Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹9.3 CrAccepted-AOC | ₹9.3 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹10.1 Cr+₹76.0 L (8.14%)Rejected-AOC | ₹10.1 Cr+₹76.0 L (8.14%) | L-2 | Rejected-AOC L-2 |
| 3 | L-3₹10.4 Cr+₹1.1 Cr (11.4%)Rejected-AOC | ₹10.4 Cr+₹1.1 Cr (11.4%) | L-3 | Rejected-AOC L-3 |
| 4 | L-4₹10.4 Cr+₹1.1 Cr (11.7%)Rejected-AOC | ₹10.4 Cr+₹1.1 Cr (11.7%) | L-4 | Rejected-AOC L-4 |
| 5 | L-5₹10.8 Cr+₹1.5 Cr (15.8%)Rejected-AOC 12 13 580 STREET NO 14 NAGARJUNA NAGAR TARNAKA TARNAKA SECUNDERABAD HYDERABAD TELANGANA 500017 | HYDERABAD | TELANGANA | 500017 | ₹10.8 Cr+₹1.5 Cr (15.8%) | L-5 | Rejected-AOC L-5 |
Tender Value
Refer Docs
Closing Date
27 Oct 2021, 3:00 pmClosed
Shri C.S. LALL
DGM (ELECT.) CONTRACTS, CPP, NALCO, ANGUL
MAINTENANCE OF NALCOS ROLLING STOCKS AT SMELTER AND POWER COMPLEX, ANGUL
2021_NALCO_649260_1
MC-5041
Open Tender
Miscellaneous Services
Item Rate
730 days
CPP, NALCO, ANGUL
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
NATIONAL ALUMINIUM COMPANY LIMITED
Exempted
21 Mar 2022
21 Sept 2021
1 Nov 2021
21 Sept 2021
27 Oct 2021
21 Sept 2021
Amount
Miaint.of WDS6 locomotive W/s equipment: Maintenance of WDS6 Locomotive and workshop Equipments including plant & machineries as per scope of work(Excluding that are covered in the following items) for 7 nos of WDS6 Locomotives. Noe:- LPE= Lump Sum per equipment per month
Maint. of WDG3A Locomotive as per SOW: Maintenance of WDG3A Locomotives as per scope of work for 04 numbers of WDG3A Locomotives Note:- UOM-LPE- Lump sum per month per equipment (i.eWDG3A Locomotive)
Miantenance of Surface Wheel lathe: Maintenance of CNC SurfaceWheel Turning Lathe Note:-UOM- LPE= Lump sum per month per equipment.
O&M of Godrej make 3Ton Forklift: Operation and Maintenance of Godrej Make Forklift. UOM Note:- LPE= Lump sum per month per equipment.
Miantenance of Overhead Crane-2 nos.: Maintenance of Overhead Cranes as per Scope of work for 2 numbers of crane. UOM Note:- LPE= Lump Sum per month per equipment.
Maintenance of Air Compressor-3 nos: Maintenance of Air Compressor as per scope of work-for 3 numbers of air compressor. UOM Note:- LPE= Lump sum per month per equipment (i.e compressor)
Maintenance of FIP test stand-1 no: Maintenance of FIP (Fuel Injection Pump) test stand. UOM Note: LPE= Lump sum per month per equipment.
POH of BTAP wagons: POH (Periodic Overhauling)of BTAP wagon
ROH of BTAP wagons: ROH ( Routine Overhauling ) of BTAP Wagon
Intensive Examination of BTAP Wagons: Intensive Examination (I.E) of BTAP Wagons as per scope of work.
Miantenance of Coal Wagon(Excluding POH): Maintenance of Coal Wagons (Excluding POH) as per scope of work.- 65 numbers UOM Note: LPE Lump sum per month per equipment (i.e Coal Wagon)
Daily Train Examination of Coal Wagon: Daily Train Examination of coal wagon in the coal rakes as per scope of work.
POH of Coal Wagon: POH (Periodic Overhauling of) of Coal wagon as per scope of work.
Painting of Coal Wagon: Painting of Coal wagon as per scope of work.
M/s. D.M. Enterprises
UNITED TECHNICAL AND ECONOMIC SERVICES P LTD
LIFT AND SHIFT
United Rail Road Consultants Private Limited
RITES LIMITED
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .