| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.7 LAccepted-AOC | ₹13.7 L | L1 | Accepted-AOC AOC |
| 2 | L2₹13.7 L+₹687 (0.05%)Rejected-Finance 74 MANICK BANDOPADHYAY SARANI KOLKATA 700040 | KOLKATA | KOLKATA | WEST BENGAL | 700040 | ₹13.7 L+₹687 (0.05%) | L2 | Rejected-Finance 2ND LOWEST |
| 3 | L3₹13.7 L+₹1,236 (0.09%)Rejected-Finance | ₹13.7 L+₹1,236 (0.09%) | L3 | Rejected-Finance 3RD LOWEST |
| 4 | Rejected-Technical CHOTTO GANTI P O GANTI P S NARAYANPUR KOLKATA 700 132 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700132 | - | - | Rejected-Technical Improper documents |
Tender Value
₹13.7 L
EMD Value
₹27,455
Closing Date
9 Feb 2026, 1:00 pmClosed
EXECUTIVE ENGINEER PWD DIAMOND HARBOUR DIVISION
O/O THE EE PWD PWD COMPOUND KALPUKURPARA SOUTH 24 PGS
Estimate for Permanent Restoration of damage which caused due to pipe laying by KMDA ( For laying Raw water pipeline from existing PHE intake point at Dongaria, 24Pgs (S) to existing KMDA W.T.P. at Diamond Harbour Municipality along P.W.D. Road unde
2026_WBPWD_992568_1
WBPWDEEDHDe_NIT_28_2025_26
Open Tender
CIVIL WORKS
Percentage
30 days
DIAMOND HARBOUR
Please refer Tender documents.
4 documents required · 4 mandatory
₹27,455
Yes
17 Sept 2026
21 Jan 2026
11 Feb 2026
21 Jan 2026
9 Feb 2026
21 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works)
(ii) In mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.) | 495.26 | Cum | 89.9 | ₹44,523.69 |
| 2 | Picking up and removing old bituminous layer or sand sealing coat from old black topped surface and cleaning the exposed surface by scraping and stacking the material as directed.(b) By mechanical means (without milling machine) : (ii) From 50 mm to 100 mm thick. | 63.75 | Sqm | 7.5 | ₹478.13 |
| 3 | Dismantling of Flexible Pavements Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specifications Clause 202 for Rural Roadsof MORD.
(I) By Manual Means(b) Granular Courses | 15.94 | Cum | 453 | ₹7,219.91 |
| 4 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, undating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. | 364.82 | Cum | 1,628.17 | ₹5,93,985.72 |
| 5 | Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction.(b) Double brick flat soling (thickness 150 mm.) | 30 | Sqm | 658 | ₹19,740 |
| 6 | Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(i) For Construction of Sub Base by compacting 1st class brick aggregates (40 mm down) and sand (in proportion of 60:40). | 68.4 | Cum | 2,689.81 | ₹1,83,983 |
| 7 | Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).(ii) For Construction of Sub Base by compacting stone chips and sand (in proportion of 40:60).
(i) For Construction of Sub Base by compacting Salvage materials ( in place of 5.6mm stone chips) and sand. | 63.62 | Cum | 2,130.8 | ₹1,35,559.37 |
| 8 | Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader etc. (i) For Construction of Sub Base by compacting Salvage materials ( in place of 5.6mm stone chips) and sand. By reuse of Salvage Materials Received from excavation @ 30% of (Sl no.3) | 4.78 | Cum | 1,118.6 | ₹5,348.03 |
| 9 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1 for Rural Roads of MORD. (Borrow pit /pre work post work measurement) | 91.2 | Cum | 264.2 | ₹24,095.04 |
| 10 | Granular Sub-base with Graded Material (Table:- 400-1) Construction of granular sub-base by providing graded material, mixing in Wet Mix Plant at OMC, carriage of mixed material to work site, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory power roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants and cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). | 7.5 | Cum | 2,385.55 | ₹17,891.63 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.91 MB
BOQ_2427165.xls
BOQ • 0.32 MB
2911.pdf
Tender Documents • 1.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .