Tender Value
₹45.5 L
EMD Value
₹4.3 L
Closing Date
18 Feb 2026, 2:20 pmClosed
OFFICE OF SE BLY CIRCLE BLY
OFFICE OF SE BLY CIRCLE BLY
Construction operation safety maintenance of Pantoon Bridge Ferry at Hardoi Ghat located on the Dijoda river and the task of shifting the pantoon etc to a safe place before the rainy season in Distt Bareilly financial year 2025-26
2026_CEBLY_1115712_1
1106/E-Tender/ 2025-26 dated 31-01-2026
Open Tender
Civil Works - Others
240 days
BAREILLY
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,725
₹4.3 L
Yes
OFFICE OF SE BLY CIRCLE BLY
12 Mar 2026
13 Feb 2026
18 Feb 2026
13 Feb 2026
18 Feb 2026
13 Feb 2026
16 Feb 2026
Cartage of Pantoon below item with proper completion of the work including cost of all material labour and T&P etc. from from Hazipur ghat to Mankari Hardoi Ghat
Sall Sleeper
R.S. Joist
Railing Post
Sal Edging
Iron Anchor (SOR Barreilly Circle
Cartage of heavy articles like pantoon and Machineries etc. including loading unloading from Hazipur ghat to Mankari-Hardoi Ghat
Supply of 10 mm dia steel wire rope including cost of material loading, unloading, stacking and all other charges and taxes.S.I. No.-40 (ii)
Supply and laying of empty cement bags filled with local earth sand and carriage up to site of work including stiching loading and unloading stacking and also including supply of all material labour T&P required for proper completion of the work etc.as per direction of Engineer In charge. N.S.I. No.-1
Supply of 10 mm dia Nariyal rope (Bagai Ban) including cost of material loading, unloading, stacking and all other charges and taxes. S.I. No.-12
Supply of culcutta sutali including cost of material loading, unloading, stacking and all other charges and taxes. S.I. No.-04
Supply of Mallahi keel including cost of material loading, unloading, stacking and all other charges and taxes. 15 cm to 30 long S.I. No.-15
Supply of Poly Papline rope (ISI Mark) including cost of material loading, unloading, stacking and all other charges and taxes.
Supply of 30 mm dia and 15-35 cm long Nut Bolt including cost of material loading, unloading, cartage upto site and other charges inlcluding trade tax.S.I. No.-6
Supply of 13 -16 mm dia and 16x300 mm long Nut Bolt including cost of material loading, unloading, cartage upto site and other charges including trade tax. S.I. No.-8
Supply of M.S. washer of 20-30 mm size including cost of material loading, unloading, cartage upto site and other charges inlcluding trade tax. S.I. No.-5
Cartage of various item such as 10 mm & 20 mm dia steel wire rope 10 mm & 40 mm dia Nariyal rope, Culcutta sutali, Mallahi keel, Nut Bolt & M.S. washer etc. including loading unloading and stacking. SI No.-16
Clearing jungle including uprooting of vegetation grass, bush, wood, trees and sapling of girth up to 30cm. Measured at a height of 1 m. above ground level & removal of rubbish upto a distance of 50m. Outside the periphery of area.
Construction of Subgrade and Earthen shoulder with approved material obtained from Borrow-pits with all leads & lifts, transporting to site, spreading, grading to required slope and compacting to meet requirements etc as per MORD clause 300.2 with a lead upto 1000m.as per technecal specification clause 303.1 (Carted Earth work)
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1 and 300.2as per Technical Specification Clause 301.5Exculding Royalty.
Dragging the Pantoon from dry bed to river water & making pairs & anchoring in D/S side of River (Kumbh Mela SI No.-2)
Carrying of Pantoon pairs from place of anchoring(D/S side of Bridge) to the alingnment of Bridge in the water and fixing the same with other pantoons & refixing the same in Bridge alignment. (Kumbh Mela SI No.-3)
During Carrying of Pantoon pairs from place of anchoring(D/S side of Bridge) in water & then cross the dry bed/shallow water on the way up to alingnment with disconnecting pantoon pairs & rolling the pantoons , fixing of alignment after making pairs to form a part of Bridge. (Kumbh Mela SI No.-4)
Sinking pantoon to obtain the proper gradient as laid in dry bed/shallow water in the alignment of bridge as per direction of E/I (Kumbh Mela SI No.-5)
Supply of wooden anchor (2.40x1.80x3.10) with 10 to 15 cm uklyptus balli (Kumbh Mela Misc. SI No.-26a)
Carriage of wooden anchor from store to bidge head including loading, unloading & carriage as per E/I (Kumbh Mela SI No.-12)
Laying of wooden anchor in the river on up/down stream side of pantoon bridge I/c their weaving, packing the sand filled bags (avg 90 bags) before fixing with coir rope as per direction of E/I (Kumbh Mela SI No.-6)
Supply of eucolyptus ballies of 150 mm. dia & Av. 3.00 m Lenth (150 Nos. Ballies). (As per Kumbh SOR S.I.No 35(i))
Supply of eucolyptus ballies of 100 cm. dia & Av. 3.00 m Lenth (150 Nos. Ballies). (As per Kumbh SOR S.I.No 35(ii))
Supply of eucolyptus ballies of 120 cm. dia & Av. 3.00 m Lenth (150 Nos. Ballies). (As per Kumbh SOR S.I.No 35(iii))
Cartage of R.S. joist (5.2 mtr. Long) Loading unloading cost of carriage from central store and placing on site as per direction of E/I SI No.-11
Fixing of railing post including making hole with the help of drill machine over sleeper and sall edging before fixing the railing post with help of 30-16 mm size bolt of 1.25 mtr. Center to center including completion of work. SI No.-8
Fixing of railing wire through hole of railing post due to vertical post main wire stay of each rows and tighten of the stay clamps including making the hole in vertical ballies labour only. SI No.-16
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1 and 300.2as per Technical Specification Clause 301.5Exculding Royalty.
Carraige and laying sall sleeper loading unloading cost of carriage from certral store and decking on the bridge as per direction of E/I SI No.-9(i)
Same as above item but as sall wood edging. S. No.-9 (ii)
Repair of old pantoon including M.S. Sheet, Welding work, Generator and J.C.B. etc. as direction of E/I.
Supply of Chokidar For protection of Dippartmentle Material such as Sleepers,bolts,and other material (Day and night)
Providing & laying Brick Ballast . (40mm gauge) For approach Road. As per SOR
Brick soling with straight over burnt bricks laid on edge and dry including preparation of subgrade to prescribed camber and including supply of bricks, filling joints with local earth, spreading blinding coat of 1 cm (3/8") depth of local earth of P.I. 5 to 7 or sand over the entire surface and including labour and T&P etc. required for proper completions of the work. As per SI No.-762(b)
Carrying and spreading of kansa poola 5 cm thick over bridge road way before filling of 7.5 cm thick kapsa soil including cartage of kapsa soil from a distance of 1.00 km, On either side of bridge & spreading ramming and dressing the surface as per direction. As per S.I. No.-5
Spreading of sand (Labour Rate). As per S.I. No.-30
Making stay on both side of pantoon bridge with the help of 20 mm / 10 mm wire rope (labour only . As per S.I. No.-36
Cartage of various item such as 10 mm & 20 mm dia steel wire rope 10 mm & 40 mm dia Nariyal rope, Culcutta sutali, Mallahi keel, Nut Bolt & M.S. washer etc. including loading unloading and stacking etc at central store. S.I. No.-16
Extracting 10 mm dia wire rope railing post and making role etc. S.I. No.-4
Dismantling and carrying of railing post fixed in position including opening of 300x16 mm Nutbolt including loading unloading cartage. S.I. No.-6
Dismantling and carrying sall sleeper in dacking over the bridge including cleaning the kapsa soil and kansa poola loading unloading carraige and duly stacked at store. S.I. No.-8
Carrying the R.S. joist 5.20 mtr. Long between two pantoon after dismanlting of pantoon pair loading unloading carraige and duly stacked at store. S.I. No.-9
Dismantling of Pontoon bridge and shifting them from bridge site to place of anchoring including dragging of pontoons to cross the dry bed/shallow water on the way including disconnection of pontoon pair and rolling the pontoon in dry bed/shallow water and making pair of pontoon for safe shifting of pontoons to the place of anchoring including supply of all labour and T&P etc. as per direction of engineer in charge. (As per Kumbh SOR) (S.I.No.13)
Dismantling of Pontoon bridge after dismantling from bridge site to hazipur store including hulege of pantoon up to river bank disconecting the pantoon loading unloading with the help of crain,labour,T&P etc,as per direction of E/I. (As per Kumbh SOR)
Hire of 03 private mallah for four month (16 June to 15 October) on contract base for protection of pantoon in reany season.(day & night)
Apply priming coat over new steel and other metal surface after and including preparing the surface throughly cleaning oil grease dirt and other foreign matter and scoured with wire brushes ,fine steel /wood scrappers sand papering and knotting including cost of all materials, labour abd T&P etc required for proper completion of the work.(Sor Ch painting & distempring S.no 01)
Painting first coat over priming coat(but excluding cost of priming coat) on wood or steel snd other metal surface with superior synthetic enamel standard make brushing to give an even shade and finish and includjng cleaning the surface of all dirt dust and other foreign matter sand papering and stripping including cost of all materials ,labour ,T&P etc required for the proper complition of the work.(Sor Ch painting & distempring S.no 02)
Same as in item above but for every subsequent coat after first coat on wood or steel surface with paint of Superior quality..(Sor Ch painting & distempring S.no 03-iii)
Maintenance,protection and traffic regulation of Mankari-Hardoi Ghat on Dijoda river during operation including all taxes etc.
Tractor with water Tanker with driver including fuel & cost of water for approach of pantoon bridge. (Kaccha)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.78 MB
T2.pdf
Tender Documents • 1.13 MB
BOQ_2070659.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid