Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-AOC | ₹5.2 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹6.0 L+₹75,950 (14.6%)Rejected-Finance | ₹6.0 L+₹75,950 (14.6%) | L2 | Rejected-Finance Not Being L1 |
| 3 | L3₹11.5 L+₹6.3 L (120.1%)Rejected-Finance | ₹11.5 L+₹6.3 L (120.1%) | L3 | Rejected-Finance Not Being L1 |
| Sl No | Description | Qty | Unit | M B SHYANI & CO L3 | M2Y ENTERPRISE L2 | N J Corporation L1 |
|---|---|---|---|---|---|---|
| 1.00Civil Works, brick work, plaster, including materials and labour | ||||||
| 1.10 | Site cleaning, layout marking and preparation | 2 | Set | 55,000 ₹1,10,000 | 7,900 ₹15,800 | 2,500 ₹5,000 Lowest |
| 1.20 | PCC Works (min. 6-inch) for foundation (8 feet x 8 feet) for flooring base on Floor | 15 | Sqm | 990 ₹14,850 Lowest | 1,250 ₹18,750 | 2,500 ₹37,500 |
| 1.30 | Brick/Block masonry in foundation and for walls (min. 6-inch) including cement mortar, wall hole, cutting of wall | 40 | Sqm | 1,404 ₹56,160 Lowest | 1,410 ₹56,400 | 2,000 ₹80,000 |
| 1.40 | Plastering work (internal and external)-25 mm both side as min. | 80 | Sqm | 660 ₹52,800 | 495 ₹39,600 Lowest | 750 ₹60,000 |
| 1.50 | Flooring with anti-skid ceramic tiles | 14 | Sqm | 2,000 ₹28,000 | 1,850 ₹25,900 | 1,750 ₹24,500 Lowest |
| 1.60 | Wall dado tiles up to 8 ft height | 40 | Sqm | 2,100 ₹84,000 | 1,900 ₹76,000 | 1,750 ₹70,000 Lowest |
| 1.70 | Roof work (FRP Sheet/Aluminium luxalon/Gypsum board/POP finish)- 8x8 feet | 14 | Sqm | 2,600 ₹36,400 | 2,400 ₹33,600 | 1,750 ₹24,500 Lowest |
| 1.80 | Painting (internal and external) | 80 | Sqm | 390 ₹31,200 | 265 ₹21,200 | 250 ₹20,000 Lowest |
| 2.00Plumbing & Sanitary work with materials and labour | ||||||
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
28 Jul 2026, 1:00 pmClosed
Sr Officer Purchase and Stores
Block-A Sangath SKYZ, Bhat-Motera Road, Koteshwar, Ahmedabad - 380005
Construction of Toilet room with three Urinals with full accessories at 3rd and 4th floor in ITER-India Lab building, IPR
2026_ITERI_911678_1
I-I/ET/26008/26-27
Open Tender
Civil Works
Works
90 days
ITER-India Lab Building, IPR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,000
Yes
25 Aug 2026
16 Jun 2026
29 Jul 2026
16 Jun 2026
28 Jul 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Works, brick work, plaster, including materials and labour | |||||
| 1.1 | Site cleaning, layout marking and preparation | - | Set | - | - |
| 1.2 | PCC Works (min. 6-inch) for foundation (8 feet x 8 feet) for flooring base on Floor | - | Sqm | - | - |
| 1.3 | Brick/Block masonry in foundation and for walls (min. 6-inch) including cement mortar, wall hole, cutting of wall | - | Sqm | - | - |
| 1.4 | Plastering work (internal and external)-25 mm both side as min. | - | Sqm | - | - |
| 1.5 | Flooring with anti-skid ceramic tiles | - | Sqm | - | - |
| 1.6 | Wall dado tiles up to 8 ft height | - | Sqm | - | - |
| 1.7 | Roof work (FRP Sheet/Aluminium luxalon/Gypsum board/POP finish)- 8x8 feet | - | Sqm | - | - |
| 1.8 | Painting (internal and external) | - | Sqm | - | - |
| 2Plumbing & Sanitary work with materials and labour | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_958136.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
AnnexureA.pdf
Tender Documents • 0.42 MB
BOQ_958136.xls
BOQ • 0.31 MB
Corrigendum-2.pdf
PDF • 0.33 MB
Corrigendum-1.pdf
PDF • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .