Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
30 May 2026, 6:00 pmClosed
The Executive Engineer
Various Diversion of VRB`s on Limbdi Branch Canal (Second Attempt)
304829
02 of 2026-27 (Second Attempt)
Open
Civil Works - Canal
Works
Surendranagar
6 documents required · 6 mandatory
₹4,248
Executive Engineer SBC Dn No.4/1 Limbdi
₹1.4 L
13 May 2026
13 May 2026
13 May 2026
30 May 2026
13 May 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional and are
given to provide a common basis for bidding. The basis of payment will be the actual
quantities of work ordered and carried out, as measured by the Contractor and verified
by the Engineer and valued at the rates and prices tendered in the priced Bill of
Quantities, where applicable, and otherwise at such rates and prices as the Engineer
may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as it
is otherwise provided under the Contract, include all construction plant, layout,
supervision, materials, erection, maintenance, insurance, profit, taxes and duties,
together with all general risks, liabilities and obligations set out or implied in the
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed to
enter a rate or price shall be deemed to be covered by other rates and prices entered in
the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in
the items provided in the priced Bill of Quantities, and where no Items are provided
the cost shall be deemed to be distributed among the rates and prices entered for the
related items of Work.
7. General direction and descriptions of work and materials are not necessarily repeated
or summarized in the Bill of Quantities. References to the relevant sections of the
contract documentation shall be made before entering rates or prices against each item
in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for canal work Road and Bridge works. For building works
specifications for building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic error pursuant to Clause
29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of compressed air
drilling for its removal, and which cannot be extracted by ripping with a tractor of at
least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Name of Division: Executive Engineer, S.B.C. Dn. No. 4/1, Limbdi.
Name of Work:- Various Diversion of VRB's on Limbdi Branch Canal.
Description of Item Quantity Unit Rate Amount
Excavation in all sort of strata and formations
incl. depositing the unuseful excavated stuff as
and where directed incl sorting 1 and stacking
useful materials as directed upto 30 mt lead etc.
1 complete incl. dewatering. (Depth 0 TO 3.0 mt ) 544.00 Cum 83.00
(For all type canal & foundation trenches of C.D.
A) IN OVERBURDEN INCL. HARD
Earthwork / Back filling with selected earth
brought from out side borrow area or from
2 excavated useful material incl. watering 26068.00 Cum 141.00
ramming, Compaction with pneumatic temping
and all lead and lift etc complete.
Box cutting the road surface to proper slope and
camber for making a base for road work
3(a) including removing the excavated stuff and 4590.00 Cum 109.41
depositing on the road side slope as directed upto
Rolling and consolidation of soling including
3(b) filling in depression which occur during the 9177.00 Sqmt 22.75
process, with power roler 8 tonne to 12 tonne.
Supplying of graded stone aggregate of
following sizes (for W.B.M. Road)(3) Crushed
4(a) stone aggregate for Hard Quality up to 63 mm 2754.00 Cum 490.40
size including Stone Dust for filling etc.
Spreading the stone aggregate for rolling and
W.B.M. including filling the interstices to
4(b) required camber and gradient (excluding 2754.00 Cum 262.24
spreading of Blindage)(ii) 40mm to 63mm size
aggregates (H.B.)
Supplying of well graded crushed stone
aggregates, chippings etc. of hard stone of
following nominal size free of disintegrated
pieces deletarious and oraganic mater for
Granular Sub Base Material as per MORTH
Spreading the stone aggregate for rolling and
W.B.M. including filling the interstices to
5(b) required camber and gradient (excluding 2754.00 Cum 262.24
spreading of Blindage)(iii) 25mm to 50mm size
Rolling and consolidating water bound macadam
(except laterite and Kankar) including watering
not exceeding 150mm thickness (Main layer
including binding materials ) including filling in
depressions which occur during the process.(A)
With power roller exceeding 8 tonne and not
exceeding 12 tonne.
Prov. and Laying in position Controlled cement
concrete using cement, sand and crushed
aggregate by mass and machine mix for
R.C.C/CC work including necessary formworks
centering scaffolding compaction by
vibrator,curing as directed with all lead & lift etc
complete Excluding the cost of reinforcement.
A) Concrete grade M-15 and MSA-20mm
Supplying and fixing road sign board of M.S.
plates and angle iron including painting, lettering
8 etc. complete including fixing in C.C. 1:4:8 with 50.00 Each 3072.99
necessary excavation etc. complete as per I.R.C.
type design.(ii) Reflective type
Providing and laying dry rubble stone pitching
without base , inverted filter and header stone
but with 10 cms thick murrum layer ( for base )
including hand packing & trimming & dressing
slopes etc complete. b) 23 cms thick stone
Total Amount Rs.
Total Amount Rs.
I/We am/are willing to carry out the work at… ....................... %above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item(with Quantity Unit Rate Amount
No brief specification and
reference to book of In In
specifications) figures Words
(A)Total Tendered Amount
(B)Rebate on above tendered amount (if any) % (in figure)
(C)NetTendered Amount(A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all P.C.C./R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as
per vernacular office letter no. 04 of 2024, Dt. 20/01/2024 of The Chief Engineer, Quality
Control (SSNNL) as stated in S.O.R. therefore in P.C.C./R.C.C. items where there is a change
as per Nominal mix the cost of difference of cement consumption have been deducted from
the rate of original item at the rate of input rate (i.e. 5448.53 Rs / MT for OPC) in all the
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice Various Diversion on VRB.pdf
SBD LBC VRB All Diversion.pdf
BOQ.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .