| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.4 CrAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹31.0 Cr+₹3.6 Cr (13.0%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | L3₹31.1 Cr+₹3.6 Cr (13.3%)Rejected-Finance | L3 | Rejected-Finance LoA issued |
Tender Value
₹28.8 Cr
EMD Value
₹5 L
Closing Date
5 Jun 2026, 5:00 pmClosed
The SE (Buildings), South Circle, Thiruvananthapur
O/o The SE (Buildings), South Circle, Thiruvananthapuram
GENERAL-Commissionerate Office at Pattom, Thiruvananthapuram-Construction of a multi storied building for various Commissions (Balance work)-Composite Work
2026_PWD_851812_1
PWD/BLDG/TR/20218/2023_23_2_1
Open Tender
Civil Works - Buildings
Percentage
540 days
Thiruvananthapuram
As per SBD
8 documents required · 8 mandatory
₹19,518
Yes
₹5 L
Yes
O/o The SE (Buildings), South Circle, TVPM
21 Aug 2026
20 May 2026
8 Jun 2026
20 May 2026
5 Jun 2026
20 May 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1APPENDIX A- Building Proper(Civil work) | |||||
| 1.001 | OD29277/2023-2024:Providing and laying in position ready mixed M-35 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in -charge. Note:- Minimum cement content considered in this item is @350 kg/cum. All work above plinth level up to floor V level (Excess/less cement as per mix design is not payable/recoverable) | 0.6 | cum | 13,870.59 | ₹8,322.35 |
| 1.002 | OD29272/2023-2024:Providing and laying in position machine batched and machine mixed design mix M-35 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 350 kg/ cum. All work above plinth level upto floor V level (Excess/less cement as per mix design is not payable/recoverable) | 1 | cum | 13,230.87 | ₹13,217.64 |
| 1.003 | 5.38:Extra for R.C.C. /B.M.C/R.M.C. work above floor V level for each four floors or part thereof. | 0.6 | cum | 360.17 | ₹215.74 |
| 1.004 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 0.58 | kg | 114.92 | ₹66.65 |
| 1.005 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 0.4 | sqm | 779.84 | ₹311.94 |
| 1.006 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | - | sqm | 1,030.96 | - |
| 1.007 | OD212041/2024-2025:Centering and shuttering including strutting, etc. and removal of form for: Columns, Pillars, Piers, Abutments, Posts and Struts having 45-degree or nearest inclination/ slope. based on 5.9.6 | 0.6 | sqm | 1,275.63 | ₹764.1 |
| 1.008 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | 1 | sqm | 843.14 | ₹842.3 |
| 1.009 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 0.6 | sqm | 982.6 | ₹589.56 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
affidavit.pdf
Additional Documents • 0.20 MB
preliminaryagmnt.pdf
Additional Documents • 0.21 MB
fot.pdf
Additional Documents • 0.26 MB
epay.pdf
Other Document • 0.07 MB
integritypact.pdf
Other Document • 0.01 MB
BOQ_1439279.xls
BOQ • 1.14 MB
bidpattom.pdf
Tender Documents • 31.74 MB
gstcorrigendum.pdf
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .