| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.1 LAccepted-AOC V P O MANPURA TEHSIL BADDI DISTT SOLAN H P | SOLAN | HIMACHAL PRADESH | 171102 | L1 | Accepted-AOC Awarded Rates | |
| 2 | L2₹43.8 L+₹2.7 L (6.60%)Rejected-Finance MAIN BAZAR GHUMARWIN DISTT BILASPUR HP 174021 | BILASPUR | HIMACHAL PRADESH | 174021 | L2 | Rejected-Finance High rates | |
| 3 | L3₹49.6 L+₹8.5 L (20.7%)Rejected-Finance 1286 3 SHASHRI NAGAR MEERUT | MEERUT | L3 | Rejected-Finance High Rates | |
| 4 | Not Admitted-Fee CHOBATA STREET MANDI DISTT MANDI HP | MANDI | HIMACHAL PRADESH | 175001 | - | Not Admitted-Fee Fee not received |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
15 Mar 2021, 11:00 amClosed
SE OP Bilaspur
SE OP Bilaspur
Tender for the Work Survey, Design, Manufacturing, Supply of Material, Erection, Testing and Commissioning of 11.4 KV 250 KVA Sub Station, 11 KV H.T. Line, L.T. line, AB and PVC Cable of different Sizes including Dismantlement of Existing Electrical
2021_HPSEB_44981_1
NIT-28/2020-21
Open Tender
Electrical Works
Item Rate
120 days
Ghumarwin
As per bid
13 documents required · 13 mandatory
₹2,950
Sr. Executive Engineer,(E) Division HPSEBLBilaspur
₹1.2 L
23 Apr 2021
3 Mar 2021
17 Mar 2021
3 Mar 2021
15 Mar 2021
5 Mar 2021
Amount
ELECTRICAL PART
11/.4 KV 250 KVA Transformer
Prov. 11/0.4 kV 250 KVA Distribution Transformer
Prov. Energy Meter (3-Phase, 4-Wire) , LT, CT's opertaed Static Trivector Meters (DLMS compliant) of accuracy class 0.5s with CT of 400/5 A capacity, with mettalic box and wiring (ISI marked).
Prov. S/T Pole 9.00 Mtr. Long
Prov. RCC Muff with C:C filling 2000 mm length
Prov. M.S.C.I. X-Arm (100x50x6 mm),Length 2800 mm X2 Nos.
Prov. C.I. X-Arm (75X40x6 mm) length 2800 mm X 4 Nos. for supporting D O Fuse Unit & G O AB Switch
Prov. M.S. A.I X Arm (50x50x6mm) Length 2800 mm x1 for L A's
Transformer Bed
Prov. G.O. Switch Unit
Prov. D.O.Fuse Unit
Prov. Surge Arrester, 9 kV Station Class (Porcilain Type) L.A.
Prov. 11 kV Disc Insulator set (Comprising 1 No. Disc. (Porcilain, BS, 12kV,90kN) i/c Dead End Clamps etc.)
Prov. Stay Set complete
Prov. Stay Wire 7/3.15 mm ( @ 6.0 kg Per Stay Set)
Prov. Pipe Earthing
Prov. LT Distribution Panel Box with MCCB (400A, 36kA, 4P, 1No.) and SFU (100A, 4 No., rewirable)
Prov. Half Clamp (M.S. Flat 50X6 mm)
Prov. M.S. Nuts and Bolts of various sizes (galvanised/ Coated) (Preferably 16 mm ɸ or more (With Flat & Spring Washers))
Prov. Aluminium. Thimble
Prov. Aluminium. Thimble
Prov. Danger Plate
Prov. Barbed wire
Prov. LT Cable (3.5 Core) 240 mm2
Prov. Aluminium Paint.
Prov. Chain Link Fencing, Angle Iron, Gate etc. for transformer Fencing.
11 KV H.T Line on ST Pole
Prov. Steel Tubular Pole 10.00 mtr Working Load >227KG
Prov. Steel Tubular Pole 11.00 mtr Working Load >227KG
Prov. RCC Muff with Concrete Filling 2000mm length.
Prov. AAAC 7/3.81 mm ( 80 mm2)
Prov. G.I.No. 6/ 8 SWG for Earth wire for PCC & S/T Pole
Prov. 11 KV Pin Insulator with Pin Hellically formed fitting (Porcelain, 12kV, 10kN)
Prov. 11 KV Disc Insulator Set Cleaves & Toungue Hellically formed fitting (Porcelain,BS,12kV,90kN)
Prov. C.I.X-arm (100x50x6mm), Length(1500) for S. Pole Str.= 1500 x2= 3000 mm= 3.00 Mtr
Prov. C.I. X-arm(100x50x6mm),Length: 2800x14= 39200 mm= 39.20 Mtr for D.Pole Str.
Prov. C.I. X-arm(100x50x6mm),Length: 3000x2= 6000 mm= 6.00 Mtr for D.Pole Str.
Prov. A.I.X-arm(65x65x6mm), Length:1800x2=3600 mm = 3.60Mtrs.for Gaurding
Prov. A.I.X-arm(65x65x6mm), Length : 3000x3= 9000mm =9.00 Mtrs.for Gaurding
Prov. A.I Knee Bracing set (50x50x6mm), Length (2x750) for Single Pole = 750x2 x4= 6000 mm = 6.00 Mtr.
Prov. Belt Set (X-Bracing Set)M S A. Iron (65x65x6mm) Length:1500x2x1=3000 mm =3.00 Mtrs.
Prov. Belt Set (X-Bracing Set)M S A. Iron(50x50x6mm) Length: 2700x2x1=5400 mm = 5.40 Mtrs.
Prov. Stay Set Complete in all respect i/c Guy Assembly with Helically Fitting
Prov. Stay Wire 7/3.15 mm/ 7.400 mm ( @ 6.0 KG /9.00 Kg per Stay Set)
Prov. H.T. Earthing for PCC /S/T Pole
Prov. Full Clamp with nuts & bolts M.S. Flat 50x6 mm
Prov. Half Clamp with nuts & bolts M.S. Flat 50x6 mm
Prov. Pole Top Clamp with nusts & bolts M.S .Flat-do-
Prov. Earth Hook for Earth Wire
Prov. Danger Plate (250x200x1.6 mm)
Prov. Nuts & Bolts Of various sizes ( Gaivanised/ Coated) ( Preferably 16 mmɸ or more with flat and spring washers)
Prov. Barbed Wire
Prov. Alluminium Paint
Prov. 11 KV G.O. AB Switch Unit (11 KV, 400A, 25 KA
L.T. Line On S.T. Pole (Dadhol to Gatwad + Gatwad to Ladrour)
Prov. Steel Tubular Pole 9.00 mtr long
Prov. Steel Tubular Pole 10.00 mtr
Prov. R.C.C. Muff with C. C. 1:2:4 for filling
Prov. AAAC Cond. 7/4.26mm (100mm2)
Prov. AAAC Cond. 7/3.15 mm (50mm2)
Prov. G.I. wire No. 8 SWG
Prov. Shackle Insulator
Prov. D-Iron
Prov. L.T Stay Set
Prov. Stay Wire 7/3.15 mm (@6.0 kg per stay set)
Prov. L.T.Stay clamp
Prov. Eye Hook Bolt
Prov. L.T. Earthing
Prov. M.S. Nuts & Bolts off size@27kg for 3 Ph.
Prov. Alluminium Paint
Prov. PVC Spacer for 3 Ph.
Prov. PVC LT Cable3.5 core120mm2
Prov. PVC T/C 10 mm2
Prov. AB Cable70 mm2
DISMANTLEMENT PART
Dismantlement of Exist. 11/0.4 KV 250 KVA S/Stn. Bharari-Ist
11/0.4 kV 250 KVA Distribution Transformer
Energy Meter (3-Phase, 4-Wire) , LT, CT's opertaed Static Trivector Meters (DLMS compliant) of accuracy class 0.5s with CT of 400/5 A capacity, with mettalic box and wiring (ISI marked).
C.I. X-Arm (75X40x6 mm) length 2800 mm X 4 Nos. for supporting D O Fuse Unit & G O AB Switch
G.O. Switch Unit
D.O.Fuse Unit
LT Cable (3.5 Core) 185mm2
Barbed Wire, Angle Iron for transformer Fencing.
LT Distribution Box suitable for 11/0.4 KV 250 KVA Transformer
Dismentlement of Exist. 11 KV H.T line (Gatwar to Ladrour)
PCC pole 9 mtr. Long
ST pole 9 mtr. Long
AAAC cond 7/3.15 mm (50 mm2)
11 KV Pin Insulator with G.I Pin
M.S.C.I X-arm (1500x100x50x6)
M.S.C.I X-arm (3000x100x50x6)
M.S.C.I X-arm (2800x100x50x6)
Transportation of dismantled materials from site of work to Divisional Store i/c loading, Unloading & Stacking properly in Divisional Store.
Dismentlement of Exist. L.T line (Dadhol to Gatwar)
PCC Pole 8.00 mtr. Long
ST Pole 8.00 mtr. Long
AAAC 7/2.50 mm / AAC7/2.21 mm (30 mm2)
AAAC 7/4.26 mm (100 mm2)
GI Wire No. 8 SWG
Shackle insulator with D-Iron
D-iron assembly for Shackle insulator fitting
PVC 3.5C 50 mm2
Earth Hook LT
LT stay set
Transportation of dismantled materials from site of work to Divisional Store i/c loading, Unloading & Stacking properly in Divisional Store.
Ratwan Light House
ARUN ELECTRICALS INDIA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .