Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 CrAdmitted-Finance VILLAGE PHERUPUR RAMKHERA DHANPURA HARIDWAR UTTARAKHAND 249404 | HARIDWAR | HARIDWAR | UTTARAKHAND | 249404 | L1 | Admitted-Finance | |
| 2 | L2₹4.5 Cr+₹3.2 L (0.71%)Admitted-Finance 268 3A 16 CIVIL LINES ROORKEE HARIDWAR | HARIDWAR | HARIDWAR | UTTARAKHAND | L2 | Admitted-Finance | |
| 3 | L3₹4.6 Cr+₹10.2 L (2.27%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹4.9 Cr+₹44.1 L (9.86%)Admitted-Finance 250 SARATHI VIHAR DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHREE AADI SHIV CONSTRUCTION L3 | M/S HimalayanConstruction L4 | Ms Kay Kay Construction L2 | AMIT KUMAR SAINI THEKEDAR L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation for roadwork in soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 708.4 | Cum | 40 ₹28,336 | 41 ₹29,044.4 | 39.7 ₹28,123.48 Lowest | 40 ₹28,336 |
| 2.00 | Construction of gravel/soil-aggregate base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller to achieve the desired density, complete as per Technical Specifications Clause 402 | 404.8 | Cum | 1,723 ₹6,97,470.4 | 1,750 ₹7,08,400 | 1,696 ₹6,86,540.8 | 1,640 ₹6,63,872 Lowest |
| 3.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. (By Mechanical Means with 1 km lead) | 507.24 | Cum | 2,650 ₹13,44,186 | 3,100 ₹15,72,444 | 2,592 ₹13,14,766.08 | 2,200 ₹11,15,928 Lowest |
| 4.00 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 995.6 | Cum | 390 ₹3,88,284 | 400 ₹3,98,240 | 390 ₹3,88,284 | 350 ₹3,48,460 Lowest |
| 5.00 | Providing and Laying of Interlocking Concrete Block (M-35) Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504. | 1,065 | Sqm | 669.5 ₹7,13,017.5 | 670 ₹7,13,550 | 660 ₹7,02,900 | 640 ₹6,81,600 Lowest |
| 6.00 | Providing and laying of hot applied thermoplastic compound of ISI Mark Approved Quality of 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. | 1,486 | Sqm | 520 ₹7,72,720 | 522.5 ₹7,76,435 | 514.59 ₹7,64,680.74 | 500 ₹7,43,000 Lowest |
| 7.00 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C. grade M 20 Nominal mix (1:2:4) | 6.6 | Cum | 6,250 ₹41,250 | 6,250 ₹41,250 | 6,150 ₹40,590 | 5,950 ₹39,270 Lowest |
| 8.00 | Supply and fixing of Rumble strip made of PU poly urethane Size 500 x 100 x 15 mm in yellow and black combination weight of one strip should not be less than 480 gms approx all complete. | 330 | RM | 1,370 ₹4,52,100 | 1,380 ₹4,55,400 | 1,350 ₹4,45,500 Lowest | 1,360 ₹4,48,800 |
| 9.00 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 39,050 | Sqm | 21.5 ₹8,39,575 | 21.8 ₹8,51,290 | 21.45 ₹8,37,622.5 | 21 ₹8,20,050 Lowest |
| 10.00 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 39,050 | Sqm | 26.5 ₹10,34,825 | 26.5 ₹10,34,825 | 26 ₹10,15,300 Lowest | 26 ₹10,15,300 Lowest |
Tender Value
₹45,734
EMD Value
₹9.2 L
Closing Date
9 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer Civil Circle PWD Haridwar
Office Of SE, Civil Circle, PWD Haridwar
Strengthening work of motor road from Bahadrabad Rohalki Tiraha to Alipur Sukrasa Pathri Ambuwala under Kumbh Mela Infrastructure Development 2027
2026_pwd_101501_1
2792/06C-Civil Circle/26 dated-21.10.2026
Open Tender
Civil Works - Roads
Item Rate
60 days
Haridwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
EE, PD, PWD, Haridwar (Through E-Challan)
₹9.2 L
Civil Circle, PWD Haridwar
13 Nov 2026
22 Oct 2026
9 Nov 2026
22 Oct 2026
9 Nov 2026
24 Oct 2026
22 Oct 2026 - 24 Oct 2026
24 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadwork in soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 708.4 | Cum | 1.25 | ₹885.5 |
| 2 | Construction of gravel/soil-aggregate base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller to achieve the desired density, complete as per Technical Specifications Clause 402 | 404.8 | Cum | 1.25 | ₹506 |
| 3 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. (By Mechanical Means with 1 km lead) | 507.24 | Cum | 1.25 | ₹634.05 |
| 4 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 995.6 | Cum | 1.25 | ₹1,244.5 |
| 5 | Providing and Laying of Interlocking Concrete Block (M-35) Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504. | 1,065 | Sqm | 1.25 | ₹1,331.25 |
| 6 | Providing and laying of hot applied thermoplastic compound of ISI Mark Approved Quality of 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. | 1,486 | Sqm | 1.25 | ₹1,857.5 |
| 7 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C. grade M 20 Nominal mix (1:2:4) | 6.6 | Cum | 1.25 | ₹8.25 |
| 8 | Supply and fixing of Rumble strip made of PU poly urethane Size 500 x 100 x 15 mm in yellow and black combination weight of one strip should not be less than 480 gms approx all complete. | 330 | RM | 1.25 | ₹412.5 |
| 9 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 39,050 | Sqm | 1.25 | ₹48,812.5 |
| 10 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 39,050 | Sqm | 1.25 | ₹48,812.5 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.58 MB
SBD_Rohalki_new.pdf
Tender Documents • 3.52 MB
BOQ_119591.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .