Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.7 CrAccepted-AOC | ₹1.7 Cr Quoted ₹1.8 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹1.8 Cr+₹10,691.11 (0.06%)Rejected-Finance VILL ROUMARI WARD NO 1 P O P S ABHAYAPURI DIST BONGAIGAON ASSAM | BONGAIGAON | ASSAM | ₹1.8 Cr+₹10,691.11 (0.06%) | 2 | Rejected-Finance Refer to Financial Minutes |
| 3 | 3₹1.8 Cr+₹15,791.11 (0.09%)Rejected-Finance C O NINGNA RAM DAS HOUSE NO 15 GREEN VIEW COLONY TETELIA GUWAHATI PO MALIGAON PS JALUKBARI KAMRUP METRO 781011 | GUWAHATI | KAMRUP METRO | ASSAM | 781011 | ₹1.8 Cr+₹15,791.11 (0.09%) | 3 | Rejected-Finance Refer to Financial Minutes |
| Sl No | Description | Qty | Unit | BIPUL CH. DAS L1 | Dipen Ch. Das L2 | GAJI RAM DAS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) /
manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of
bottoms, lift upto 1.5 m, including getting out the excavated soil and
disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil | 527.92 | cum | 286.85 ₹1,51,432.63 Lowest | 286.85 ₹1,51,432.63 Lowest | 286.85 ₹1,51,432.63 Lowest |
| 2.00 | Dry brick on edge flooring in required pattern with bricks of class
designation 7.5 on a bed of 12 mm mud mortar, including filling joints
with Jamuna sand, with common burnt clay non modular bricks. | 688.16 | sqm | 607.2 ₹4,17,849.23 Lowest | 607.2 ₹4,17,849.23 Lowest | 607.2 ₹4,17,849.23 Lowest |
| 3.00 | Providing and laying in position cement concrete of specified grade
excluding the cost of centering and shuttering - All work up to plinth
level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural
sources : 6 graded stone aggregate 20 mm nominal size
derived from natural sources) | 31.6 | cum | 6,670.25 ₹2,10,758.14 Lowest | 6,670.25 ₹2,10,758.14 Lowest | 6,670.25 ₹2,10,758.14 Lowest |
| 4.00 | Providing and laying in position specified grade of reinforced cement
concrete, excluding the cost of centering, shuttering, finishing and
reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural
sources : 3 graded stone aggregate 20 mm nominal size de
rived from natural sources) | 213.36 | cum | 8,364.2 ₹17,84,572.27 Lowest | 8,364.2 ₹17,84,572.27 Lowest | 8,364.2 ₹17,84,572.27 Lowest |
| 5.00 | Reinforced cement concrete work in walls (any thickness), including
attached pilasters, buttresses, plinth and string courses, fillets, columns,
pillars, piers, abutments, posts and struts etc. above plinth level up to
floor five level, excluding cost of centering, shuttering, finishing and
reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size
derived from natural sources) | 93.79 | cum | 23,142 ₹21,70,393.88 Lowest | 23,142 ₹21,70,393.88 Lowest | 23,142 ₹21,70,393.88 Lowest |
| 6.00 | Steel reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more. | 22,589.59 | kg | 89.65 ₹20,25,156.92 Lowest | 89.65 ₹20,25,156.92 Lowest | 89.65 ₹20,25,156.92 Lowest |
| 7.00 | Steel reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position and binding all complete above plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more. | 8,437.81 | kg | 89.65 ₹7,56,449.25 Lowest | 89.65 ₹7,56,449.25 Lowest | 89.65 ₹7,56,449.25 Lowest |
| 8.00 | Centering and shuttering including strutting, propping etc. and removal
of form for Foundations, footings, bases of columns, etc. for mass concrete | 886.27 | sqm | 307.95 ₹2,72,928.39 Lowest | 307.95 ₹2,72,928.39 Lowest | 307.95 ₹2,72,928.39 Lowest |
| 9.00 | Centering and shuttering including strutting, propping etc. and removal
of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | 1,514.5 | sqm | 608.35 ₹9,21,346.08 Lowest | 608.35 ₹9,21,346.08 Lowest | 608.35 ₹9,21,346.08 Lowest |
| 10.00 | Centering and shuttering including strutting, propping etc. and removal
of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 1,096.52 | sqm | 804.25 ₹8,81,879.43 Lowest | 814 ₹8,92,570.54 | 814 ₹8,92,570.54 |
Tender Value
Refer Docs
EMD Value
₹3.4 L
Closing Date
28 Jan 2026, 2:00 pmClosed
MD, AIIDC
IE, Bamunimaidam, Guwahati-21
Developmental works of Industrial Estate, Kunderbari, Dist. Sonitpur (Phase-I)
2026_ICD_49999_1
AIIDC/3894/2024/8006
Open Tender
Civil Works
Works
270 days
Industrial Estate, Kunderbari
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,400
₹3.4 L
Yes
31 Mar 2026
7 Jan 2026
28 Jan 2026
7 Jan 2026
28 Jan 2026
10 Jan 2026
7 Jan 2026 - 28 Jan 2026
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil
Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand)
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. Cement mortar 1:4 (1 cement :4 coarse sand)
12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand)
15 mm cement plaster on the rough side of single or half brick wall of mix : 1:4 (1 cement: 4 fine sand)
Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content. With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre
Finishing walls with water proofing cement paint of required shade: New work (Two or more coats applied @ 3.84 kg/10 sqm)
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture
Manufacturing, supplying and fixing retro reflective overhead signage boards made up of 2 mm thick aluminium sheet, face to be fully covered with high intensity and encapsulated lens type heat activated retro reflective sheeting conforming to type - III of ASTM-D-4956-01 as approved by Engineer-in-charge, letters, borders etc. as per IRC : 67-2001 in silver white with blue colour back ground and with high intensity grade, pasted on substrate by pressure sensitive adhesive backing which shall be activated by applying pressure conforming to class II of ASTM-D-4956-01 and fixing the same to the plate of structural frame work by means of suitable sized aluminium alloys, rivets or bolts & nuts @ 300 mm centre to centre all along the periphery as well as in two vertical rows along with theft resistant measures, including the cost of painting with two or more coats of epoxy paint in grey colour on the back side of aluminium sheet including appropriate priming coat. The rate includes the cost of rounding off the corners, lowering down the structural frame work from the gantry, fixing and erecting the same in position all complete as per drawings, specification and direction of the engineer-incharge.(Structural frame work including M.S. plate to be provided separately. Rectangular area of the sheet only shall be measured for payment). Overhead informatory road signage
All in One integrated LED Solar light consists of solar photovolatic module, battery, Battery Management System, control electronics, LED driver, PIR sensor, interconnecting cables and pole mounting piece integrated into the luminaire as a single unit. Solar Lights with IP 65 ingress protection having a 2000 lumen output, 28 Wp high efficiency polycrystalline solar panel, high efficiency MPPT based charge controller and 12.8 V, 13.6Ah IP 68 Lithium Ferro Phosphate (LiFePo4) battery with proper batterymanagement system. LED Lumen efficiency shall be atleast 175 l,/W and LED driver should have >90% efficiency. Typical correlated colour temperature should be 5700 K with CRI>70. It should have a PIR sensor to ensure battery optimisation with help of suitable dimming profile. The Luminaire should be housed in IK 08 impact resistance certified aluminium pressure diecast housing with anti corrosive coating and must have a UV stabilized polycarbonate cover. The Luminaire shall have a specially designated pole mounting piece that enables lateral as well as post top mounting and installation at varying tilts from 0 to 15 degrees for optimal light distribution. (Make- Philips, Crompton, Bajaj or Equivalent)
Supplying, Installation, Testing and Commissioning of 06 Mtr. GI Tubular Pole, 2 Section with base palte & J bolt, Top dia 48-60 mm (Make- Nezone, Surya or equivalent)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_79532.xls
BOQ • 0.24 MB
FOB.pdf
Additional Documents • 0.12 MB
Bid_Document.pdf
Tender Documents • 1.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .