Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC VILL GHAGHETTA PO SALAN TEH THURAL DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 175013 | ₹1.5 L | L1 | Accepted-AOC Lowest-1st |
| 2 | L2₹1.5 L+₹2,773.38 (1.89%)Rejected-Finance | ₹1.5 L+₹2,773.38 (1.89%) | L2 | Rejected-Finance Highest bidder |
| 3 | L3₹1.5 L+₹4,530.77 (3.09%)Rejected-Finance VILLAGE AMARU PO SAI TEH BADDI DISTT SOLAN H P | BADDI | SOLAN | HIMACHAL PRADESH | ₹1.5 L+₹4,530.77 (3.09%) | L3 | Rejected-Finance Highest bidder |
| 4 | L4₹1.7 L+₹23,311 (15.9%)Rejected-Finance | ₹1.7 L+₹23,311 (15.9%) | L4 | Rejected-Finance Highest bidder |
| 5 | L5₹1.7 L+₹25,655.89 (17.5%)Rejected-Finance R O PRIMTA NIWAS GAHAN SANJAULI SHIMLA 171006 | SHIMLA | HIMACHAL PRADESH | 171006 | ₹1.7 L+₹25,655.89 (17.5%) | L5 | Rejected-Finance Highest bidder |
| Sl No | Description | Qty | Unit | AJAY SINGH L4 | KRISHAN SINGH L1 | Rajinder Singh L3 | Vikram Singh L5 | VISHAL GULERIA L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | P/F Manhole cover made of angle iron frame of 32 x 5 mm covered with MS sheet 1.66 mm thick along with complete locking arrangement having total weight not less than 40 kgs complete in all respects within all leads and lifts a per complete direction and satisfaction of engineer in charge. | 5 | Each | 2,800 ₹14,000 | 1,500 ₹7,500 Lowest | 1,800 ₹9,000 | 2,500 ₹12,500 | 1,750 ₹8,750 |
| 2.00 | Steel work in single section 45x45x5 mm including cutting hoisting fixing in position and applying priming coat in RS joints n gratings guard wall ladders railing and similar works within all leads and lifts as per direction and satisfaction of engineer in charge comlete in all respects. | 183.6 | P/kg | 90 ₹16,524 | 90 ₹16,524 | 35 ₹6,426 Lowest | 90 ₹16,524 | 40 ₹7,344 |
| 3.00 | Providing & fixing Cast Iron double flanged sluice valve various dia of Kirloskar /KSB/ Kilburn / BHEL/ Leader make of following dia and class PN- 1.6 capable of with standing nominal seat pressure of 16.00kg/Cm2. (as per IS -780-1984 latest with up to date ammendments if any) complete in all respect as per diection and and satisfaction of engineer in charge .100mm | 3 | Each | 10,999 ₹32,997 Lowest | 11,500 ₹34,500 | 11,000 ₹33,000 | 11,000 ₹33,000 | 11,000 ₹33,000 |
| 4.00 | Removal of slips /silt/sand in all kind of soils ( including saturated soils but excluding the boulders and rocky portion requiring blasting up to a distance of 20 mtrs. Disposing off unserviceable material , stacking serviceable material and neatly dressing the surface including deployment of generator and raw water pump for removal of water from the percolation well/ gallery in order to remove the deposited material ) complete in all respects within all leads and lifts as per direction and satisfaction of engineer in charge. | 42.52 | P/cum | 460 ₹19,559.2 | 300 ₹12,756 | 300 ₹12,756 | 635 ₹27,000.2 | 290 ₹12,330.8 Lowest |
| 4.01Repair of pump house | ||||||||
| 5.00 | Demolition of cement concrete in flooring in 1:2:4 (1 cement :2 sand :4 aggregate) including disposal of the waste material complete in all respect as per entire satisfactionn of Engineer in charge.(Pump house Slab) | 23.94 | P/sqm | 390 ₹9,336.6 | 50 ₹1,197 Lowest | 120 ₹2,872.8 | 65 ₹1,556.1 | 250 ₹5,985 |
| 6.00 | Demolition of old 15 mm thick plaster in C.M. 1:6 ( 1 cement : 6 sand ) including disposal of the waste material with in all leads and lifts complete in all respect as per entire satisfaction of Engineer in charge. | 69.56 | P/sqm | 45 ₹3,130.2 Lowest | 50 ₹3,478 | 80 ₹5,564.8 | 85 ₹5,912.6 | 70 ₹4,869.2 |
| 7.00 | Demolition of old 6 mm thick plaster in ceiling in C.M. 1:3 ( 1 cement : 3 sand ) including disposal of the waste material with in all leads and lifts complete in all respect as per entire satisfaction of Engineer in charge. | 23.94 | P/sqm | 37 ₹885.78 Lowest | 50 ₹1,197 | 65 ₹1,556.1 | 72 ₹1,723.68 | 60 ₹1,436.4 |
| 8.00 | Cement concrete in flooring in 1:2:4(1 cement :2 sand :4 aggregate) complete in all respect as per entire satisfactionn of Engineer in charge. | 23.94 | P/sqm | 390 ₹9,336.6 | 200 ₹4,788 Lowest | 1,300 ₹31,122 | 255 ₹6,104.7 | 1,200 ₹28,728 |
| 9.00 | 15 mm thick plaster in C.M. 1:3 ( 1 cement : 3 sand ) including disposal of the waste material with in all leads and lifts complete in all respect as per entire satisfaction of Engineer in charge. | 89.66 | P/sqm | 160 ₹14,345.6 | 200 ₹17,932 | 140 ₹12,552.4 | 190 ₹17,035.4 | 138 ₹12,373.08 Lowest |
Tender Value
₹1.8 L
EMD Value
₹3,643
Closing Date
23 Mar 2026, 11:00 amClosed
Executive Engineer
Executive Engineer Jal Shakti Division Fatehpur
Restoration of rain damage of LWSS Kural Kasiyal in Tehsil Fatehpur Distt. Kangra
2026_HPIPH_131388_1
NIT NO.10290-10325 dated 11.03.2026
Open Tender
Civil Works
Item Rate
Tehsil Fatehpur
As per notice inviting Tender
8 documents required · 8 mandatory
₹500
EE Fatehpur
₹3,643
18 Sept 2026
12 Mar 2026
23 Mar 2026
12 Mar 2026
23 Mar 2026
12 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | P/F Manhole cover made of angle iron frame of 32 x 5 mm covered with MS sheet 1.66 mm thick along with complete locking arrangement having total weight not less than 40 kgs complete in all respects within all leads and lifts a per complete direction and satisfaction of engineer in charge. | 5 | Each | - | - |
| 2 | Steel work in single section 45x45x5 mm including cutting hoisting fixing in position and applying priming coat in RS joints n gratings guard wall ladders railing and similar works within all leads and lifts as per direction and satisfaction of engineer in charge comlete in all respects. | 183.6 | P/kg | - | - |
| 3 | Providing & fixing Cast Iron double flanged sluice valve various dia of Kirloskar /KSB/ Kilburn / BHEL/ Leader make of following dia and class PN- 1.6 capable of with standing nominal seat pressure of 16.00kg/Cm2. (as per IS -780-1984 latest with up to date ammendments if any) complete in all respect as per diection and and satisfaction of engineer in charge .100mm | 3 | Each | - | - |
| 4 | Removal of slips /silt/sand in all kind of soils ( including saturated soils but excluding the boulders and rocky portion requiring blasting up to a distance of 20 mtrs. Disposing off unserviceable material , stacking serviceable material and neatly dressing the surface including deployment of generator and raw water pump for removal of water from the percolation well/ gallery in order to remove the deposited material ) complete in all respects within all leads and lifts as per direction and satisfaction of engineer in charge. | 42.52 | P/cum | - | - |
| 4.01 | Repair of pump house | - | - | - | - |
| 5 | Demolition of cement concrete in flooring in 1:2:4 (1 cement :2 sand :4 aggregate) including disposal of the waste material complete in all respect as per entire satisfactionn of Engineer in charge.(Pump house Slab) | 23.94 | P/sqm | - | - |
| 6 | Demolition of old 15 mm thick plaster in C.M. 1:6 ( 1 cement : 6 sand ) including disposal of the waste material with in all leads and lifts complete in all respect as per entire satisfaction of Engineer in charge. | 69.56 | P/sqm | - | - |
| 7 | Demolition of old 6 mm thick plaster in ceiling in C.M. 1:3 ( 1 cement : 3 sand ) including disposal of the waste material with in all leads and lifts complete in all respect as per entire satisfaction of Engineer in charge. | 23.94 | P/sqm | - | - |
| 8 | Cement concrete in flooring in 1:2:4(1 cement :2 sand :4 aggregate) complete in all respect as per entire satisfactionn of Engineer in charge. | 23.94 | P/sqm | - | - |
| 9 | 15 mm thick plaster in C.M. 1:3 ( 1 cement : 3 sand ) including disposal of the waste material with in all leads and lifts complete in all respect as per entire satisfaction of Engineer in charge. | 89.66 | P/sqm | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_194238.xls
BOQ • 0.29 MB
form6.pdf
Tender Documents • 0.14 MB
form8.pdf
Tender Documents • 1.41 MB
tc.pdf
Tender Documents • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .