Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 2₹79.6 L+₹71.0 L (827.3%)Accepted-AOC AT PO TIRTOL PS TIRTOL JAGATSINGHPUR ODISHA 754137 | TIRTOL | JAGATSINGHPUR | ODISHA | 754137 | 2 | Accepted-AOC AS PER THE OPWD CODE | |
| 2 | 1₹8.6 LRejected-Finance | 1 | Rejected-Finance AS PER THE OPWD CODE | |
| 3 | 3₹84.3 L+₹75.8 L (883.0%)Rejected-AOC | 3 | Rejected-AOC AS PER THE OPWD CODE | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹85.9 L
Closing Date
18 Nov 2021, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER RWSS DIVISION JAGATSINGHPUR
OFFICE OF THE EXECUTIVE ENGINEER RWSS DIVISION JAGATSINGHPUR
EXECUTION OF RPWS TO SARALI AND ESR WITH C WALL FOR RPWS HANSURA UNDER KUJANGA
2021_RWSS_72100_1
SARALI-2021
National Competitive Bid
Civil Works - Water Works
Lump-sum
270 days
JAGATSINGHPUR
EXECUTION OF RPWS TO SARALI AND ESR WITH C WALL FOR RPWS HANSURA UNDER KUJANGA
2 documents required · 2 mandatory
₹10,000
Exempted
31 Jan 2022
30 Oct 2021
19 Nov 2021
30 Oct 2021
18 Nov 2021
30 Oct 2021
30 Oct 2021 - 12 Nov 2021
180 days
Amount
Laying and Jointing HDPE Pipe. Heading
Supplying all materials labour T&P design drawing,soil testing etc .complete in all respect for construction of RCC roof building ,pump house and construction of compoundwall for pump house and laying testing and commissioning of Rising main &Distribution system pipe line such as ,HDPE,,GI pipes etc along with required fittings and specials and construction of rcc valve chamber,public stand post ,individual house hold connection,stand alone,installation of chlorination,installation of submersible pump with moter and wiring of pump house & installation of Servor Stabilizer etc as per supplied drawing in section-7 and detail scope of work&technical specification,quantity of work mention in section -5 and in (AnnexureA to H except G) .All materials required shall be supplied by the contractor as per terms and condition of DTCN &all dimentions are as per supplied drawings and as per direction of Engg-in -charge.All work manner that all house hold of entire village will get required quantity of drinking water with residual chlorine of 0.2mg/ltr without any leakage in the entire PWS system(PWS-SARALI)
Design ,drawing construction erection,testing and commissioning of 50000 ltr capacity RCC elevated storage reservoir( circular type with spherical dome) of 12mtr staging height as per detail scope of work and technical specification mentioned in Section-5 and in Annexure-G including soil testing of SBC etc complete as per direction of Engg-in -charge.(PILE FOUNDATION )(PWS-SARALI)
Design ,drawing construction erection,testing and commissioning of 100000 ltr capacity RCC elevated storage reservoir( circular type with spherical dome) of 12mtr staging height as per detail scope of work and technical specification mentioned in Section-5 and in Annexure-G including soil testing of SBC etc complete as per direction of Engg-in -charge.(PILE FOUNDATION )PWS-HANSURA
Supplying all materials labour T&P design drawing,soil testing etc .complete in all respect for construction of RCC compound wall as per direction of Engg-in -charge.) SECTION - B PWS-HANSURA
Contractor shall maintain the PWS project for (5) calender years from the completion date of defect liability period i.e one year from the completion of the work in such a manner that the house hold of PWS scheme covered area will get(adequate)required quantity of supply of water taking supply hour as8hour/day without facing any problem.The contractor shall repair and replace any types of defect arise within 24 hour of receipt of complain either from public or from department.The contractor shall maintain all structure of pws schemes as per term and comditions of DTCN &technical specificationmentioned in section-5(PWS-SARALI)
DEBAKANTA MALLICK
KUBER MOHAN DAS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .