| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | L1 | Accepted-AOC Commitee approved rates as L1 | |
| 2 | L2₹2.8 L+₹44 (0.02%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹2.8 L+₹3,845 (1.37%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹2.8 L
EMD Value
₹2,800
Closing Date
25 Jul 2024, 5:00 pmClosed
SE EUDC
35-B RAMPUR GARDEN BAREILLY
Different Electrification works under Full Deposit Scheme-2024-25 under EUDD-III Bareilly
2024_MVVNL_938040_1
T-34/EUDCB/2024-25
Open Tender
Electrical Works
Item Rate
45 days
EE EUDD-III BAREILLY
AS PER TENDER FORM
3 documents required · 3 mandatory
₹1,180
SE EUDC
₹2,800
29 Oct 2024
12 Jul 2024
24 Oct 2025
12 Jul 2024
25 Jul 2024
12 Jul 2024
Amount
For the work of Shiting of 100 KVA T/F with Structure on request Shri Prem Babu Sharma, Rajendra Nagar ,Bareilly under Full deposited fund-2024-25 under EUDD-III, Bareilly.
Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading.
ST PoLe (11 Mtr. Long)
11 KV XLPE Cable (3X185 sqmm)
11 KV Cable Jointing Kit (3X185 sqmm) O/D .
Distribution Box ( 03 Phase)
Stay Set
AB Cable (3x120 sqmm)
Other Line materails
Erection Work
Dismentling of Existing D/pole and safe back caariege from site to C.B. Ganj Central Store , Bareilly
Erection of new ST D/Pole including digging of pit & grouting work complete and fitting of all accessories complete.
Laying of 11 KV XLPE Cable (3X185 sqmm)
Hoisting of. 15 meter 11 KV XLPE Cable on D/Poles situated at both side of road including cost of 12 meter 6 inch dia G.I Pipe (Material will be supplied by Contractor).
Fixing of 11 KV Cable Jointing Kit (3X185 sqmm) O/D .
Dismentling of 100 KVA T/F from existing D/Pole and shifting on newly erected D/pole .
Chemical Erathing of Body & Neautral .
Erection of Stay Set Complete .
Earthing of Poles by MS Earthing rod
Laying of AB Cable (3x120 sqmm).
Mounting & Fixing of Distribution Box ( 03 Phase) along with making all connections.
Fixing of Other Line materials i.e , 11 KV Pin Insulator with Pin-09 Nos., Top Channel-04., S/s Base Angle-02 No. Etc.
Supply & Fixing of Following Items
Nut & Bolts .
Percing Connector
PG Clamps
Clamps with nut Bolts
For the work of Shiting of LT Pole on request Shri Rajendra Singh, Model Town ,Bareilly under Full deposited fund-2024-25 under EUDD-III, Bareilly.
Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading.
ST PoLe (11 Mtr. Long)
Erection Work
Dismentling of old Pole from Site and back carriage to Central Store C.B Ganj, Bareilly.
Erection of new ST Pole including digging of pit & grouting work complete and fitting of all accessories complete
Erathing of Pole .
Supply & Fixing of Following Items
Clamps with I-Hook
Clamps with nut bolts
For the work of Shiting of LT Pole on request of Shri Anirudha Prasad, 100 Futa Bareilly under Full deposited fund-2024-25 under EUDD-III, Bareilly.
Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading.
PCC Pole (8.5 Mtr. Long)
Erection Work
Erection of new PCC Pole including digging of pit & grouting work complete and fitting of all accessories complete
For the work of Giving new Connection of 125 KVA (Multipoint) to Shri Pankaj Suri, A-403, Bake Bhihari Temple Road, Bareilly under Full deposited fund-2024-25 under EUDD-III, Bareilly.
Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading.
ST PoLe (11 Mtr. Long)
11 KV Cable Jointing Kit (3X120 sqmm) I/D & O/D .
11 LV XLPE Cable (3X120 sqmm)
New 250 KVA T/F
Stay Set
Other Line materails
Erection Work
Erection of new ST D/ Pole including digging of pit & grouting work complete and fitting of all accessories complete
Erection of new ST Pole including digging of pit & grouting work complete and fitting of all accessories complete
Laying of 11 KV XLPE Cable (3X120 sqmm)
Fixing of 11 KV Cable Jointing Kit (3X120 sqmm) I/D & O/D .
Hoisting of. 30 meter 11 KV XLPE Cable on D/Poles situated at both side of road including cost of 06 meter 6 inch dia G.I Pipe (Material will be supplied by Contractor).
Erection of Stay Set Complete
Erathing of Poles
Installtion of 250 KVA T/F alongwith making all connections .
Fixing of Other Line materials i.e , 11 KV Pin Insulator with Pin-06 Nos., Top Channel-09., S/s Base Angle-02 No. Etc.
Supply & Fixing of Clamps for TOP Channel with nut & Bolt .
For the work of Shiting of LT Pole on request of Mohd. Saleem Khan , kankar tola, Bareilly under Full deposited fund-2024-25 under EUDD-III, Bareilly.
Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading.
ST Pole (9.00 Mtr.)
Stay Set
03 Ph Distribution Box
Erection Work
Erection of new ST Pole(9mtr.) including digging of pit & grouting work complete and fitting of all accessories complete
Erection of Stay Set Complete
Erathing of Poles
Mounting & Fixing of 03 Ph Distribution Box alongwith making all conections.
For the work of Shiting of LT Pole on request of Shri Chetan Anand , Rajeev Enclave, Bareilly under Full deposited fund-2024-25 under EUDD-III, Bareilly.
Carriage of following materials from E.S.CS store C.B Ganj to work site including loading & unloading
PCC Pole (8.5 mtr.)
Erection Work
Erection of new PCC Pole (8.5mtr.) including digging of pit & grouting work complete and fitting of all accessories complete
Supply & Fixing of LT Clamps with nut Bolts.
For the work of Shiting of LT Pole on request of Shri Dalhjeet Singh,C-534 Rajendra Nagar , Bareilly under Full deposited fund-2024-25 under EUDD-III, Bareilly.
Carriage of following materials from E.S.CS store C.B Ganj to work site including loading & unloading
PCC Pole (8.5 mtr.)
Distribution Box 03 Phase
Erection Work
Erection of new PCC Pole (8.5mtr.) including digging of pit & grouting work complete and fitting of all accessories complete
Mounting & Fixing of Distribution Box 03 Phase alongwith making all connections.
Supply & Fixing of Following Items
Distribution Box Clamps
Pecrcing Connector
For the work giving 60 KW multipoint connection to Mr. Sanjeev Kumar Sagar , Sherpur, Biharmaan Nagla , Bareilly under Full deposited fund-2024-25 under EUDD-III, Bareilly.
Carriage of following materials from E.S.CS store C.B Ganj to work site including loading & unloading
ST Pole (11 Mtr. Long)
11 KV XLPE Cable (3X70 sqmm)
11 KV Cbale Jointing Kit (3X70 sqmm) O/D
ACSR Weasal Conductor
New 100 KVA T/F
Other Line materails
Erection Work
Erection of new ST D/Pole (11mtr.) including digging of pit & grouting work complete and fitting of all accessories complete
Overhead Laying of 11 KV XLPE Cable (3X70 sqmm) 70 meter alongwith hoisting of cable .
Erection & Fixing of 11 KV Cbale Jointing Kit (3X70 sqmm) O/D
Erathing of Poles by MS Erathing rod
Mounting of 100 KVA T/F on D/pole .
Chemical Erathing Body & Neutral
Laying of ACSR Weasal Conductor
Fixing of Other Line materials i.e , 11 KV Pin Insulator with Pin-09 Nos., Top Channel-02, S/s Base Angle-02 No. Etc.
Supply & Fixing of Clamps for TOP Channel with nut & Bolt
For the work of erection of ST Pole for Pole Metering of M/s Yogesh Nirmaan Pvt. Ltd., Near Mega City Sanjay Nagar , Bareilly. under Full deposited fund-2024-25 under EUDD-III, Bareilly.
Carriage of following materials from E.S.CS store C.B Ganj to work site including loading & unloading
ST Pole (11 mtr.)
Other Line materails
Erection Work
Erection of new ST Pole (11mtr.) including digging of pit & grouting work complete and fitting of all accessories complete
Erathing of Pole by MS Erathing rod
Fixing of other Line materials i.e , Top Channel-02, S/s Base Angle-01 No. Etc.
Supply & Fixing of holding Clamps with nut & Bolt
JOSHI ELECTRICALS
PL ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .