| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Finance 0 MATADIN KAKRAHI KAKRAHI BHARTHANA ETAWA ETAWAH UTTAR PRADESH 206242 | ETAWAH | UTTAR PRADESH | 206242 | ₹2.0 L | L1 | Admitted-Finance |
| 2 | L2₹2.0 L+₹5,157 (2.61%)Admitted-Finance BANIKHET NAVEEN KUMAR BANIKHET CHAMBA HIMACHAL PRADESH 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | ₹2.0 L+₹5,157 (2.61%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical VILLAGE THAROT PO CHARRI TEHSIL SHAHPUR DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 176001 | - | - | Not Admitted-Fee/PreQual/Technical Others-copy of income Tax Return not upload |
| Sl No | Description | Qty | Unit | Sanjeev Kumar L1 | Naveen Kumar L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches etc.in earth work in all kinds of soil such as pick work,jumper work, blasting in soft and hard rock and chiselling work including saturated soil slushy soil and under floor upto all depth and stacking the excavated soil not more than 3 metre clear from the edge of excavation and then returning the stacked soil in 15 centimetre (Fifteen centimetre) layer when required into plinth sides of foundation etc.consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer-in-charge. | 15.31 | Cum | 350 ₹5,359 | 300 ₹4,593 Lowest |
| 2.00 | Providing and laying Cement concrete 1:6:12 (1 Cement:6 Sand:12 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth complete in all respect including all leads and lifts. | 2 | Cum | 6,295 ₹12,590 | 5,100 ₹10,200 Lowest |
| 3.00 | Providing and laying cement concrete work 1:2:4 (1 Cement:2 Sand:4 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in : Colum Pillars and struts Complete upt to floor level complete within all leads and lifts. | 9.5 | Cum | 8,695 ₹82,603 | 7,300 ₹69,350 Lowest |
| 4.00 | Providing tor steel reinforcement for RCC work i/c bending binding and placing in position complete including cost of binding wire up to all floor level with in all leads and lifts. | 852.6 | Kg | 90 ₹76,734 | 88 ₹75,029 Lowest |
| 5.00 | Providing form work with steel plates 3.15mm thick welded with angles iron in frame 30x30x5mm so as to give a fair finish i/c centring.shuttering,propping etc height of propping and centring below supporting floor to ceiling not exceeding 14 mtrs.height of propping and centring below supporting removal of the same for in situ work in reinforced concrete & plain concrete work:-Columns, pillars posts and struts. (Square rectangular, polygonal in plan ) | 45.12 | Sqm | 250 ₹11,280 Lowest | 450 ₹20,304 |
| 6.00 | Supplying Hosing,straching and holding in position to specified profile wire ropes for suspension bridge including guy ropes in all leads and lifts and to the entire satisfaction of Engnieer -in-Charge. | 0.6 | Qtl | 15,000 ₹9,000 | 12,500 ₹7,500 Lowest |
| 7.00 | Providing and Fixing in position mild steel accessories like clamps,Suspenders,ropes,gripes,u-bolt with pully etc.along with fixturefor suspension bridge comlete in all leads and lifts and to the entire satisfaction of Engineer -in-Charge. | 1.52 | Qtl | 140 ₹213 Lowest | 10,500 ₹15,960 |
Tender Value
₹2.0 L
EMD Value
₹3,985
Closing Date
5 Aug 2026, 11:00 amClosed
Executive Engineer
Jal Shakti Division Kangra
Construction of Khad/Nallah Crossing at Jatehar Khad) (Deposit Work).
2026_HPIPH_139966_1
EE/JSDK/NIT/2026- 4148 - 97 Dt.25-07-2026
Open Tender
Civil Works
Item Rate
90 days
Kangra
Please refer Tender documents.
6 documents required · 6 mandatory
₹350
₹3,985
14 Aug 2026
25 Jul 2026
5 Aug 2026
25 Jul 2026
5 Aug 2026
25 Jul 2026
25 Jul 2026 - 5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation trenches etc.in earth work in all kinds of soil such as pick work,jumper work, blasting in soft and hard rock and chiselling work including saturated soil slushy soil and under floor upto all depth and stacking the excavated soil not more than 3 metre clear from the edge of excavation and then returning the stacked soil in 15 centimetre (Fifteen centimetre) layer when required into plinth sides of foundation etc.consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer-in-charge. | 15.31 | Cum | - | - |
| 2 | Providing and laying Cement concrete 1:6:12 (1 Cement:6 Sand:12 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth complete in all respect including all leads and lifts. | 2 | Cum | - | - |
| 3 | Providing and laying cement concrete work 1:2:4 (1 Cement:2 Sand:4 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in : Colum Pillars and struts Complete upt to floor level complete within all leads and lifts. | 9.5 | Cum | - | - |
| 4 | Providing tor steel reinforcement for RCC work i/c bending binding and placing in position complete including cost of binding wire up to all floor level with in all leads and lifts. | 852.6 | Kg | - | - |
| 5 | Providing form work with steel plates 3.15mm thick welded with angles iron in frame 30x30x5mm so as to give a fair finish i/c centring.shuttering,propping etc height of propping and centring below supporting floor to ceiling not exceeding 14 mtrs.height of propping and centring below supporting removal of the same for in situ work in reinforced concrete & plain concrete work:-Columns, pillars posts and struts. (Square rectangular, polygonal in plan ) | 45.12 | Sqm | - | - |
| 6 | Supplying Hosing,straching and holding in position to specified profile wire ropes for suspension bridge including guy ropes in all leads and lifts and to the entire satisfaction of Engnieer -in-Charge. | 0.6 | Qtl | - | - |
| 7 | Providing and Fixing in position mild steel accessories like clamps,Suspenders,ropes,gripes,u-bolt with pully etc.along with fixturefor suspension bridge comlete in all leads and lifts and to the entire satisfaction of Engineer -in-Charge. | 1.52 | Qtl | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
Form6and8.pdf
Tender Documents • 0.71 MB
Termsandconditions.pdf
Tender Documents • 0.21 MB
BOQ_207457.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .