Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96,793Accepted-AOC MARAR RANCHI ROAD DISTT RAMGARH JHARKHAND | RAMGARH | JHARKHAND | L1 | Accepted-AOC SINCE L1 | |
| 2 | L2₹84,104+₹2,076 (2.53%)Rejected-Finance MARAR RANCHI ROAD DIST RAMGARH JHARKHAND 829117 | MARAR | RAMGARH | JHARKHAND | 829117 | L2 | Rejected-Finance SINCE L2 | |
| 3 | L3₹85,714+₹3,686 (4.49%)Rejected-Finance MOHAMMAD IMTIYAZ CHITARPUR RAMGARH 825101 JHARKHAND INDIA | CHITARPUR | RAMGARH | JHARKHAND | 825101 | L3 | Rejected-Finance SINCE L3 |
| Sl No | Description | Qty | Unit | M/S BHARAT MOTORS L1 | M/S SONY ENGINEERING &ELECTRICAL WORKS L3 | M/S NATIONAL ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00 | Rear hub dram | 2 | nos | 4,800 ₹9,600 Lowest | 5,100 ₹10,200 | 5,000 ₹10,000 |
| 2.00 | Rear wheel bearing(inner) | 2 | nos | 1,487 ₹2,974 Lowest | 1,560 ₹3,120 | 1,520 ₹3,040 |
| 3.00 | clutch housing with bolts | 1 | set | 4,500 ₹4,500 Lowest | 4,700 ₹4,700 | 4,650 ₹4,650 |
| 4.00 | Radiator reapiring& cleaning | 1 | no | 1,980 ₹1,980 Lowest | 2,120 ₹2,120 | 2,050 ₹2,050 |
| 5.00 | spring leaf rear and front | 2 | nos | 3,600 ₹7,200 Lowest | 3,700 ₹7,400 | 3,650 ₹7,300 |
| 6.00 | spring leaf 2nd changing | 2 | nos | 3,400 ₹6,800 Lowest | 3,500 ₹7,000 | 3,450 ₹6,900 |
| 7.00 | break came changing rear and front | 3 | nos | 3,630 ₹10,890 Lowest | 3,710 ₹11,130 | 3,670 ₹11,010 |
| 8.00 | steering bend arm | 2 | nos | 2,425 ₹4,850 Lowest | 2,530 ₹5,060 | 2,470 ₹4,940 |
| 9.00 | Fuel pump celebration with changing of element D.V fleriwet repairing kit etc. | 1 | job | 9,800 ₹9,800 Lowest | 10,100 ₹10,100 | 10,000 ₹10,000 |
| 10.00 | Nozzle complete overhauling with changing element & setting.(06 nos) | 1 | job | 5,300 ₹5,300 Lowest | 5,700 ₹5,700 | 5,600 ₹5,600 |
Tender Value
Refer Docs
EMD Value
₹1,300
Closing Date
20 Oct 2022, 6:55 pmClosed
P.E(ENM)KUJU PROJECT
KUJU PROJECT
Repairing of Leyland model truck no.BHM-1899 of kuju colliery
2022_CCL_258741_1
P.E/EnM/Kuju/eTender/22-23/07
Open Tender
Electrical and Maintenance Works
Item Rate
10 days
KUJU PROJECT
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,300
17 Aug 2025
10 Oct 2022
21 Oct 2022
10 Oct 2022
20 Oct 2022
10 Oct 2022
10 Oct 2022 - 14 Oct 2022
Amount
Rear hub dram
Rear wheel bearing(inner)
clutch housing with bolts
Radiator reapiring& cleaning
spring leaf rear and front
spring leaf 2nd changing
break came changing rear and front
steering bend arm
Fuel pump celebration with changing of element D.V fleriwet repairing kit etc.
Nozzle complete overhauling with changing element & setting.(06 nos)
Armature rewinding with commutator
field coil repairing and taping
carbon brush holder with brush
plunger assly changing
U-Bolt front
U-Bolt front
Fitting labour charges:-
(a) skilled manpower 02 nosX03 days
(b) unskilled manpower 02 nos X 02 days
Total impact of GST for the purpose of CTC
M/S NATIONAL ENTERPRISES
M/S SONY ENGINEERING &ELECTRICAL WORKS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .