Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-Finance NOT AVAILABLE | L1 | Accepted-Finance lowest | |
| 2 | L2₹1.1 L+₹5,300 (4.88%)Accepted-Finance BYPASS NH NEAR SBI SIDHRA JAMMU | L2 | Accepted-Finance Higher than L1 | |
| 3 | L3₹1.2 L+₹8,300 (7.65%)Accepted-Finance BHAGWATI NAGAR JAMMU | L3 | Accepted-Finance Higher than L1 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.2 L
EMD Value
₹2,350
Closing Date
7 Feb 2022, 4:00 pmClosed
Executive Engineer MICD Jammu
Office of Executive Engineer MICD Jammu
repairing/ maintenance of Electro-mechanical components along with other allied works of Irrigation Stations Bindala mang and Dheri dhara
2022_IFC_158375_1
eNIT NO MICD/J/81 OF 2021-22 Dated 27/01/2022
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
15 days
Rajouri
Please refer Tender documents.
8 documents required · 8 mandatory
₹200
Executive Engineer MICD Jammu
₹2,350
Yes
23 Feb 2022
28 Jan 2022
9 Feb 2022
28 Jan 2022
7 Feb 2022
29 Jan 2022
Amount
(a) Repairs of motor of 20HP of unit -II. At LIS Bindala mang by way of opening of side covers then extraction of rotor& stator. Extraction of burnt winding from the stator, cleaning of stator . P/f of new winding wire of superior quality and varnish it with superior quality of varnish . Drying the stator winding with hot air process. Assembling of the motor, refitting back to its position, making electrical connections, alignment with pump, testing the motor on no load and full load . job further includes Servicing of horizontal casing pump by way of , P/F of new gland packing 10mm dia with nut bolts, rubber sheet cleaning the gland bushes and gland plate ,applying sufficient amount of grease to bearings to avoid excessive wear and tear and its refitting back to its position at site. Job includes hire charges of tools & tackles, to and fro, labour charges for skilled/semiskilled labour, cost of material used for execution of job at site LIS and testing of Pumping unit at full load. . Complete Job (b) Servicing to 25KVA voltage stabilizer installed at LIS Bindala mang. The job involves opening of top cover of the voltage stabilizer by unscrewing nuts/ bolts and then lifting of top cover with the help of chain pulley block and manual labour , checking of internal assembly of the voltage stabilizer including level of oil in it . Then topping up with necessary required T.oil about 70 ltrs then fitting the top cover back to its position by way of P/fitting of new gasket , nuts/bolts , one new MCCB in place of damaged one , using chain pulley block about manual labour. Complete job includes cost on account of material, skilled and semi-skilled labour required for the job at LIS Bindala Mang. Complete Job (c) Repairs to 20 HP oil immersed starter of pumping unit no II at LIS Bindala Mang by way of extracting the damaged copper contact points both moving and fixed, thimbles, no volt coil, tripping system and replacing the same with new ones . Providing/filling of 10 litres transformer oil for topping of starter. The job includes cost of material, labour charges, installation and testing charges at site. Complete Job (d) Repairs to LT control panel by way of disconnecting the incoming and outgoing cables of panel at LIS Bindala mang by way of cleaning washing LT panel with recommended chemicals. P/f of New 100Amp main incomer MCCB by way of replacing the damaged MCCB and cleaning the terminals with suitable chemicals to make it carbon free. The complete job includes cost of material and labour charges. Complete Job (e) Repair to 250mm dia. M.S rising main at LIS Dheri Dhara. The job involves excavation of surrounding area for smooth working condition around damaged portion of rising main. Digging of three no.s pits around the rising main to make proper working space by engaging manual labour and other tools and tackles required for the job. Repairs to leaked joints spotted on the Rising main by way of cutting of existing joints and making of new leak free joints after cutting of paths inside the pipe circumferential welding area of the pipe for making a leaking free three no.joints . Refilling of the pits. Complete job includes cost of materials, hire charges of welding set and labour charges, head load, manual handling, transportation charges etc at the site. Complete Job The Rebate on old damaged parts/scrap should be quoted in the rebate column provided in BOQ
G S ENGINEERING WORKS
M/S FASTTRACK ENGINEERS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .