| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1417.2 CrAccepted-AOC | ₹1417.2 Cr Quoted ₹1201.0 Cr | L1 | Accepted-AOC Work awarded to L1 inclusive of GST 18 percentage |
| 2 | L2₹1318.6 Cr+₹117.6 Cr (9.79%)Rejected-Finance | ₹1318.6 Cr+₹117.6 Cr (9.79%) | L2 | Rejected-Finance As per TC recommendation |
| 3 | L3₹1482.9 Cr+₹281.9 Cr (23.5%)Rejected-Finance | ₹1482.9 Cr+₹281.9 Cr (23.5%) | L3 | Rejected-Finance As per TC recommendation |
| 4 | L4₹1559.7 Cr+₹358.7 Cr (29.9%)Rejected-Finance | ₹1559.7 Cr+₹358.7 Cr (29.9%) | L4 | Rejected-Finance As per TC recommendation |
| 5 | L5₹1621.2 Cr+₹420.2 Cr (35.0%)Rejected-Finance 18A PARK STREET 6 0 1 STEPHEN COURT LIFT NO 1 KOLKATA WB 700071 | KOLKATA | KOLKATA | WB | 700071 | ₹1621.2 Cr+₹420.2 Cr (35.0%) | L5 | Rejected-Finance As per TC recommendation |
Tender Value
₹1606.3 Cr
Closing Date
2 Aug 2021, 5:00 pmClosed
GENERAL MANAGER CMC
OFFICE OF GENERAL MANAGER CMCECL HQ SANCTORIA PO DISHERGARH DIST PASCHIM BARDHAMAN WB PIN 713333
Hiring of HEMM for Removal and Transportation of 831.90 L.Cum of OB Extraction and Transportation of 213.50 L Te of Coal and Re handling of 451.00 L.Cum OB at Mohanpur Expansion OC patch Phase II under Salanpur Area
2021_ECL_208104_1
ECL/HQ/CMC/Mohanpur Expn OCP/261 dt 31.05.21
Open Tender
Miscellaneous Services
Percentage
5110 days
Mohanpur OC Patch, Salanpur Area
As Per Tender Documents.
12 documents required · 12 mandatory
Exempted
6 Dec 2021
8 Jun 2021
4 Aug 2021
8 Jun 2021
2 Aug 2021
8 Jun 2021
8 Jun 2021 - 26 Jul 2021
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description/ Heading | |||||
| 1.01 | Excavation in OB in all kinds of soil including mixed soil, mixed hard soil i.e. clay/ soil mixed with pebble., moorum, hard moorum, soil mixed with laterite /stone boulders etc. and rock, soft or hard at any depth by mechanical means including drilling, using suitable blast hole drilling machine, Charging and blasting ( blasting shall be done by Deptt. free of cost. Supply of explosives, detonators & related materials will be made available by ECL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the management free of cost ) as required at any depth and loading by mechanical means including pumping out water & discharging the same to the nearest Drainage system & removal of slushy earth and slurry as required, transporting and unloading mechanically and disposed off either by (a) dumping outside the working zone in proper manner on the land arranged by the colliery or (b) directly back filling of the excavated area in proper layer or (c) filling of subsided area / voids in the adjoining area outside the working zone in operation or as perdirection of colliery official in proper gradient including dozing, the job involves making access trench / haul road as required for excavation operation and for transportation of excavated materials etc. all complete as per direction of Project Officer/ Agent. (Payment shall be made for finished work on the basis of pre-work and post-work level section measurement of excavation. All measurements of O.B. removed will have to be certified by Colliery Surveyor , Manager and Project Officer / Agent. Joint check measurement on quarterly / half yearly basis shall be done as per bid document). Carriage lead 2-3 KM. | 0.77 | Cum | 99.48 | ₹76.5 |
| 1.02 | Excavation in OB in all kinds of soil including mixed soil, mixed hard soil i.e. clay/ soil mixed with pebble., moorum, hard moorum, soil mixed with laterite /stone boulders etc. and rock, soft or hard at any depth by mechanical means including drilling, using suitable blast hole drilling machine, Charging and blasting ( blasting shall be done by Deptt. free of cost. Supply of explosives, detonators & related materials will be made available by ECL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the management free of cost ) as required at any depth and loading by mechanical means including pumping out water & discharging the same to the nearest Drainage system & removal of slushy earth and slurry as required, transporting and unloading mechanically and disposed off either by (a) dumping outside the working zone in proper manner on the land arranged by the colliery or (b) directly back filling of the excavated area in proper layer or (c) filling of subsided area / voids in the adjoining area outside the working zone in operation or as perdirection of colliery official in proper gradient including dozing, the job involves making access trench / haul road as required for excavation operation and for transportation of excavated materials etc. all complete as per direction of Project Officer/ Agent. (Payment shall be made for finished work on the basis of pre-work and post-work level section measurement of excavation. All measurements of O.B. removed will have to be certified by Colliery Surveyor , Manager and Project Officer / Agent. Joint check measurement on quarterly / half yearly basis shall be done as per bid document). Carriage lead 3-4 KM. | 0.21 | Cum | 111.18 | ₹23.79 |
| 1.03 | Re-handling from the existing dumped overburden obtained by Excavation of the mine (all kinds of Soil & Rock) operation, transporting mechanically to site of filling including loading, unloading & spreading the same in proper manner as required all by mechanical means, top surface neatly dressed including making road as required for this job for transportation etc. complete in all respect as per direction of Project Officer / Agent. (Payment shall be made for lower of the assessed quantity on the basis of pre-work and post-work level section measurement of filling zone/cutting zone. Measurement is to be certified by Colliery Surveyor, Manager, Project Officer / Agent. Joint check measurement on quarterly / half yearly basis shall be done as per bid document). Carriage lead 0-1 KM. | 0.49 | Cum | 48.27 | ₹23.41 |
| 1.04 | Re-handling from the existing dumped overburden obtained by Excavation of the mine (all kinds of Soil & Rock) operation, transporting mechanically to site of filling including loading, unloading & spreading the same in proper manner as required all by mechanical means, top surface neatly dressed including making road as required for this job for transportation etc. complete in all respect as per direction of Project Officer / Agent. (Payment shall be made for lower of the assessed quantity on the basis of pre-work and post-work level section measurement of filling zone/cutting zone. Measurement is to be certified by Colliery Surveyor, Manager, Project Officer / Agent. Joint check measurement on quarterly / half yearly basis shall be done as per bid document). Carriage lead 1-2 KM. | 0.8 | Cum | 58.89 | ₹47.05 |
| 1.05 | (a)Wining / extraction of running of mines coal in benches from available coal seam at any depth including using suitable blast hole drilling machine, charging and blasting ( blasting shall be done by Deptt. free of cost. Supply of explosives, detonators & related materials will be made available by ECL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the management free of cost ) (b) loading of coal free from extraneous materials into dumpers / tippers mechanically at coal face , including pumping out water & discharging the same to the nearest drainage system, removal of slushy earth / slurry and removal / segregating / picking of unwanted band stone / extraneous materials and (c) Transporting the same to Rly.Siding, unloading and stacking in regular stacks. The job also involves making and maintenance of access trench / haul roads required for extraction and transportation of coal including water spraying stock yard management by dozer etc. The entire operation of extraction & transportation of coal is to be carried out as per direction of Project Officer / Agent. (Colliery authority will establish a permanent benchmark at the quarry site and surface contouring at suitable intervals in consultation with Area authority, Hq. Survey Deptt.. All measurement are to be carried out in relation to the benchmark.) (Payment is to be made on the basis of the measurement of in-situ volume solid converted to weight by conversion factor specific to the seam coal subject to quarterly reconciliation of coal received by weight at despatch point as specified. Measurement is to be certified by Colliery Surveyor, Manager, Project Officer / Agent . Joint check measurement on quarterly / half yearly basis shall be done as per bid document. (a)Carriage lead exceeding 02 km but not exceeding 03 kms.** | 42,70,000 | Te | 74.96 | ₹32,00,79,200 |
| 1.06 | (a)Wining / extraction of running of mines coal in benches from available coal seam at any depth including using suitable blast hole drilling machine, charging and blasting ( blasting shall be done by Deptt. free of cost. Supply of explosives, detonators & related materials will be made available by ECL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the management free of cost ) (b) loading of coal free from extraneous materials into dumpers / tippers mechanically at coal face , including pumping out water & discharging the same to the nearest drainage system, removal of slushy earth / slurry and removal / segregating / picking of unwanted band stone / extraneous materials and (c) Transporting the same to Rly.Siding, unloading and stacking in regular stacks. The job also involves making and maintenance of access trench / haul roads required for extraction and transportation of coal including water spraying stock yard management by dozer etc. The entire operation of extraction & transportation of coal is to be carried out as per direction of Project Officer / Agent. (Colliery authority will establish a permanent benchmark at the quarry site and surface contouring at suitable intervals in consultation with Area authority, Hq. Survey Deptt.. All measurement are to be carried out in relation to the benchmark.) (Payment is to be made on the basis of the measurement of in-situ volume solid converted to weight by conversion factor specific to the seam coal subject to quarterly reconciliation of coal received by weight at despatch point as specified. Measurement is to be certified by Colliery Surveyor, Manager, Project Officer / Agent . Joint check measurement on quarterly / half yearly basis shall be done as per bid document. (a)Carriage lead exceeding 05 km but not exceeding 06kms.** | 86,80,000 | Te | 95.15 | ₹82,59,02,000 |
| 1.07 | (a)Wining / extraction of running of mines coal in benches from available coal seam at any depth including using suitable blast hole drilling machine, charging and blasting ( blasting shall be done by Deptt. free of cost. Supply of explosives, detonators & related materials will be made available by ECL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the management free of cost ) (b) loading of coal free from extraneous materials into dumpers / tippers mechanically at coal face , including pumping out water & discharging the same to the nearest drainage system, removal of slushy earth / slurry and removal / segregating / picking of unwanted band stone / extraneous materials and (c) Transporting the same to Rly.Siding, unloading and stacking in regular stacks. The job also involves making and maintenance of access trench / haul roads required for extraction and transportation of coal including water spraying stock yard management by dozer etc. The entire operation of extraction & transportation of coal is to be carried out as per direction of Project Officer / Agent. (Colliery authority will establish a permanent benchmark at the quarry site and surface contouring at suitable intervals in consultation with Area authority, Hq. Survey Deptt.. All measurement are to be carried out in relation to the benchmark.) (Payment is to be made on the basis of the measurement of in-situ volume solid converted to weight by conversion factor specific to the seam coal subject to quarterly reconciliation of coal received by weight at despatch point as specified. Measurement is to be certified by Colliery Surveyor, Manager, Project Officer / Agent . Joint check measurement on quarterly / half yearly basis shall be done as per bid document. (a)Carriage lead exceeding 06 km but not exceeding 07 kms.** | 36,75,000 | Te | 101.14 | ₹37,16,89,500 |
| 1.08 | (a)Wining / extraction of running of mines coal in benches from available coal seam at any depth including using suitable blast hole drilling machine, charging and blasting ( blasting shall be done by Deptt. free of cost. Supply of explosives, detonators & related materials will be made available by ECL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the management free of cost ) (b) loading of coal free from extraneous materials into dumpers / tippers mechanically at coal face , including pumping out water & discharging the same to the nearest drainage system, removal of slushy earth / slurry and removal / segregating / picking of unwanted band stone / extraneous materials and (c) Transporting the same to Rly.Siding, unloading and stacking in regular stacks. The job also involves making and maintenance of access trench / haul roads required for extraction and transportation of coal including water spraying stock yard management by dozer etc. The entire operation of extraction & transportation of coal is to be carried out as per direction of Project Officer / Agent. (Colliery authority will establish a permanent benchmark at the quarry site and surface contouring at suitable intervals in consultation with Area authority, Hq. Survey Deptt.. All measurement are to be carried out in relation to the benchmark.) (Payment is to be made on the basis of the measurement of in-situ volume solid converted to weight by conversion factor specific to the seam coal subject to quarterly reconciliation of coal received by weight at despatch point as specified. Measurement is to be certified by Colliery Surveyor, Manager, Project Officer / Agent . Joint check measurement on quarterly / half yearly basis shall be done as per bid document. (a)Carriage lead exceeding 08 km but not exceeding 09 kms.** | 26,25,000 | Te | 115.24 | ₹30,25,05,000 |
| 1.09 | (a)Wining / extraction of running of mines coal in benches from available coal seam at any depth including using suitable blast hole drilling machine, charging and blasting ( blasting shall be done by Deptt. free of cost. Supply of explosives, detonators & related materials will be made available by ECL and the services of statutory supervisory personnel as required for the work will be provided as and when considered necessary by the management free of cost ) (b) loading of coal free from extraneous materials into dumpers / tippers mechanically at coal face , including pumping out water & discharging the same to the nearest drainage system, removal of slushy earth / slurry and removal / segregating / picking of unwanted band stone / extraneous materials and (c) Transporting the same to Rly.Siding, unloading and stacking in regular stacks. The job also involves making and maintenance of access trench / haul roads required for extraction and transportation of coal including water spraying stock yard management by dozer etc. The entire operation of extraction & transportation of coal is to be carried out as per direction of Project Officer / Agent. (Colliery authority will establish a permanent benchmark at the quarry site and surface contouring at suitable intervals in consultation with Area authority, Hq. Survey Deptt.. All measurement are to be carried out in relation to the benchmark.) (Payment is to be made on the basis of the measurement of in-situ volume solid converted to weight by conversion factor specific to the seam coal subject to quarterly reconciliation of coal received by weight at despatch point as specified. Measurement is to be certified by Colliery Surveyor, Manager, Project Officer / Agent . Joint check measurement on quarterly / half yearly basis shall be done as per bid document. (a)Carriage lead exceeding 10 km but not exceeding 11 kms.** | 21,00,000 | Te | 129.47 | ₹27,18,87,000 |
tech_bid_open
tech_eval
fin_bid_open
boq_comp_chart
xlsx
fin_eval
aoc
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_214338.xls
BOQ Document • 0.26 MB
78359742.pdf
Tender Document • 0.21 MB
78359746.html
Tender Document • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .