1.00 mt. gauge patti
Finishing with Epoxy paint (two or more coats) at all
9 locations prepared and applied on concrete work as 3471.00 Sqm 171.19
per manufacturer's specifications including
appropriate priming coat, preparation of surface, etc.
I/Weam/arewillingtocarryouttheworkat… ............................... %above/belowpercent
(Shouldbewritteninfiguresandwords)of the
estimatedratementionedabove.Amountofmy/our tender works out as under.
Estimatedamountputto tender Estimatedamountputto tender
Deduct………%below Add………%Above
Inwords Inwords
(B) ForItemRateTender(ForaboveINR50Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
andreferencetobookof In In
specifications) figures Words
(A)TotalTenderedAmount
(B)Rebateonabovetenderedamount(if any)%(in figure)……………………………… (in
(C)NetTenderedAmount(A-B)(infigure)………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work
asdirected by the Engineer-In-Charge for which no extra payment shall be made.
2 Thelabourcesswillbe deductedasperprevailingrulesi.e.1%ofthework done.
3 GSTandIncometaxTDSwillbedeductedatasourcewhilemakingpaymentsof bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R. NO.: MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the cost of difference of
cement consumption have been deducted from the rate of original item at the rate of
input rate mentioned in all the tender
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.Letter Nivida No.4 of 2026-27.pdf
2.Detail Nivida.pdf
3.Nivida 4 of 2026-27 guj and eng.pdf
4.R1 SBD Canal Fencing.pdf
5.Schedule B .pdf
Download all tender documents and submit your bid