Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 CrAccepted-AOC 801 B WING 8THFLOOR GODREJ COLISEUM BEHIND EVERARD NAGAR SION EAST MUMBAI MAHARASHTRA 400022 | MUMBAI | MAHARASHTRA | 400022 | ₹7.9 Cr | L1 | Accepted-AOC Bidder is found L1 based on the financial bid document submitted by bidder. |
| 2 | L2₹10.7 Cr+₹2.8 Cr (35.3%)Rejected-AOC 402 4TH FLOOR MALHOTRA CHAMBERS ARVIND VITHAL GANDHI CHOWK B S D MARG OFF GOVANDI STATION ROAD GOVANDI E MUMBAI 400088 | MUMBAI SUBURBAN | MAHARASHTRA | 400088 | ₹10.7 Cr+₹2.8 Cr (35.3%) | L2 | Rejected-AOC Bidder is found L2 based on the financial bid document submitted by bidder. |
| 3 | L3₹12.1 Cr+₹4.1 Cr (52.3%)Rejected-AOC | ₹12.1 Cr+₹4.1 Cr (52.3%) | L3 | Rejected-AOC Bidder is found L3 based on the financial bid document submitted by bidder. |
| 4 | Rejected-Technical | - | - | Rejected-Technical The bidder failed to meet the experience criteria and not submitted a valid CA certified turnover certificate containing UDIN. Hence bidder is not eligible as per tender requirement. |
| Sl No | Description | Qty | Unit | Total Movements Pvt Ltd. | PROCAM LOGISTICS PRIVATE LIMITED | J M Baxi Heavy Private Limited |
|---|---|---|---|---|---|---|
| 1.00COST OF TRANSPORTATION | ||||||
| 1.01 | Metro Car Loading/ at Mandale depot, Transportation to Gaimukh Viaduct and unloading at Gaimukh viaduct structures track | 48 | Trip | 3,30,00,000 ₹3,89,40,000 | 3,81,60,000 ₹4,50,28,800 | 2,83,20,000 ₹3,34,17,600 Lowest |
| 1.02 | Metro Car Loading from Gaimukh Viaduct structure to Trailer, Transportation to Mandale depot and unloading at Mandale depot loading/unloading track | 48 | Trip | 3,30,00,000 ₹3,89,40,000 | 3,81,60,000 ₹4,50,28,800 | 2,83,20,000 ₹3,34,17,600 Lowest |
| 1.03 | Associated equipment/Machines loading at Mandale depot, transportation to Gaimukh Viaduct and unloading at Gaimukh Viaduct Structures track | 10 | Trip | 50,60,000 ₹59,70,800 | 82,00,000 ₹96,76,000 | 18,50,000 ₹21,83,000 Lowest |
| 1.04 | Associated equipment/Machines loading from Gaimukh Viaduct structures to trailer, transportation to Mandale depot and
unloading at Mandale depot loading/unloading Track | 10 | Trip | 50,60,000 ₹59,70,800 | 82,00,000 ₹96,76,000 | 18,50,000 ₹21,83,000 Lowest |
| 2.00Transit Insurance | ||||||
| 2.01 | Metro Cars | 96 | Trip | 1,05,60,000 ₹1,24,60,800 | 25,34,400 ₹29,90,592 Lowest | 38,40,000 ₹45,31,200 |
| 2.02 | Associated Equipment/Machineries | 20 | Trip | 11,00,000 ₹12,98,000 | 3,96,000 ₹4,67,280 Lowest | 4,00,000 ₹4,72,000 |
| 3.00Miscellaneous items | ||||||
| 3.01 | Despatch Survey through Nominated Insurance Surveyor | 52 | Shipment | 14,04,000 ₹16,56,720 Lowest | 18,20,000 ₹21,47,600 | 15,60,000 ₹18,40,800 |
Tender Value
₹9.8 Cr
EMD Value
₹16.6 L
Closing Date
7 Aug 2025, 5:00 pmClosed
Managing Director MMMOCL
Maha Mumbai Metro Operation Corporation Limited., NaMTTRI Building, Adjoining MMRDA New Administrative Building, Bandra Kurla Complex, Bandra E, Mumbai 400051
Transportation of metro rail cars and associated machines or equipnt, including loading or unloading with insurance coverage, from Mandale depot to elevated viaduct of line 4 and 4A between Gaimukh to Cadbury metro station and vice versa.
2025_MMRDA_1196322_1
MMMOCL-16012(12)/3/2025
Open Tender
Shipping/ Transportation/ Vehicle
Item Rate
730 days
Metro Line 4 and 4A and Mandale Depot
As per RFP
9 documents required · 9 mandatory
₹3,540
₹16.6 L
MMMOCL, BKC
21 Nov 2025
1 Jul 2025
8 Aug 2025
1 Jul 2025
7 Aug 2025
2 Jul 2025
2 Jul 2025 - 10 Jul 2025
10 Jul 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1COST OF TRANSPORTATION | ||||||
| 1.01 | Metro Car Loading/ at Mandale depot, Transportation to Gaimukh Viaduct and unloading at Gaimukh viaduct structures track | 48 | Trip | - | - | 18% |
| 1.02 | Metro Car Loading from Gaimukh Viaduct structure to Trailer, Transportation to Mandale depot and unloading at Mandale depot loading/unloading track | 48 | Trip | - | - | 18% |
| 1.03 | Associated equipment/Machines loading at Mandale depot, transportation to Gaimukh Viaduct and unloading at Gaimukh Viaduct Structures track | 10 | Trip | - | - | 18% |
| 1.04 | Associated equipment/Machines loading from Gaimukh Viaduct structures to trailer, transportation to Mandale depot and
unloading at Mandale depot loading/unloading Track | 10 | Trip | - | - | 18% |
| 2Transit Insurance | ||||||
| 2.01 | Metro Cars | 96 | Trip | - | - | 18% |
| 2.02 | Associated Equipment/Machineries | 20 | Trip | - | - | 18% |
| 3Miscellaneous items | ||||||
| 3.01 | Despatch Survey through Nominated Insurance Surveyor | 52 | Shipment | - | - | 18% |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_2072532.xls
BOQ • 0.35 MB
174507318.pdf
Tender Documents • 0.32 MB
174507322.html
Tender Documents • 0.08 MB
176976932.pdf
Tender Documents • 0.10 MB
176976933.html
Tender Documents • 0.01 MB
Pricebid.pdf
Tender Documents • 4.38 MB
RFP.pdf
Tender Documents • 3.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .