| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Fee/PreQual/Technical/Finance | ₹1.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Tijo Abraham Varghese L1 |
|---|---|---|---|---|
| 1.00Toilet Construction | ||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 3.07 | cum | 256.34 ₹787.48 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.71 | cum | 7,893.22 ₹5,635.76 Lowest |
| 1.00 | OD463039/2025-2026:(OD from AAR 60.7.1)DRY RUBBLE MASONRY -Dry rubble with out concrete levelling course masonry with good quality blasted rubble including packing to compactions to line and levels etc complete. | 2.3 | cum | 3,973.49 ₹9,154.92 Lowest |
| 1.00 | OD463038/2025-2026:(R R Work)Random Rubble Masonry with good quality hard stone (Excluding Bond Stone) in foundation and plinth including levelling up with cement morter 1:6 (1 part cement,6 part course sand) etc complete. | 1.15 | cum | 5,686.7 ₹6,551.08 Lowest |
| 1.00 | OD482641/2025-2026:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge. | 0.73 | cum | 443.48 ₹325.96 Lowest |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.24 | cum | 10,463.32 ₹2,511.2 Lowest |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 3.23 | sqm | 759.06 ₹2,451.76 Lowest |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 0.69 | cum | 13,374.92 ₹9,188.57 Lowest |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 5.89 | sqm | 956.43 ₹5,632.42 Lowest |
Tender Value
₹1.3 L
EMD Value
₹3,171
Closing Date
3 Aug 2026, 6:00 pmClosed
Assistant Engineer
Assistant Engineer LIDEW Section Puthuppally
Building construction
2026_LSGD_862271_12
02/AE/LIDEW/PLY/2026-27
Open Tender
Civil Works - Others
Item Rate
240 days
Puthuppally
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹3,171
Yes
6 Aug 2026
27 Jul 2026
5 Aug 2026
27 Jul 2026
3 Aug 2026
27 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Toilet Construction | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.002 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.003 | OD463039/2025-2026:(OD from AAR 60.7.1)DRY RUBBLE MASONRY -Dry rubble with out concrete levelling course masonry with good quality blasted rubble including packing to compactions to line and levels etc complete. | 1 | cum | - | - |
| 1.004 | OD463038/2025-2026:(R R Work)Random Rubble Masonry with good quality hard stone (Excluding Bond Stone) in foundation and plinth including levelling up with cement morter 1:6 (1 part cement,6 part course sand) etc complete. | 1 | cum | - | - |
| 1.005 | OD482641/2025-2026:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge. | 1 | cum | - | - |
| 1.006 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.007 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | - | sqm | - | - |
| 1.008 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | - | - |
| 1.009 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | - | sqm | - | - |
stage.html
html • 0.02 MB
finance_1459017.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.33 MB
237SBD.pdf
Tender Documents • 0.97 MB
237PA.pdf
Additional Documents • 0.25 MB
237Affidavit.pdf
Other Document • 0.23 MB
237bidsubmission.pdf
Other Document • 0.33 MB
IPACT.pdf
Other Document • 0.23 MB
EPay.pdf
Other Document • 0.23 MB
237FOT.pdf
Tender Documents • 0.25 MB
BOQ_1459017.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .