| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.9 LAccepted-AOC NOT AVAILABLE | ₹63.9 L Quoted ₹62.8 L | L1 | Accepted-AOC Award to L1 |
| 2 | L2₹65.2 L+₹2.4 L (3.74%)Rejected-Finance BELOW SLAUGHTER HOUSE KRISHNA NAGER SHIMLA | SHIMLA | SHIMLA | HIMACHAL PRADESH | ₹65.2 L+₹2.4 L (3.74%) | L2 | Rejected-Finance Found L2 |
| 3 | L3₹67.2 L+₹4.4 L (6.97%)Rejected-Finance HIMACHAL PRADESH | ₹67.2 L+₹4.4 L (6.97%) | L3 | Rejected-Finance Found L3 |
| Sl No | Description | Qty | Unit | Ravinder Kumar L3 | ANKUSH KUMAR L1 | SUNIL KUMAR L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation, trenches or drains, pits upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, chieselling soft / hard rock including getting out the excavated soil, dressing of sides, ramming of bottoms and returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and then disposing of surplus excavated soil as directed, within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge. | 66.09 | Cum | 230 ₹15,200.7 | 220 ₹14,539.8 | 215 ₹14,209.35 Lowest |
| 2.00 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 mtr, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposite layers by ramming, watering, etc and disposing of surplus excavated soil as directed within the lead of 50 mtr, complete in all respect and to the entire satisfaction of engineer-in-charge. | 2,992 | Rmt | 250 ₹7,48,000 | 180 ₹5,38,560 Lowest | 195 ₹5,83,440 |
| 3.00Centering and shuttering including strutting, propping etc. and removal of form work for : | ||||||
| 3.01 | Foundation, footings bases of columns etc. for mass concrete complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. | 47.31 | Sqm | 250 ₹11,827.5 Lowest | 250 ₹11,827.5 Lowest | 300 ₹14,193 |
| 3.02 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. | 181.24 | Sqm | 400 ₹72,496 Lowest | 400 ₹72,496 Lowest | 450 ₹81,558 |
| 3.03 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge. | 122.9 | Sqm | 400 ₹49,160 Lowest | 400 ₹49,160 Lowest | 450 ₹55,305 |
| 3.04 | Lintels, beams, plinth beams, girders, bressumers and cantilevers complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. | 2.03 | Sqm | 400 ₹812 Lowest | 400 ₹812 Lowest | 450 ₹913.5 |
| 3.05 | Suspended floors, roofs, landings, balconies and access platforms, complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. | 10.46 | Sqm | 500 ₹5,230 | 500 ₹5,230 | 450 ₹4,707 Lowest |
| 3.06 | Edges of slab and break in floor and walls complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. | 18.04 | Rmt | 230 ₹4,149.2 | 230 ₹4,149.2 | 190 ₹3,427.6 Lowest |
| 4.00 | Providing and laying in position cement concrete 1:5:10 (1 Cement: 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) and curing complete excluding the cost of centering and shuttering complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge. | 12.78 | Cum | 5,200 ₹66,456 Lowest | 5,200 ₹66,456 Lowest | 5,200 ₹66,456 Lowest |
Tender Value
₹50.0 L
EMD Value
₹82,521
Closing Date
20 Feb 2026, 11:00 amClosed
District Project Manager HPCDP JICA ODA
District Project Manager O/o DPMU HPCDP JICA ODA Phase-II, Opposite to Soil Testing Lab, Holta at Palampur
C/o Tube Well at Kharota, G.P- Kharota, Tehsil- Jawali, District-Kangra (H.P).
2026_HPCDP_128154_1
No.AGR. DPMU. KGR. F (7) Tender/13/2022 4758
Open Tender
Civil Works
Item Rate
365 days
G.P- Kharota, Tehsil- Jawali, District-Kangra (H.
Please refer Tender documents.
16 documents required · 16 mandatory
₹1,500
₹82,521
District Project Manager HPCDP JICA ODA
1 Jul 2026
10 Feb 2026
20 Feb 2026
10 Feb 2026
20 Feb 2026
10 Feb 2026
13 Feb 2026
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .